Document KR14wyjj1VeNdVjJZGwvgYXvK
Organization Resources Counselor^ Inc.
March 13, 1989
fJi (Medos
oRc. TfiSK
1910Sunderl<*nrl Place. \ \\ Waxhmginn, D C. 2003b 202-293-2980
foCCCL.
Fax: 202-29 3-2S15
Memorandum
To:
From: Subject:
ORC Asbestos Task Force ORC Occupational Safety and Health Group ORC Western Occupational Safety and Health Group
Rebecca L. Daiss </
Proposed Revision of Asbestos National Emission Standard for Hazardous Air Pollutants (NESHAP)
Attached is a copy of EPA's proposed revision of the Asbestos NESHAP, published in the January 10, 1989 Federal Register. The deadline for submitting comments on the proposal was March 7, 1989. EPA is now in the process of reviewing the docket and revising the proposal for final rulemaking.
ORC member companies have expressed concern primarily about proposed revisions pertaining to demolition and renovation (Section 61.145). Although there is general agreement that the proposal would improve the current standard in many respects, several member companies assert that the proposed revisions will result in a significant increase in the cost of these activities. A number of ORC members have submitted comments. The following is a summary of provisions that pertain to demolition and renovation. Also included is a list of concerns expressed by ORC members.
PROPOSED REVISIONS
Applicability
o The definition of Asbestos Containing Material (ACM) would be slightly revised in the proposal to clarify that the standard applies to materials that are non*friable but may be broken or crumbled and emit asbestos fiber during demolition operations.
notification
o Written notice detailing all planned demolition or renovation involving trigger level amounts of ACM would be required 10 days prior to the date of the demolition or renovation.
PLAINTIFF'S EXHIBIT
-2-
o General notice of all demolitions (whether or not asbestos is present) would be required.
o Notification within 3 days of the new start date would be required if demolition or renovation will start on a date
' other than that given in the notice or if reported information changes.
o Required notification would include an estimation of the amount of potentially friable ACM and the amount of nonfriable ACM which cannot be broken or crumbled during demolition or renovation.
o Required notification would include plans of actions to be taken if asbestos is found unexpectedly or if non-friable asbestos becomes friable.
Emission control Procedures
o Exemption from the requirement to use wet methods during demolition or renovation requires approval from EPA's Administrator.
o The use glove bag systems and the covering of friable material in leak-tight wrapping is permitted (in addition to local exhaust ventilation Bind collection systems) if wetting would damage equipment or cause unsafe conditions.
o A least one on-site supervisor of demolitions and renovations must be certified as having been trained in the provisions of the Asbestos NESHAP.
o Under specific conditions, large pieces of asbestos-covered equipment can be removed without first being stripped of asbestos.
Waste Disposal
o The responsibility for compliance with waste disposal provisions is shifted from the waste generator to the disposal site owner or operator.
o Demolition and Renovation contractors will be required to maintain records of waste shipments and submit summaries of records to EPA semiannually.
o Contractors will be required to give a copy of the waste shipment record to the disposal site owner or operator.
o Containers of waste must be labeled with the waste generators name and location of the source of the waste.
3-
MEKBER COMPANY CONCERNS
o The revised definition of non-friable nay significantly increase the anount of asbestos estinated to be present and the increase the number of demolition and renovation activities that would be regulated under the Asbestos NESHAP.
Also, broken, non-friable ACM would have to be handled in the same manner as friable asbestos even though it does not present the same risk.
o The requirement for notification of demolition operations, even when no asbestos is present will likely be costly and is unwarranted.
o Complicated renotification and scheduling requirements will result in a significant increase in paperwork without in creasing the safety of demolition and renovation operations.
o Cost of waste disposal contractors may increase do to added responsibility and increased waste disposal notification and handling requirements.
o While planned renovations and demolitions involving less than the specified amount of asbestos are not subject to the notification and reporting provisions, non-scheduled operations that involve less than the specified amount may be subject to those provisions. A provision, contained in the original rule and clarified in the proposed revision, requires notification and reporting if the total amount of asbestos to be removed in one calendar year from all non-scheduled operations is above the level specified in the standard. Under this provision, if the combined amount of asbestos involved in non-scheduled renovation operations at several facilities exceeds the specified amount, each facility is subject to notification and reporting provisions.
BD3:lgs
Tuesday
January 10, 1989
* I
Part III
Environmental Protection Agency
40 CFR Parts 61 and 763 Asbestos NESHAP Revision, Including Disposal of Asbestos Containing Materials Removed From Schools; Notice of Proposed Rule Revision and Opportunity for Public Hearing
4
912___________Federal Keglster / Vol. 64. No. > / Tuesday. January 10, 1989 / Propoed Rule*
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part* 01 and 763
tAD-FRL-OPTS-3469-4]
Aabsetoe NESHAP Revision, Including Disposal of Asbeatoe Containing Metadata Removed From School*
AOCMCr: Environmenlal Protection Agency (EPA).
action: Notice of proposed rule revision and opportunity for public hearing.
Nummary; There propoaed amendment* to the atbeato* National Emission Standard for Hazardous Air Pollutant* (NESHAP) require control device and fugitive emi**ion monitoring, recordkeeping, and reporting for atbettot milling, manufacturing, and fabricating operation*. For planned demolition* and renovation*, the notification requirement* are revited. and *afety i* added a* a reason for exemption from the use of wet removal methods. Recordkeeping i* required for asbestos waste disposal. Clarifying revisions are made to several definition* and provisions.
The existing standard and the proposed amendments implement section 112 of the Clean Air Act (CAA) and are based on the Administrator's determination that asbestos presents a significant risk to human health as a result of air emissions from one or more source categories and is therefore a hazardous air pollutant (see 36 FR 3031 (March 31.1971)). The standard proposed today amends the asbestos NESHAP to enhance enforcement and promote compliance with the current standard without altering the stringency of existing controls.
These regulations also would implement, in part aection 203(h) of the Asbestos Hazard Emergency Response Act (AHERA) to the extent they apply to disposal of asbestos removed from school buildings.
A public hearing will be held, if requested, to provide interested persons with an opportunity for ora) presentation of data or views concerning the propoaed amendment*
OATES: Comments. Comments must be received on or before March 7.1969.
Public Hearing. If anyone contacts EPA requesting to speak at a public hearing by January 31. I960, a public hearing will be held on February 6.1969 beginning at KfcOO am Persons interested in attending the bearing should call Ms. Ann Eleanor at telephone no. 919-641-6578 to verify that a hearing will occur.
Request to Speak at Hearing Persons wishing to present oral testimony most contact EPA by January 31.1969.
ADORCSU6: Comments. Comments should be submitted (in duplicate if possible) to; Central Docket Section (1X-131). South Conference Center. Room 4. Attention; Docket No. A-66-28. U.S. Environmental Protection Agency. 401 M Street SW.. Washington. DC 20460.
Public Hearing. If anyone contacts EPA requesting a public hearing, the hearing will be held at the EPA Office of Administration Auditorium. Research Triangle Park. North Carolina. Persons who want to present oral testimony should notify Ms. Ann Eleanor. Standard* Development Branch (MD13). U.S. Environmental Protection Agency. Research Triangle Park. North Carolina 27711. telephone no. 919-54165*6. Persons interested in attending the hearing should call Ms. Ann Eleanor to verify that a hearing will occur.
Docket. Docket No. A-86-26. containing supporting information used in developing the proposed standards revisions, is available for public inspection and copying between 6XX) a m. and 4:00 p.m., Monday through Friday, at EPA`a Central Docket Section. South Conference Center. Room 4. West Tower Lobby. Gallery 1. Waterside Mall. 401 M Street SW,, Washington. DC 20460. A reasonable fee may be charged for copying.
SOR FURTHER INFORMATION CONTACT
For information concerning the policy aspect* of the proposed standard revisions, contact Mr. Sims Roy. Standards Development Branch. Emission Standards Division (MD-13). U.S. Environmental Protection Agency. Research Triangle Park. North Carolina 27711. telephone no. 919-541-5263. For Information oonearning technical aspects, contact Mr. Bruce Moore. Industrial Studies Branch, telephone ao. 919-541-6460. at the same address.
9UFFLSMEMTART MFORMATKMC
Introduction
Section 112(a)(1) of the CAA defines a "hazardous air pollutant" as one that the Administrator Judges "causes or contributes to air pollution which may reasonably be anticipated to result in an increase in mortality or an increase In serious irreversible, or incapacitating reversible illness." Section 112(b)(1)(A) of the CAA requires the Administrator 4o publish a list that includes each hazardous air pollutant for which he intends to establish an emission standard under this section. Asbestos was listed as a hazardous air polhitent
ander section 112 on March 31.1971 (36
FR 3031). Initial standards controlling milling,
manufacturing, demolition, spraying,
and roadway sources of asbestos emissions were promulgated on April 6. 1973 (36 FR 8620). These standards were based on the 1970 conclusion by the National Academy of Science (NAS) that asbestos emissions from major manmade sources should be minimized.
On October 14.1975. the demolition standard* were revised to place additional requirements on demolitions ordered by State or local governments besides notification requirements
already in effect, and the standard was expanded to cover renovation activities, use of asbestos in friable insulation, and waste disposal (40 FR 46299). Work practices covering emissions from demolition and renovation were
amended on June 19.1976 (43 FR 26372). and were repromulgated on April 5.1964 (49 FR 13656). to reinstate work piactice
and equipment controls held not to be emission standards by the Supreme Court in its decision in Adamo Wrecking Company v. United Stoics. 434 U.S. 275 (1978). The 1977 amendments to the CAA authorize work
practice standards when it is not feasible to prescribe an emission standard. Such an instance occurs, for
example, when a pollutant cannot be emitted through a conveyance designed and constructed to emit or capture such a pollutant or when a measurement
methodology is not available.
A general review of the current asbestos NESHAP was undertaken to evaluate the consistency of the existing standard with current EPA policies for NESHAP regulatory development, the availability of improved emission
controls, the need to improve compliance, and the integration of the NESHAP with other regulator} requirements. The EPA determined th.ii.
when complied with, the asbestos NESHAP ia effective in reducing aaiissions and protecting the public health. However. EPA also concluded that many demolition and renovation
sources do not comply with the remov at
and waste disposal provisions of the
current standard, and that some additional work practices should be required. Also, there is a need for an explicit requirement to monitor air pollution control devices at milling, manufacturing, and fabricating sources
to ensure their proper operation.
A riak-basad approach was also considered in the review of the current asbestos NESHAP. However, questions regarding how EPA weighs a range of health, risk, and other factors in
I i
Federal Register / Vol 54, No. 0 / Tueaday. January 10, 1989 / Propoaed Rule*
913
establishing an ample margin of eafety
for NESHAP* were raised in the Oiatrict of Columbia Circuit Court deciaion in the Natural Resource* Defense Council v. SPA. 624 F. 2d 1146 (D.C. Cir. 1087). "vinyl chloride care." In the vinyl chloride deciaion. the court preachbed a
two-step proceaa under which the Adminiatrator muat firat determine an acceptable riak level baaed on conaideration of health and riak factora alone, and then determine the level at which to act the atandard in order to provide an ample margin of aafety, which can include conaideration of coata. feaaibility. and other relevant factor*. In connection with regulation of aomc aourcer of benzene, the Agency haa recently published in tba Federal RegSatar (43 FR 26496) four propoaed
approachea for implementing the vinyl chloride deciaion. Public comment oo
theae approachea ia being aought. and theae commend will be reviewed before
the Adminiatrator makea a deciaion regarding which approach to uae to develop NESHAP atandard*. Until the
NESHAP policy ia clarified. EPA cannot complete ita work on risk-based propoaala for reviaion of the aabeatoa NESHAP. At thia time, the Agency ia mcrel> revising the portion* of the atandard that are not riak-ba*ed to clarify their intent and to facilitate their enforcement
Today'a notice propo*ea to amend the NESIIAP to enhance enforcement and
improve compliance by (1) permitting the use of percent by area a* an expression for the asbestos content of bulk materials; (2) adding monitoring ond recordkeeping provisions for asbestos milling, manufacturing, and
fabricating operation*: (3) revising notification requirement* for demolitions and renovations; (4) adding recordkeeping and leporting provision*
for w.ixie di.posal; and (S) making other rev is.on* that clarify the rule and its intent and implement enforcement
determinations previously made. None of the proposed amendments affects the at. ingenc) of controls: accordingly, the amendment* are not affected by the v iny I chloride decision.
The EPA may issue a second proposal at a later date that would include a review of the stringency of controls, and
propose possible uanges to the stiingency of controls. Such a proposal would follow the '`acceptable risk" and
"ample margin of safety" requirements of the vinyl chloride decision.
These rule*, to the extent they apply to disposal ol asbestos from schools, are also being issued under authority of Al IKKA. AHERA enacted Title II (section* 201 thru 214) of the Toxic
Substance* Control Act (TSCA), codified at IS U.S.C. 2641 thru 2654.
Section 203 of TSCA requires EPA to promulgate regulations governing asbestos-containing material In schools.
The EPA ia to issue several specific kind* of rules, including inspection rules, rules for determining appropriate actions to take in response to potential asbestos hazards ana rules to require implementation of management plans for asbestos.
On October 17,1967. EPA issued most of the regulations mandated by section 203 (52 FR 41826. October 30.1067). The regulations are codified at 40 CFR Part 763. Subpart E. However, the Agency did not promulgate rules for asbestos waste disposal required under section 203(h). Failure to promulgate the disposal rule* resulted from a decision EPA made when the section 203 rules were proposed in April 1987 (52 FR 15620). The EPA had reasoned ist.
since the asbestos NESHAP covers wastes from all buildings including
schools, the section 203(h) disposal rules should be included in the NESHAP. At the time. NESHAP revision* were expected to be proposed in the summer of 1967. Due to the vinyl chloride decision, however, the NESHAP revision* ware not proposed as expected.
The EPA continues to believe that It Is Inappropriate to have separate regulation* for disposal of asbestos from schools and from other buildings. However, because of the uncertainty caused by the vinyl chloride opinion. EPA may issue final regulations under section 203(h) applicable only to disposal of asbestos from schools and may incorporate such regulations into 40 CFR Part 763. basing them on this proposal.
The standard under which these regulations are to be issued under TSCA Title 11 is provided by section 203(a). which requires that any regulation promulgated under section 203 "must protect human health and the environment." The EPA believe* that these regulations will protect human health and the environment under the section 203(a) standard because they will facilitate enforcement of existing regulations governing disposal of asbestos from schools, as noted in this
Sreamble. The EPA. however, does not elieve that these regulations necessarily complete its obligation under section 203(h). If at a later date risk-based revisions to the NESHAP are issued, the remainder of the Agency's obligation under section 203(h) will be fulfilled.
This preamble first provides background information in the form of a brief description of the health effects associated with exposure to asbestos and a summary of the widespread Federal authority for regulating asbestos. The preamble then summarise* the proposed amendments. Next, the environmental, health, energy, and economic impacts of the proposed amendments are summarized. The rationale is then provided for each decision made in selecting the propoaed amendments. Also discussed are the impacts of the recordkeeping and reporting requirements. Administrative considerations, including Executive Order 12291 and the Regulatory Flexibility Act (RFA) are described at the end of the preamble. The preamble consists of the following;
Background Summary of Change* to Asbestos
NESHAP --General
--Milling. Manufacturing, and Fabricating Sources
--Demolition and Renovation
--Waste Disposal
Summary of Environmental. Energy. and Economic Impacts
Rationale --Demolition and Renovation --Milling. Manufacturing, and Fabricating --Waste Disposal --Spraying --Roadways --Definitions
Impacts of Reporting Requirements Regulatory Flexibility Act
Public Hearing Docket Miscellaneous.
Background
Diseases associated with asbestos exposure include asbestosis. mesothelioma, cancer of the lung, ami cancer of the gastrointestinal tmet. Astiesfosis is a pulmonary fibrosis caused hv the accumulation of asbestos
fibers in the lungs and ia usually associated with occupational exposure to asbestos concentrations much higher than those that normally occur in outdoor air. Meaolhelioma ia a cancer of (he pleura or (he peritoneum.. Mesotheliomas are rarely curable, and death uaually reeulta within a year of. diagnosia. Asbeatoa-induced lung cancer usually has a latency period of more than 20 yean, and few cases of lung. cancer ate curable. A number nf epidemiologic studies of asbestos workers have indicated increases in esophageal, stomach. colorectal, kidney, laryngeal. pharyngeaL and buccal-cavity
14 fdirl Roller / Vol. 54. No. 8 / Tuesday, January 10, 1989 f Proposed Rules
cancers, though at a smaller magnitude
of Increased cancer risk than lung
cancer and mesothelioma. The health aspects of asbestos are discussed in the Health Effects Document for asbestos, which Is available from the EPA Library (MD-3S). Research Triangle Park. North Carolina 27711. Please refer to Airborne Asbestos Health Assessment Update
(EPA eoo/a-M/0030ln evaluating the coverage and
effectiveness of the existing asbestos
standards under section 112. ft is important to recognise the widespread use of Federal authority to control
asbestos use and exposure. Within. EPA. regulations for asbestos have been issued under the CAA. TSCA. the Resource Conservation and Recovery Act (RCRA). the Ciean Water Act
(CWA). the Federal Water Pollution Control Act (FWPCA). and the Comprehensive Environmental Response. Compensation, and Liability Act (CERCLA). Under the authority of
TSCA. EPA has promulgated regulations requiring inspection for asbestos in schools, and has published regulations
to require Stale/ioca! governments not covered under FederafOccupational Safety and Health Administration
(OSHA) requirements for asbestos abatement projects to comply with the Federal OSHA requirements. Under AHERA. EPA has promulgated regulations to protect public health and the environment from asbestos in school buildings. Additionally. EPA. under the authority of TSCA. has proposed to ban certain asbestos products and phase out Other such products (SI PR 3738. |anuary
29.1986). Guidelines for proper disposal of asbestos waste have been published recently by EPA Under CERCLA. EPA has developed a Reportable Quantity
(RQI of one (1) pound for asbestos waste. The EPA also has set asbestos effluent standards for some source
categories (40 CFR 427) and developed water quality criteria (45 FR 79326) for asbestos.
Outside of EPA the Department of Labor's OSHA and Mine Safety and
Health Administration (MSHA) control
workplace asbestos exposure levels. The OSHA has promulgated a revised workplace standard that reduces the allowable workplace exposure level as an 8-hour time-weighted-average (TWA) from 2j0 fibers per cubic centimeter (f/ cc) to 02 f/cc (29 CFR 1910.1001 and 29 CFR 192056). The OSHA regulations protect workers (the NESHAP protects public health principally) and require certain actions, such as the use of
watting techniques, to prevent the workplace concentrations from reaching the permissible exposure limit of 0.2 f/
cc. Asbestos use in some consumer products is regulated by the Consumer Product Safety Commission (CPSC). The U.S. Department of Transportation (DOT) has regulations covering the transportation of asbestos and asbestos products. Recently. DOT promulgated regulations in compliance with the Superfund Amendments and Reauthorization Act (SARA) of 1966 that cover the transportation of asbestoscontaining waste material (SI FR 42174. November 21.1966). The effective date of these regulations was subsequently delayed to July 1.1987.
Summary of Change* to Asbestos NESHAP
General
The regulation is reorganized by combining applicability, notification requirements, and procedures for asbestos emission control into a single standard for demolition and renovation. It requires milling, manufacturing, and fabricating operations to monitor visible amissions daily, inspect air cleaning devices weekly, and keep records. The regulation also requires recordkeeping and reporting for waste disposal activities.
In general, compliance with the NESHAP approaches 100 percent for all operations except demolition and renovation, including disposal of demolition and renovation waste, where It is estimated to be about 50 percent for demolition and about 80 percent for renovation. As a result of this noncompliance, aignificant asbestos emissions occur, with those from the disposal of demolition waste greatly exceeding other emissions, including those from asbestos milling, manufacturing, and fabricating. Several amendments are proposed to improve compliance with and enforceability of the NESHAP and to help ensure proper operation and maintenance of control equipment.
Milling. Manufacturing, and Fabricating Sources
This proposal requires asbestos milling, manufacturing, and fabricating sources to perform daily monitoring for visible emissions and weekly inspection of air cleaning devices.
Demolition andRenovation
This proposal clarifies the definition of demolition to recognize that intentional burning is a method of demolition. An additional notification provision requires owner* or operators to contact EPA in advance of the actual atari date if the demolition or renovation wilt begin on a date other than the one
specified in the original notification. The requirement that the on-site supervisor at asbestos removals be trained in procedures for removal and handling of asbestos-containing material in accordance with the NESHAP is also a new provision in the regulation
Waste Disposal
An amendment is proposed to make the waste disposal site operator responsible for complying with the waste disposal site provisions. Under the current NESHAP. the waste generator Is responsible for selecting a disposal site that meets the waste disposal requirements of the NESHAP. A new requirement is added for keeping records that ahow the location and quantity of asbaslos waste disposed of at disposal sites and for noting this Information on the deed to property when the site become* inactive.
Summary of Environmental. Energy, and Eoooomic Impacts
The environmental, energy, and
economic impacts of the proposed amendments for demolition and renovation, including waste disposal, were estimated from two baselines. One is full compliance with the NESHAP. and the other is current use ol engineering controls and work practices. Enforcement experience indicates that many asbestos removal operations related to demolition and the aubsequent waste disposal operations related to both demolition and renovation are performed out of compliance with the NESHAP. The lack of compliance with the NESHAP removal provisions leads to the improper disposal of some waste, specially demolition waste, with the result that emissions from the disposal of demolition waste greatly exceed other emissions, including process emissions from milling, manufacturing, and fabricating. Liability and other considerations generally lead the owner* of buildings being renovated to follow or even exceed the requirements
of the NESHAP. Thus, the baseline for demolition and renovation is current use of work practices rather than full compliance. At asbestos milling, manufacturing, and fabricating facilities, the required air pollution control devices ora generally in place. Thus, for milling, manufacturing, and fabricating, full compliance with the NESHAP. including the waate diaposal requirements, is assumed for me baselinr.
Impacts of the demolition and renovation amendments are based on etimatad annual emissions of asbestos. Emission estimates are the product of
Federal Register / Vol. 54. No. 6 / Tuesday. January 10. 1969 / Propoted Rule*
15
emissions per unit of asbestos removed and disposed of and the average
quantity of asbestos removed and disposed of annually. The annual
amount of asbestos removed and waste generated was estimated using representative models of asbestoscontaining structures and projections of the average number of demolitions and renovations for an 83-year period (i.e., the time during which all asbestos-
containing structures are expected to be demolished or renovated to remove asbestos). Impacts of the proposed
amendments, including the waste disposal provisions, for milling, manufacturing, and fabricating are based in part on information from confidential data submitted to the Office of Pesticides and Toxic Substances (OPTS) under section 8(a) of TSCA and on information obtained under section mof CAA.
Little emission measurement data exist for asbestos sources. Thus, emissions were estimated using engineering methods and numerous assumptions, which resulted in substantial uncertainty. A detailed description of the approaches used to
estimate emissions is found in "Asbestos Emission Estimates for Milling. Manufacturing. Fabricating. Demolition. Renovation, and Waste Disposal." which is contained in Docket
A-68-28. Estimated emissions from asbestos removal activities associated with demolition and renovation assuming full compliance are about 700 kg/yr. Estimated emissions from waste disposal, assuming full compliance with
the KESHAP by all sources, are about 600 kg/yr. Estimated process emissions under the current NESHAP at full
compliance for milling, manufacturing, and fabricating are approximately 7,400 kg/yr.
As lias been stated previously, enforcement experience indicates that a
significant amount of asbestos material is handled out of compliance with some
of the provisions of the NESHAP. An estimated SO percent of asbestos
removal operations related to demolition and renovation are performed without EPA notification,
implying that many asbestos removals and the subsequent waste disposal operations are performed out of compliance with the NESHAP. However, without precise information on the relationship between notifications and level of compliance, the actual degree of compliance with the NESHAP is uncertain. The amendments being proposed today are intended to increase the level of compliance with the demolition and renovation provisions.
thereby reducing emissions, yet the extent to which emissions would be reduced by the proposed amendments cannot be quantified precisely.
The following estimates of nationwide emissions are based on current practices- Emissions for milling, manufacturing, and fabricating are the same as for full compliance. Estimated emissions from demolition and renovation are approximately 1.300 kg/ yr. Estimated waste disposal emissions from all waste are 227,000 kg/yr.
The costs of the proposed amendments are expected to be small relative to normal operating costs for these industries. The amendments are intended to promote compliance and codify existing good practices. Small additional costs are associated with the recordkeeping and reporting requirements of the amendments. Economic impacts of the alternatives included in this proposal are expected to be minimal. Adverse impacts of the proposed amendments on water, noise, and energy were considered. Due to the nature of the amendments, no significant adverse impacts on water, noise, or energy are anticipated.
Rationale
Demolition and Renovation
Sections 61.145 through 61.147 of the existing asbestos NESHAP require removal of friable asbestos materials prior to demolition and require controls during removals associated with demolition or renovation. Costs and benefits attributable to the.NESHAP for asbestos removal during renovation are difficult to establish because removal operations are also subject tO"the requirements of existing Stite and OSHA regulations for occupational exposure. As noted earlier. EPA has promulgated regulations under the authority of AHERA that cover asbestos removals at school buildings. Furthermore, many renovations already use controls exceeding those in the NESHAP because of the concern over occupant exposure once the renovation is completed and the building is returned to use. In demolition, however, occupant exposure is not typically a factor so that asbestos removal is generally not as strictly controlled as it is in renovation. Thus, the potential for emissions is usually greater in a demolition than in a renovation.
The major provisions of the current demolition standard ere the requirement for removal (and control during removal) of friable asbestos material prior to demolition and the requirement for proper waste disposal. Because these two provisions are tied intimately to One
another (i.e.. the waste disposal provisions cover the waste generated by
the removal requirement), the impacts ' related to asbestos removal and waste disposal must be considered together in
evaluating amendments to the demolition standard.
As explained above, the existing
NESHAP was evaluated at two levels of compliance. It was evaluated at full
compliance and. because enforcement experience indicates substantial
noncompliance, it also was evaluated based on current practice. At full compliance, nationwide asbestos
emissions from removal and waste disposal under the current NESHAP would be an estimated 1.100 kg/yr. The
uncertainty associated with estimates of emissions is very large.
The extent to which asbestos is handled out of compliance with the NESHAP demolition and renovation
regulations is uncertain and depends on various factors. For example, because of OSHA and State and local regulations and pressures from other sources, including the general public, renovations
and waste from renovations may be
well-controlled even if EPA is not notified. Removal emissions associated
with renovation are small and do not constitute a significant fraction of the total emissions from removal and waste disposal combined. Demolitions,
however, are not affected by other
regulations to the extent that renovations are. Thus, the absence of a notification may indicate that an
asbestos-containing structure is demolished with the asbestos left in place. However, asbestos emissions from the disposal of the demolition debris may be overstated because some of the waste might still be incidentally deposited in a landfill and covered. Under the existing NESHAP. assuming 50 percent compliance with the notification requirement nationwide
asbestos emissions are estimated as about 228.000 kg/yr. Increasing compliance to 100 percent would reduce
estimated emissions to 1.100 kg/yr. a decrease of approximately 227.000 kg/
yr. Considering the magnitude of asbestos emissions associated with current practice, amendments are being proposed to facilitate enforcement and
promote compliance. A proposed revision to the standard
includes the addition of a volume equivalent of 1 m* (35 ft*) in addition to the IS m* (160 ft*) and 80 m (260 ft). A volume of 1 m* is equivalent to IS m* of asbestos assuming a typical thickness of 7.6 cm (3 in.). This was requested by enforcement officials who stated that they often arrive at asbestos removal
816 Federal Register / Vol. 54. No. 6 / Tuesday. january 10. 1889 / Propoaed Rules
operations, for which no notice waa given, and find the atbealot already in
containers. A volume equivalent will facilitate the determination of bow much asbestos is Involved.
A statement is added to clarify that
the asbestos-containing materials to which the standards are applicable are
friable asbestos materials and also materials that are nonfriablc but may be
broken or crumbled and emit asbestos fiber during demolition operations if not removed and disposed of properly. For example, asbestos cement board is not considered friable or likely to emit asbestos fibers under normal usage. However, if fractured or crushed during a demolition or renovation, it will emit
fibers and. under today's proposal, would be considered friable under those conditions. Some nonfriable asbestoscontaining materials, such as packings, gaskets, asphalt roofing, and vinyl
flooring, that normally do not emit asbestos fibers are not subject to the removal and disposal provisions of the standard; however, even these nonfriable materials may be subject to regulation under certain conditions e.g..
during the sanding of vinyl-asbestos flooring or when asphalt roofing is ohl and severely weathered. Under the
proposed amendments, the amounts of these nonfriable materials must be estimated and reported if a notification
is required. The amounts of nonfriable
materials, such as asbestos-cement products, that potentially can emit fibers must be included in the quantities reported in the notification.
Several amendments being proposed today are intended to promote notification and increase compliance. These provisions include allowing a uniform 10-day period for written
notification of all planned demolitions or renovations. This uniform notification requirement has been requested by industry and enforcement
representatives and. in conjunction with the other notification requirements that would be added, is expected to improve
compliance because it is simpler and easier to understand. Howaver. the degree to which compliance would be
improved over current practices cannot
be quantified precisely. To assist enforcement personnel in tracking asbestos demolitions, notification is required by the following workday for demolitions ordered by State or local government agencies and not later than the following working day after
stripping or removal work begins for emergency renovations. If asbestos removal at a demolition or renovation site starts on a date other than that specified in the notice or if the other
repertrd information changes, renotifiration is required and must be postmarked at least 5 working days or received at least 3 working days prior tu the new start date. Notices that are mailed arc required to be sent bycertified mail, return receipt requested, in order to allow the contractor to
demonstrate that EPA was notified. Further. | 61.145(b) is amended by prohibiting asbestos removal at demolitions and renovations from starting on any date other than the one contained in the applicable notification
The purpose of this amendment is to allow enforcement personnel to observe removal operations at demolition and renovation sites. This requirement is
needed because some asbestos removal operations are completed before thr starting dates specified in the notification, precluding inspections for compliance by enforcement personnel.
The notification provisions have been revised to require, in addition to the name and address, the telephone number of both the owner and operator to provide enforcement personnel with information necessary to track
compliance activity and to prioritise inspections The proposed amendments clarify that, if the demolition or
renovation operation will involve less than the total amount of asbestos materia) in the facility, only the amount
to be removed has to be reported. The
revised notification provisions require that information on the amount of potentially friable asbestos-containing material and the amount of nonfriable
asbestos-containing material that will not become friable in the course of the demolition and renovation be reported in the notification. In addition, the owner or operator submitting a notification is required to include the procedure employed to delect the presence of asbestos materials as part of the notification. Knowing the procedure
used, enforcement personnel are better able to evaluate the adequacy of the building survey and asbestos analysis already required by the current
standard. Because building survey and analysis are already required, the additional coat of describing the
procedure employed is negligible.
To ensure that an effort is made to locate all of the asbestos, the current
notification provisions require owners or operators of demolitions and renovations to identify all asbestos,
including asbestos that is encased or covered by a nonasbestos material, prior to beginning operations that would
break up or preclude access to the material for subsequent removal. For example, the current NESHAP has been
correctly interpreted to require tliui friable asbestos pipe lagging covered with a nonfriable painted canvas m
metul jacket must be included in tinnotification and removed prior to a demolition or renovation that woul-.l disturb the asbestos or preclude an ess to it. Given the nature and complexity nf some renovations and demolition' it is possible that some asbestos may not! discovered until after demolition ot renovation has begun or previously nonfrisble materia) may become friable To cover these situations, the proposed amendments will add a requirement for owners or operators to include contingency plans in their notifications describing what they wdl do if they find
unexpected asbestos or if previously nonfriable material becomes friable Under the current standards, the demolition or renovation work would
have to cease until EPA was notified, but EPA decided that this would be unnecessary provided contingency plans are included in the notification. For
asbestos that is not discovered until after demolition begins, the owner or operator is given the choice of removing
the asbestos or. if removal cannot be done safely, keeping the asbestos and asbestos-contaminated debris wet This
revision is proposed in recognition nf a situation in which worker safety may Inthreatened and provides a reasonable
alternative while adequately controlling emitsiona. The only other exception' to
the requirements to remove friable asbestos are found in f 6l.i45(a)|3i. which applies to facilities demolished under a Stale or local government order, and in | 61.145(c)(l)(i). which applies to friable material encased in ennerete. In both of these instances, wetting nf the
asbestos is still required.
Another propoaed amendment requires the owner or operator submitting a notification to certify that at least one on-site representative, such
at a foreman or management-lev cl person trained at required by | 61.145(c)(6). will supervise the
demolition and renovation covered by the notification. Another amendment to this section specifies that the start and
completion dates required in the notification pertain to the dates th.it asbestos removal and related operations, such as site preparation, will
begin and and in addition to the scheduled starting and completion dales
of the demolition, wrecking, or (novation. Wailing periods between notification and initiation of work also are clarified to state explicitly that they refer to the initiation of asliestos stripping and removal and related work This clarifies the regulation to read as it
Federal Register / Vol. 54, No. 6 / Tuesday. lanuary 10, 1989 / Proposed Rulea
17
currently (a interpreted and would permit certain demolition and
renovation activities (such as site preparation, the removal of aalvageable fix lures and equipment, and other activities that do not disturb asbestos or preclude access to the material) to begin before the required waiting periods expire. It does not permit the demolition of nonasbestos structures before the required waiting period. This
accommodates the contractors' need to initiate varioua activities at demolition and renovation sites while giving enforcement personnel adequate advance notice.
The notification must state whether it is for a demolition or a renovation. In addition, a proposed amendment
clarifies the current requirement that notifications must be made for all demolitions, even when no asbestos is present, in order to promote compliance
and aid enforcement. In addition, a provision is added that makes it clear that planned renovations involving less
than the specified amounts of asbestos are not subject to the notification provisions of the regulation.
Additional notification requirements have been added for State or local
government-ordered demolitions, i 6114S(b)(4)(xiii). and emergency renovations, i 61.145(b)(xiv). Notification regarding ordered demolitions must now include the date the order was issued and the date on which the demolition was ordered to begin. This change was requested by
enforcement officials who were concerned that, without this requirement, the notification provisions for ordered demolitions would be abused. For emergency renovations, additonal information is required on the nature of the sudden unexpected event that necessitated the emergency renovation. This change was also requested by enforcement officials to prevent circumvention of the notification requirements by contractors
claiming that a renovation was an emergency.
To clarify whether planned
renovations involving individual, nonscheduled operations must comply with the notification provisions of
f 61.145(b). paragraph (a)(4)(i). is
modified to require that the additive amount of asbestos to be removed or stripped over a calendar year of lanuary 1 through December 31 be used instead if over the "maximum period of time a prediction can be made not to exceed 1 year." This clarifies the intent of the
current regulation to cover individual nonscheduled asbestos removal operations involving small amounts of
asbestos if the total amount of asbestos that will be removed in t year is projected to exceed the quantities of asbestos specified in | 61.145(a). When individual renovations exceed the cutoff, a separate notification is
required. tin the interest of worker safely, safety
will be permitted as a reason for exemption from the requirement to use
wet methods during removal although | 61.145(c)(3) will be revised to require that the Administrator's approval is obtained before removal begins. This provision is intended to cover obvious safety hazards such as electrical hazards and. in some instances, hot pipes or other facility components, which are not now mentioned in the
regulation. The EPA recognizes that what constitutes safety hazard may be open to interpretation; however, the Administrator must make that
determination on a case-by-case basis. For example, hot pipes may be the basis
for an exemption from wetting. In some
situations, however, the Administrator may determine that it is reasonable for a process to be shut down to allow the use of wet methods. The EPA does not intend for OSHA regulations to be violated in order to comply with the NESHAP.
Provisions are added that specify the conditions under which large pieces of asbestos-covered or asbestos-coaled equipment can be removed from a facility and transported, stored, and reused without first stripping the
asbestos. The addition of this provision recognizes that situations arise where certain large pieces of equipment can be removed and eventually reused without disturbing the asbestos.
An amendment to 161.145(c)(3)(i)(B) will allow two new work practices in
addition to the local exhaust ventilation system currently permitted for renovations where wetting would damage equipment or pose a safety hazard. The new work practices are use
of glove bag systems and covering friable material in leak-tight wrapping prior to removal.
The glove bag is similar in principle to love boxes used to confine and handle
azardous materials in laboratories and is a proven control technology widely used for small fobs. Clove bags, when properly designed, installed, and used, provide nearly complete isolation of the asbestos material. When properly used, they are at least as good as and probably superior to the use of local
exhaust ventilation. They typically are used in conjunction with wet removals where the wetting is done inside the bag. but glove bags also can be used
with dry removal techniques as well as with a High-Efficiency Particulate Air (HEPA) powered vacuum system for
evacuating the bag. The EPA intends for glove bags to be used with wet removal
methods inside the glove bags. While giovebags offer potential advantages, recent EPA and NIOSH studies have indicated potential problems with their use. Work place asbestos
concentrations during glovebag use have exceeded the OSHA permissible exposure limit. Although the source of the elevated asbestos levels was not identified, potential sources of fiber
release include air leaks, and vibrations in the pipe outside the giovebags.
Workers should be made aware of these potential problems and instructed in the
proper installation and use of giovebags. In addition, it is recommended that any worker using glove bags be protected by a respirator.
Covering friable material with leaktight wrapping prior to removal also
prevents asbestos emissions from being released into the air and provides an
alternative to stripping the asbestos, which increases the likelihood of asbestos emissions. Permitting the use of these two work practices acknowledges changes that have taken place in removal methods and increases the number of options open to demolition and renovation contractors for compliance with this regulation.
Section 61.145(c)(4) is revised to allow
operators to cover and seal facility components with a lead-tight wrapping for removing the components intact from a facility. This method is an effective means of emission control and is currently in use. A provision also is
added that permits the Administrator to approve equivalent control methods other than the wetting, glove bags, or leak-tight wrapping methods already allowed. (This provision is also covered
under the General Provisions, but it is included in this subpart for convenience.) So that inspectors can
readily determine if alternative methods have received Administrator approval, a
copy of the approval is required to be kept at the demolition or renovation site
for inspection. Section 61.145(c) is revised to apply to all asbestos material including materials that have been
atripped or removed. This is intended to clarify that materials that were not atripped but may have fallen off facility components must be treated the same as those that were stripped. Section
61.145(c)(6)(iv) la added to clarify that
materials that have been removed and ; were contained in leak-tight wrappings do not need to be unwrapped and wetted.
*18 Federal Register / Vol 64, No- > / Tuesday. January 10. 1989 / Propped Rules
Section M.14S(c)(B) add* the requirement that ail aibeatoa material
be atripped. removed, and otherwise bandied by a contractor or by a reprerentative of the facility owner or operator trained in the proviaioni of thi* regulation and the meane of complying with them. Thii requirement will ensure
that an on-site supervisor, such as a foreman or management-level person, has a knowledge of this regulation and approved methods of asbestos removal
and handling. The training on-site supervisor does not have to be at the site at all times but must present for a time sufficient to provide supervision of
asbestos-related operations. In addition, this proposed amendment requires that evidence that training has been
accomplished be made available for inspection by EPA during normal
business hours. This training does not
replace the training requirements of OSHA's workplace regulation (29 CFR 1920.56} or the general training recommended by EPA. The ultimate objective of this requirement is increased compliance with this regulation and decreased emissions. The annual cost of training in the provisions of NTSHAP is estimated to be about SI .9 million.
Comments made to EPA question the intent of the requirements in f 01.145(c)
for lowering stripped or removed materials to the ground or lower floors. The standard requires all facility components that have been removed in units or sections to be carefully lowered to the ground. Asbestos material, other
than that on facility components removed in sections or units, also must
be carefully lowered to the ground or lower floors. If the asbestos-containing material is more than SO feet above the ground, it may be transported by a leaktight chute or container. In all cases, it is the intent of the standard that asbestos materials be lowered carefully to the ground or a lower floor to the greatest
extent possible, not dropped or thrown. The use of a leak-tight chute to transport material stripped or removed 50 feet
above ground level is one exception to this. Another exception occurs during
the stripping of aabestos material from facility components. In these instances, if Is not always practical to prevent the tripped material from falling to the ground or floor, eg., during the stripping
of asbestos material from ceilings.
la addition to the proposed revisions discussed above, several editorial changes are proposed that are intended to daftly the intent of the regulation as it Is now written and make It more
understandable. The changes consist
primarily of adding a phrase or
substituting terms for clarity and are
removed as part of a renovation and is
based oo comments from both
concerned about his liability as a result
enforcement agendas end industry. One of the removal operation. The NADC
significant darifying revision to the
suggests that simplification of the
demolition and renovation requirements regulation would help promote
deals with the friability of materials and compliance because most demolition
is discussed under the Definitions
contractors are small businesses lacking
section of this preamble.
the educational and technical
The overall coats aasodated with
background to fully understand all the
these proposed amendments cannot be details of the regulation. The NADC sUu
quantified but are expected to be small suggests that asbestos materials that are
compared to actual removal and
tightly bound in a matrix and difficult to
disposal costs. Benefits also cannot be break ahouid be excluded from the
quantified precisely but should be
regulation because they are not likely to
commensurate with the increase in
release many asbestos fibers. Several
complisnce up to the benefits estimated NADC recommendationa are intended to
for full compliance.
facilitate notification, including a 10-duy
Comments on the proposed demolition notice for all jobs with approximate
and renovation standards were
atari and completion dates followed by
submitted by the National Association of Demolition Contractors (NADC).
a telephone notification giving specific starting dates. The written notification
many of whose members perform
would be on a form required by EPA.
asbestos removal work. In general. NADC believes that an increasingly
The NADC recommends that each onite supervisor be trained and suggested
stringent regulation increases
giving contractors some discretion in
noncompliance and results in increased selecting appropriate control methods
emissions rather than producing the
rather than prescribing specific work
desired opposite effect The NADC cites practices to be followed th all situations.
at reasons for current noncompliance
Finally, the NADC suggests that there be
the notification requirements that treat a procedure whereby unintentional
late notifications the same as no
violations could be corrected quickly
notification, and the difficulty of
without severe economic consequences
identifying all asbestos in a structure
resulting from imposed fines or lengthy
prior to demolition. Contractors'
delays.
concerns that an inapection may
The NADC comments include
discover the unsuspected presence of
recommendations for reducing asbestos
asbestos resulting in a citation and the emissions, including developmeni of
job delayed while notifying EPA are
regulations for abandoned buildings and
additional reasons notification may not reduction of disposal costs to promote
be given. The NADC claims that the
proper disposal. Disposal costs could be
contractors feel that no matter how hard reduced, according to NADC. by-
they try to comply with the NESHAP.
avoiding requirements for special
they are going to be found out of
handling or segregation methods and
compliance with some provision. They avoiding special recordkeeping
believe tbet by net notifying EPA. their requirements tbet will cause some
chances of being found in violation are disposal site owners to charge more for
substantially decreased. Finally. NADC asbestos waste in order to cover
feels that another reason for
potential liability costs and will
noncompliance is the perception that the discourage others from accepting
current NESHAP is not effective in
asbestos waste. To promote the use of
reducing amissions.
proper disposal sites, disposal sites
In describing ways to promote
should be encouraged to accept all
compliance with the NESHAP. NADC
asbestos waste and not question its
suggests developing separate
source or condition.
requirements for demolition and
The EPA has been evaluating NADCs
renovation because of differences in job comments and believes some have
characteristics, the extensive use of
merit. Several of their comments have
large equipment in demolitions as
already been addressed in the proposed
opposed to slower manual techniques in standard. The EPA to interested in
renovations, differences in resulting
receiving comments on eny of the issues
waste characteristics, and Was concern annealed by NADC as likely to improve
about water damage at the job site from compliance.
controlling dust with water at demolitions. A property owner who
Milling. Manufacturing, and Fabricating
wants a building demolished is not as
Under the existing standard, the
concerned about having a careful
owner or operator of an affected milling,
asbestos removal job done aa a properly manufacturing, or fabricating source
owner who wants to have the aabestos may meet e no-visible-emission limit nr
Fodarat Rfbtf / Vol. M. Mo. f Jueaday. lanunry 10.1989 / Proponed Rule*
<!
install emission cootrol .equipment
meeting the specification* described under f 61.154. Section 61.1S4 includes specifications for baghouses. but it also allows the use of wet collectors (Le mrubliers) It fabric fillers create a fire or explosion hazard.
Amendments are being proposed that will retain the existing controls now in place and add monitoring and recordkeeping provisions at a reasonable cost that will help ensure continued low emissions. Under these
amendments, the owner* or operators of milling, manufacturing, or fabricating operations are required to perfom. daily monitoring for visible emissions from
operating control devices and process fugitive sources and weekly inspections of control devices, maintain records of
monitoring and inspections results, and submit quarterly reports to CPA of results of visible emission monitoring, if v isible emissions occur during the reporting period. The recordkeeping and reporting requirements will provide information to EPA that can be used to alert enforcement personnel of operating
problems at individual sources and aid in determining compliance.
Some control device inlet loadings are high enough that visible emissions could
occur during a malfunction of a control device. For these sources, visible emissions could be useful as an early indicator of a malfunction. A 15-second
observation period for visible emission monitoring of each control device is proposed. Visible emission monitoring will identify problems and help to
ensure that pollution control equipment
ahieves its design emission reduction potential: weekly inspection of control devices will permit the early identification and correction of problems that could lead to bughouse failure and increased emissions. Some small air-cleaning devices do not permit
ready access for the interior inspection of bags. For such devices, the owner or operator will be required to submit a maintenance plan for the Administrator's approval. The
maintenance plan must include, as a niinimum. recordkeeping and a maintenance schedule. According to industry sources, visual monitoring and inspection are already practices at many facilities.
The EPA is proposing to delete the 4uith water gage requirement in 101.152
for all existing end new baghouses (realise many baghouses remove particles at high efficiencies at higher pressure drops. The proposed standard
allows the Administrator to authorise
the sulistitution of a wet collector for a f.iliric filler when it is determined that a
fabric filler is not feasible. Sch
situations may occur, for example, when a gas stream has s high moisture content or the particles are sticky end would cause blinding of e fabric filter. The current standard only permits the use of wet collectors wheo a fire or explosion hasard attends the use of a fabric filter.
Visible emissions from fugitive source* at milling, manufacturing, and fdbricating operations are also prohibited This amendment is not e new requirement because it clarifies the intent of the regulation as it is currently
implemented Assuming 100 percent compliance
with the existing control requirements, nationwide asbestos emissions from milling, manufacturing, and fabricating are estimated to total 7.400 kg/yr. The uncertainty associated with estimate* of
emissions is large end was discussed previously. The actual degree of compliance el present is unverifiable because of the leek of explicit monitoring^ inspection, recordkeeping, end reporting requirements. However, industry sources indicate that monitoring and inspection are currently practiced by most asbestos milling, manufacturing, and fabricating sources: therefore, additional costs resulting from these provisions should be small. The
recordkeeping and reporting coets also are estimated to be small and are included In the impacts of the repurling
requirements. The benefits of the monitoring, inspection, recordkeeping, and reporting provisions are unquantifiable. but the provisions will aid enforcement and improve
compliance to that emissions and health risks close to the estimates for 100 percent compliance are attained.
Section 01.144(a)(9) is also revised by specifying that chlorine manufacturing that uses asbestos diaphragm technology is regulated by the NESHAP and not chlorine manufacturing that
uses other technologies. This is a clarifying amendment' therefore, do costs are associated with this change.
Paragraph (a) of 161.153 on reporting
requirements is clarified to instruct new end existing million, manufacturing, and fabricating operations under what conditions and when they must report certain information on emiesioo control equipment and processes that geoerate
asbestos emissions. Bacause this amendment is a clarification, there are no associated coets.
Watte Disposal
Proviaiona for the disposal of asbestos-cootaining waste material are contained in the NESHAP under the authority of the CAA and AHERA RCRA regulates the disposal of solid
waste as either a hazardous or
nonhazardous waste. Asbestoe is not listed as a hazardous waste under
Subtitle C of RCRA therefore, it is
regulated as s Subtitle D waste and is subject to the standards contained in 40 CFR Ports 2S7 and 251 Revised Subtitle
D standards were proposed recently (S3 FR 33314. August 30.1968). and changes to 40 CFR Parts 257 end 250 apply to asbestos-containing waste. The waste shipment records being proposed in the
asbestos NESHAP are similar to the manifest requirement* of Subtitle C. whereas Subtitle D contains no recordkeeping requirements. The current
asbestos NESHAP requirement for daily
cover is more specific than are the requirements of Subtitle D. Asbestos is generally thought not to be a threat to
ground-waler quality, although
asbestos-containing waste may contain constituents other then asbestos that may pose e threat to ground-water
quality. For aU of these reasons. EPA has determined that the asbestos NESHAP is the most efficient way for the Agency to regulate the disposal of
ssbestos-conlaining waste material at this time. Other regulations have been promulgated that cover specific problems. The DOT has promulgated
regulations that cover the transportation of asbestos-containing waste material, end EPA has promulgated regulations
specifically governing removal of asbestos from school buildings under
the authority of AHERA
The existing asbestos NESHAP defines responsibilities for asbestos watte disposal and requires either no visible emissions or the use of specific disposal methods for asbestos mills: manufacturing, fabricating, demolition, renovation, and spraying operations:
inactive disposal sites for asbestos mills and manufacturing and fabricating operations: and active disposal sites. As was stated earlier, enforcement experience indicates that approximately 50 percent of asbestos removal operations related to demolition and renovation are parfotmed without EPA
notification. This implies that s significant volume of demolition and renovation waste may be disposed of
out of compliance with the existing NESHAP. Ths actual degree of noncompliance cannot be determined because of a lack of reasonably
available infatuation on the relationship between notifications and / compliance with the waste disposal requirements. Rink* from uncontrolled
sources can be very large; therefore,
amendments to the existing NESHAP are being proposed to aid enforcement and improve compliance. In addition.
920 Federal Register / Vol. 84, No. 6 / Tuesday. January 10. 1969 / Proposed Rules
responsibility for waste management
and disposal i* explicitly denned. Also, the proposed reporting and
recordkeeping requirements arc consistent M*ith EPA guidelines published in Asbestos Waste Management Guidance (EPA/530-SW*5-007. May 1085) for asbestos waste
disposal. A provision is added that requires the
broken edges of nonfriable asbestos material'to be wetted or encapsulated. This change is intended to help clarify
the intent of the regulation as it is now
written. This is aimed principally at many asbestos-cement products that are
normally nonfriable when whole but that may release fibers when broken. If the broken edges are treated so that the
asbestos Tiber* are sealed in. the material does not have to be put into
leak-tight enclosures prior to its disposal in a NESHAP landfill. If the edges are
wetted but not sealed, the material
would have to be placed in leak-tight
enclosures for disposal in a NESHAP landfill.
The handling and disposing of waste
resulting from the demolition of
buildings where the asbestos is encased in concrete is clarified to include similarly hard material. A compliance option is added for the situation where the asbestos was not discovered until
after demolition began. The types of
nonfriable asbestos that needed not be removed before demolition are specified
I 61.145(c)(l)(iii)). A new provision (f 61.155) is added
that allows the Administrator to
approve waste treatment methods that destroy or transform asbestos-
containing waste into nonasbestos
material and specifies the information that the Administrator needs to make euch determinations. Provisions that
apecify testing for the presence of
asbestos in the output material are
added in addition to provisions that
require key process parameters to be
continuously monitored. Prior to disposal process output materials will
be determined to be asbestos-free using
transmission electron microscopy (TEM). or the location of their disposal
recorded. These provisions are needed
in view of requests received by EPA for approval of new aabestos waste
treatment methods. Milling, manufacturing, and
fabricating facilities and demolition and renovation contractors will be required to prepare and maintain records of
waste shipments and submit semiannual
reports to EPA summarizing waste shipment records, la addition, they will be required to furnish a copy of the record of the waste shipment to the owner or operator of the disposal site.
The most likely mechanism will be to
send a copy of the record along with the waste transporters. This requirement
will establish a record of the chain-ofcustody and alert enforcement personnel of potential violations of the waste disposal requirements. In addition, all containers of waste will be
required to be labeled with the waste generator's name and location of the site where the asbestos waste was generated. This requirement will enable enforcement personnel to enforce the requirements for leak-tight containers
where asbestos from multiple job sites are in a single vehicle. It will assist enforcement officials in tracking
asbestos waste shipments and in determining that asbestos waste is being properly disposed of and result in
increased compliance. At present, the waste generator is
responsible for selecting a disposal site that meets the asbestos waste disposal
requirements of the NESHAP. The
proposed amendments also make the disposal site owner or operator
responsible for complying with the
NESHAP provisions for waste disposal sites. Enforcement officials have stated
that the current waste disposal provisions are difficult to enforce
because the responsible party, the generator, does not have sufficient control of the disposal practices used at
the disposal site. This proposed amendment should increase compliance
with the NESHAP provisions at an active disposal site by making each party responsible. Specifically, the waste generator is responsible for
selecting a disposal site that meets the NESHAP requirements, and the waste
site operator is required to comply with the work practice provisions at the
waste disposal site. All waste must be
disposed of at the site specified on the waste shipment record. The generator may haul his own waste, contract with
the disposal site operator for hauling services, or contract with an independent hauler. A requirement also
is added to require the Administrator's
approval before removal or disturbance
of previously deposited asbestos
material at both active and inactive
disposal sites. In making a decision on the request, the Administrator will consider the following; (1) Reason for
moving or removing the waste. (2) procedure* to be used to control emissions, and (9) location of the final disposal site. At a minimum, the
aabestos waste should be handled in a wet condition until final disposal. In addition, waste disposal site operators
will be required to document all asbestos waste shipments that are received, document the arrival of
improperly contained waste, investigate discrepancies between waste shipment records and waste actually received, document the location and quantity of asbestos in a landfill, and record the presence and location of asbestos an.) the asbestos NESHAP regulatory authority over the disposal site on th<
property deed. Waste disposal site operators also will be required to submit semiannual reports to EPA summa-izing activities involving the disposal of asbestos-containing waste Enforcement personnel have noted that asbestos waste that is not properly documented may lead to future exposures if sites arr disturbed. These requirements will aid enforcement in tracking shipments of waste to ensure compliance and help avoid possible recurrence of inadvertent exposure incidents as have been found by EPA by ensuring that future owners and users of land are alerted to the presence of asbestos waste and take
adequate precautions if the waste is disturbed. These requirements arc consistent with EPA's intent to prevent public exposure to asbestos emissions
from waste disposal sites. These requirements are considered reasonable because expected costs are small and some sites already use special precautions when disposing of asbestos waste.
To retain control over disposal sites that have already become inactive, the current provisions of I 61.151 for inactive disposal sites are retained with only a few modifications. A provision is added allowing the use of crushed stone as a final cover in desert areas where a vegetative cover ia difficult to establish and maintain. This amendment offers
greater flexibility without affecting control stringency. The prov isions fot inactive tailing piles are revised to clarify the standard's current intent that dust suppression sgents be used in a manner to maintain dust control.
The provisions that allow the Administrator to approve alternative control methods are modified to give more detailed instructions on requesting
approval of alternative methods. This
change is intended to clarify the regulation by indicating what criteria are used by the Administrator in ruling
on alternative control methods.
Vehicles used to transport waste are required to display placards warning of the presence of asbestos during the loading and unloading of waste. Such a measure will warn persons of the. asbestos hazard and help prevent accidental exposures to asbestos during
loading and unloading. The DOT regulations require placards during
Fodeza) Register / Vol. 54. No. 6 I Tuesday. )anuary 10. 1989 / Proposed Rules
921
transportation of asbestos-cooiainmg wMste.
Table 1 presents the estimated nationwide asbestos emissions from disposal of demolition end renovation wastes for different levels of control, full compliance with the current
NESHAP would result in estimated
emissions of about 400 kgfyr. However, if (as enforcement experience implies) a
significant percentage of demolition and
renovation wastes may be disposed of out of compliance, estimated emissions are actually 227.000 kg/yr. Most of these
emissions, an estimated 226.000 kg/yr.
result from the improper disposal of asbestos waste from demolition and
greatly exceed other asbestos emissions. These revisions sre intended to improve compliance that will reduce asbestos emissions.
Table 1.--Estimated Nationwide asbestos Emissions From Demolition and Renovation.* kg/yr
Lmi of eonfroi
Cumm NESHAP (Ul ewroMnee)____ _
___
________________________
Cw*<x NESHAP tcwmnt paeveer.......................................................... ............. ...................
AabeMM ronovibie
OaffOMion fWtiOrllgfi
I 700; 1.S00
e 1}
Waswdapo**
Owwaon I Wanonaww |
I
seo 224.000
1
s 1.000 |
Tow
1.100 22S.300
* See INeswON M ler ducuaaon of uneenawea* iuocuim eniti eMmaisS wane * Emsson ettmalet unde N ewieei NEShap. aiveing euraat erases, are ancaWn Gmaaon aswnatee are baaed aa PA ntocotw* h>mv aeiinatae e> ma level o crxwpaanca xin ir<a NEShap nonAcanon jramania. laewr ran on Via acsai iava< ol epmpnanea w*\ aw lamovai end earns* 'agiaramantt
In add:tion to the proposed revisions discussed shove, several editorial changes are proposed (but not discussed) that are inlended to clarify the ir.tent of the regulation as well as make il more understandable. The i hinges consist primarily of adding clarifying phrases or substituting terms for clarity and are based on comments from both enforcement agencies and industry.
The costs associated with the proposed amendments are expected to be small. The recordkeeping and reporting costs are included in the impacts of the reporting requirements. The benefits of the amendments cannot be precisely quantified, but the above assessment of the effectiveness of the current NESHAP at full compliance and At current practice gives a measure of the magnitude of the increase in benefits that could be achieved.
Spraying
The current NESHAP prohibits the use of materials that contain greater than 1 percent asbestos on a dry weight basis for spray-oo application on buildings, structures, pipes, and conduits unless the asbestos fibers in the msterials are encapsulated with a bituminous or resinous binder during spraying sod the materials are not friable after drying. This requirement is amended by substituting percent by area for percent by weight as the expression for asbestos concentration as discussed under "Friable asbestos material" in the Definitions section of this preamble.
Roadways
Section 81.143. "Standard tor roadways.*' is clarified by aubatituling "construct or maintain" for "surface." This revision will codify a determination already made by EPA.
The amendment will make it clear that unbound tailings arc not allowed in a road base, based on a prior 'A applicability determination, unless the road is a temporary roadway on an area of asbestos ore deposits, i.e. an asbestos mine. Tailings are permitted in temporary roadways at asbestos mill sites if they are encapsulated with a resinous or bituminous binder. Periodic maintenance of the encapsulated road surface to prevent dust emissions will be required. Asbestos tailings are not permitted to be used in road constroction unless they are encapsulated in asphalt concrete meeting Federal Highway Administration (FHWA) roadway construction (pacifications. Because of their aggregate characteristics which give them some value for use in road construction, tailings encapsulated in asphalt concrete vrii)> continue to be allowed. This change explicitly will
ermit the use of asbestos tailings which ave been encapsulated, and which, because of the milling process, typically have a low asbestos content.
Definitions
"Adequately wetted" is changed to "Adequately wet" because in most placet in the regulation, the verb "wet" is used. The definition clarifies that the owner or operator must wet asbestos to e sufficient degree to prevent any particulate emissions.
To be consistent with other revisions to the standard, the definition of "Asbestos material" was changed to . "Aibestos-containi&g material" and xpandod to badade both friable material and oonfriable material that potentially can baeoaa a source of emissions.
The definition of "Asbestoscontaining waste malarial" ia modified to give additional examples of waate
material that are covered by the
regulation. The part of the definition pertaining to waste from demolition ar.d renovation is modified to clarify that the standard applies to nonfriable material that can be broken, crumbled, pulverized, or reduced to powder by operations covered by the regulation.
The definition of "Commercial asbestos" is modified to darify that it includes any material lhal contains asbestos and has value because of iu asbestos contenL This is consistent with
EPA's previous applicability
determination.
The definition of "Demolition" ia
modified to clarify that the intentional burning of load-supporting structures or the intentional burning of facilities is considered s demolition. This more clearly specifies that buildings that are intentionally burned, usually under the supervision of a fire department, to make way for new structures, for example, would have to comply with the provisions for demolition and
renovation, thus avoiding occasional emissions from a previously unregulHted source. Economic impacts of this amendment would be negligible because
occurrence* are so few.
The definition of "Emergency renovation operation" is modified to
give more explidt criteria for what constitutes an emergency renovation.
The definition of "Fabricating" is clarified by stating that for friction products, bonding and debonding are included.
The definition of "Facility" is modified by adding the terms "residential" "public." "ships." and "active and inactive disposal sites." Adding these terms serve* to clarify the regulation to read aa it ia interpreted currently to Indude residential
922 Federal Register / Vol. M. No. e / Tuesday, January 10. 1989 / Proposed Rules
structures, publicly owned buildings,
ships, end waste disposal sites. The meaning of "Facility component"
is clarified by defining it as any part of a facility, including equipment.
The current definition of "Friable asbestos material" contains a threshold of 1 percent for the amount of asbestos that must be present before friable material is subject to the demolition and
renovation provisions. The intent of the
1 percent threshold was to distinguish between material that contained asbestos and material that did not
contain asbestos within the limits of
detection of the available analytical methods. The current definition also expresses the asbestos threshold as
percent by weight. The proposed standard expresses asbestos content as percent by area to make the regulation consistent with preferred analytical
methodology, which gives results as
percent by area, and with current
practice; it does not change the stringency of the standard.
The mass of asbestos present in a bulk sample cannot be determined directly. In the context of bulk sample analysis, mass is a derived property
because it is obtained by counting and
sizing asbestos particles under a microscope, assuming a geometric shape for the particles, calculating their volume, and multiplying by an assumed
density. The mass of nonasbestos
material present in a bulk sample would be obtained by the same procedure.
On the other hand, the area and type
of asbestos present in a bulk sample can be determined directly through microscopic analysis. Appendix A. Subpart F. 40 CFR Part 763. contains the
approved method of bulk sample
analysis for asbestos--polarized light microscopy (PLM) and point counting and is incorporated by reference in the
definition. In this method, the area of an analytical slide occupied by asbestos
particles and the area occupied by matrix are both measured directly. The Agency is considering incorporation of
this method explicitly in the final rule if it would be more convenient to use.
Therefore. EPA is requesting comments on whether the method should be
incorporated by reference as it is in this
proposal, or whether the method should
be stated explicitly in the rule. The relationship between percent
weight and percent area has been studied by EPA (Draft Relationship Between Visual Estimates and Weight
Percentage ofACM), litis study discusses ways to convert percent area
measurements to percent weight equivalents, generally concluding that percent weight and percent area are
equivalent for most matrices in which
asbestos is found. Furthermore, using percent area will serve the same purpose at was intended initially, i.e.. whether asbestos is present or not.
The cost and availability of methods for the identification and quantitation of asbestos vary greatly depending on the particular method. The TEM. for example, is relatively expensive with costs ranging from about 1500 to $700
er sample analyzed. PLM costs, owever. average about $25 to $50 per sample. Numerous laboratories are capable of performing PLM. while the number of laboratories with TEM capabilities for asbestos analysis are somewhat more limited. An informal survey by EPA's Office of Research and Development (ORD) of analysts performing asbestos bulk sample analyses reveals that in practice they determine and report percent asbestos by area, not be weight. This is
considered to be the norm rather than an exception.
The EPA also considered, but rejected, a revision to the definition of "Friable asbestos material" to include materials that can be crumbled, pulverized, or reduced to powder by the mechanical forces expected to act on the material. The intent of such a change would be to codify an interpretation already made by EPA. The interpretation states that, in effect, the demolition and renovation regulations apply to materials that are normally nonfriable (e g., asbestos-cement sheet), which because of forces acting on the material during demolition or renovation and subsequent handling, transportation, storage or disposal operations, would result in asbestos emissions. However, as a result of numerous comments from government and industry stating that the existing definition of friable was well established and widely accepted. EPA has decided to retain the existing definition with the exception that "broken" is inserted ahead of
"crumbled, pulverized, or reduced to powder." This is consistent with EPA's current interpretation and application of this definition. Throughout the
regulation where the phrase "crumbled, pulverized, or reduced to powder" is used, the word "broken" has been added.
The atandard will be reviaed where
appropriate to regulate materials that are normally nonfriable but potentially can be broken, crumbled, pulverized, or educed to powder as a result of the
regulated operations. Such materials Include, for example. A/C products and
per insulation. These materials must removed from a facility prior to its demolition because they are likely to be
broken up during demolition and inaccessible after demolition for segregation and separate disposal in a
NESHAP landfill. To the extent that these materials can be removed without breaking or crumbling, they do not have to be wetted and sealed in leak-tight containers, although they are to be included in determining applicability and their quantity must be included in
the notification, in addition, they must
be disposed of in a NESHAP landfill. Nonfriable materials thst are likely to remain nonfriable and. therefore, not be subject to the demolition and renovation provisions, include packings and gaskets, floor tile, asphalt roofing shingles, roofing felt, coatings, and
sealants. However, even these nonfriable materials may be subject to regulation under certain situations. For
example, the sanding of asbestos floor tiles that can produce asbestos emissions is considered a renovation
and subject to the regulation. Severely weathered asphaltic materials may become brittle and. therefore, be subject to the regulation. Because handling even normally nonfriable materials can result in asbestos emissions under some conditions, case-by-case determinations of friability will still be required in many instances.
A definition of "Fugitive sources" is
added to help clarify (he modified provisions for mills, manufacturing, and
fabricating.
A definition of "Glove bag" is added because the use of glove bags will be permitted in renovations when wetting is determined not to be feasible for safety reasons or because of the potential to damage equipment. However. EPA intends for glove bags to
be used with wetting inside the glove
bags. The definition of "Inactive waste
disposal site" in revised by deleting reference to vehicular traffic and stipulating that an inactive site is one at which asbestos-containing waste material has not been deposited within
the past year. "Installation" is defined as a building
or group of buildings at a demolition or renovation site. This definition is added
to clarify the existing applicability requirements for demolition or renovation. For purposes of determining the amount of asbestos to be stripped or
removed, the amounts of asbestos in a group of buildings to be demolished or
renovated are summed. "Leak-tight" la defined to help clarify
the intent of the demolition and renovation and waste disposal requirements as they pertain to the use of leak-tight containers, wrappings, and
Federal Register / Vol. 84. No. B / Tuesday. January iq 1989 / Propoaed Rulea
923
(in the case of demolition and renovation) the use of leak-tight chutes
to convey waste from aboveground stripping and removal operations. Leaktight implies that, in the course of operations covered by this regulation, the contents are sealed adequately to prevent any asbestos or asbestoscontaining material, including contaminated water, from escaping. Although it is impractical to identify in advance What is considered leak-tight, the use of certain containers or seals may be considered unacceptable in many instances. For example, the use of
flimsy twist ties or bags of less than 6mil thickness would not constitute `'leak-tight" under most conditions. A case-by-case determination will be
required in many instances. A definition of "Malfunction" is added
to clarify conditions covered by the requirements for air pollution control devices in milling, manufacturing, and fabricating.
The definition of "Manufacturing" is
revised to clarify that chlorine manufacturing is covered by the definition. Chlorine manufacturers use asbestos in the production of chlorine rather than processing asbestos into a final or intermediate product.
"Natural barrier" is defined to help clarify the intent of the waste disposal
requirements and. specifically, that remoteness of a disposal site alone does not constitute a natural barrier.
A definition of "Nonscheduled operation" is added to help clarify the
intent of the applicability provisions for renovation.
The definition of "Outside air" is `clarified by specifying that outside air means air outside buildings and structures and includes air under bridges and open air ferry docks.
"Owner or operator of a demolition or
renovation activity" is defined to help clarify responsibility for compliance. The definition of "owner or operator of a demolition or renovation activity" includes the owner of the facility being demolished or renovated. It also includes the current owner of the property on which the facility is situated, if the owner sells the facility to another party for demolition or renovation. In such circumstances, the
property owner, while no longer holding title to the facility, causes the demolition
or renovation to occur, and thereby owns, leases, operates, controls, or supervises the demolition or renovation
operation. See. e.g.. US. v. Ceppert-
Bn*.. Inc. et oL 630 F. Sopp. 996
(F.D.Pa. 1966). The definition of "Planned renovation
operations" is revised to require knowledge that "some" friable aslieslos
material will be stripped or removed rather than knowledge of "the amount of material to be stripped or removed.
"Remove" is clarified to include the taking out of "asbestos-covered facility components."
"Renovation" is clarified by specifying stripping and removal of asbestos as renovation activities. An additional change makes clear that wrecking or taking out load-supporting structural members is demolition.
The definition of "Roadways" is clarified by adding the term "public and private" so that it is clear that the
regulation is applicable to roadways regardless of ownership.
The definition of "Strip" is clarified by adding "or facility components" at tbs
end of the definition. In order to facilitate enforcement of
the visible emission limitations, the definition of "Visible emissions" is
revised to mean any emissions coming from asbestos-containing material.
"Working days" is denned as Monday through Friday to help clarify the notification requirements for demolition and renovation.
Impacts of Reporting Requirements
The proposed amendments to the asbestos NESHAP will impose several reporting and recordkeeping
requirements. Owners or operators of milling, manufacturing, and fabricating sources will be required to maintain records of monitoring and inspections and of waste shipments and will be required to submit quarterly reports of visible emission monitoring. Each owner or operator involved in a demolition or renovation operation will be required to maintain records of waste shipments. All generators of waste will also be required to submit semiannual reports summarizing their records of waste shipments. Owners or operators of active waste disposal sites will be required to maintain records of all asbestos waste shipments, document the arrival of improperly contained waste,
maintain records of the location and quantity of asbestos in the landfill, make semiannual reports to the Administrator summarizing disposal activities, and record on the property deed the
presence and location of asbestos. As is discussed in the rationale for the selection of the proposed amendments,
the recordkeeping and reporting requirements will assist enforcement efforts.
The information collection provisions summarized above have been submitted for approval to the Office of Management and Budget (OMB) under the Paperwork Reduction Ad of 1960.44 U.S.C. 3501 el teq. Comments on these
requirements should be submitted to the Office of Information and Regulatory Affairs. OMB. 726 Jackson Place. NW,, Washington. DC 20503. marked "Attention: Desk Officer for EPA," as well as to EPA. The Final rule w'.ll respond lo any OMB or public comments on the information collection requirements.
An analysis of the burden associated with the proposed reporting and recordkeeping requirements has been made. During the first 3 years of this regulation, the annual burden of the reporting and recordkeeping requirements for asbestos mills: ' manufacturing, demolition, renovation, spraying, and fabricating operations: and adive and inactive waste disposal sites is estimated to be about 306.000 person-hours.
Regulatory Flexibility Ad -
The RFA (5 U.S.C. 601 el seq.) requires EPA to consider the potential impacts of proposed standards on small "entities." if a preliminary analysis indicates that a proposed regulation would have a significant adverse economic impact on a substantial number (i.e~ 20 percent or more) of small entities, then a regulatory flexibility analysis must be prepared. Current RFA guidelines indicate that an economic impad should be considered signiFicantly adverse if it meets one of the following criteria: (t) Annual compliance costs increase production costs by more than 5 percent: (2) compliance costs as a percentage of sales for small entities are at least 10 percent more than compliance costs as a percentage of sales for large entities: (3) capital costs of compliance represent a "significant" portion of capital available to small entities, considering internal cosh flow plus external Financial capabilities: and (4) regulatory requirements are likely to result in closures of small entities. Effect* of the proposed standard on small firms in the milling, manufacturing, and fabricating industry cannot be estimated because of luck of data on the existing distribution of plant sizes and on plant ownership by size of firm. It is likely that differences in unit compliance costs between large and small entities (higher unit costs for smaller Firms) are not large enough to create significant interplant cost differences. In the demolition services industry, the increases in demolition, costs and the nature of the industry., itself are such that no signiFicantly ,, disproportionate impacts will be experienced by smaller entities. In the renovation services industry, the effects on smaller firms are likely to be quite small because cost increases are slight.
924 Federal Register* f Vol. M. No. 6- J Tuesday. ]snuary IQ. 1989 f Proposed Rules
Thu*, a regulatory flexibility analysis I* not required.
Public Hearing
A public hearing will be held, if requested, to discuss the proposed amendments to the asbestos NESHAP. in accordance with sections 112(h)(1)(B) and 907(d)(5) of the CAA and the Administrative Procedure Act. Persons wishing to male oral presentations should contact EPA at the address given in the Addresses section of this
Jireamble. Oral presentations will be
imited to IS minute* each. Any member of the public may file a written statement before, during, or within 30 days after the hearing. Written statements should be addressed to the Central Docket Section address given in the Addresses section of this preamble and should refer to Docket No. A-46-28.
A verbatim transcript of the bearing and written statements will be available for public inspection and copying during normal working hour* at EPA's Central Docket Section in Washington. DC (see Addresses section of this preamble).
Docket
The docket it an organized and complete file of all the information aubmitted to or otherwise considered by EPA in the development of the proposed amendments. The principal purposes of the docket are: (1) To allow interested parties to identify and locate documents so that they can participate effectively in the rulemaking process and (2) to serve as the record in case of judicial review (except for interagency review materials (Section 307(d)(7)(A)).
Miscellaneous
When the amended asbestos NESHAP is reviewed again, the review will Include an assessment of such factor* as the need for integration with other programs, the existence of alternative methods, enforceability, improvements in emission control technology and health data, and reporting requirements. The reporting requirements in this standard will be reviewed as required voder the EPA sunset policy for reporting requirements in regulations.
In accordance with aection 117 of the CAA. publication of this proposal was preceded by consultation with appropriate adviaory committees, independent experts, and Federal departments and agencies. In addition, numerous meetings were held with industry representatives and trade associations during development of the proposed amendments. The Administrator will welcome comments within the public comment period, on all aspects of the proposed regulation.
including economic and technological isaues. and on the proposed test method.
Comments are specifically invited on the following aspect* of the proposed amendments:
Expressing asbestos content of materiat* at percent by area:
Requiring weekly inspections of air cleaning devices at mills, and manufacturing and fabricating operations, and keeping records of same:
Requiring notification of demolitions where no asbestos is involved:
Training of asbestos removal contractors:
Comments by NADC to improve compliance.
Under Executive Order 12291. EPA must judge whether a regulation it `'major'* and therefore aubject to the requirement of a Regulatory Impact Analysis. This regulation is not major because it would result In none of the adverse economic impacts set forth in section 1 of the Executive Order as grounds for finding a regulation to be major. The Industry-wide annualized costs in the fifth year after the standards would go into effect would bo approximately S9.3 million, less than the $100 million established a* the fuel criterion for a major regulation in the Order. The estimated price increases on asbestos products would not be considered "major Increases in costs or prices" specified as the second criterion in the Order. The analysis of the proposed amendments' effect on the asbestos industry did not indicate any significant adverse effects on competition, investment, productivity, employment, innovation, or the ability of U.S. firms to compete with foreign firms (the third criterion of the Order).
This regulation was submitted to OMB for review as required by Executive Order 12291. Any written comments from OMB to EPA snd any EPA responses to those comments will be included in Docket No. A-66--2& This docket is available for public inspection at EPA's Central Docket Section, which Is listed under the Addresses section of this preamble.
Pursuant to the provisions of 5 UkC 605(b). 1 hereby certify that this rule, if promulgated, will not have a significant. economic impact on a substantial: number of small entities.
List of Subjects in 40 CFR Parts 01 and 703
Asbestos. Beryllium, Hazardous substances. Mercury. Reporting and recordkeeping requirements. Vinyl chloride. Blast furnaces. Steel mills.
Ditt. Decemlwr 22. ISAM.
La* M. Thomas. Administrator.
It is proposed that 40 CFR Chapter 1 be amended as follows:
PART 01--{AMENDED]
I. In Part 01: 1. The authority citation for 40 CFR Part 01. Subpart M is revised to read as follows:
Authority: Secs. 101.112.114.116.301 ot the Clean Air Act as amended (42 U.S C. 7401.7412. 7414.7416.7601). Sec 203 of the Toxic Substanees Control Act. IS Ui.C. 26U.
2. The table of sections is revised in its entirety to resd as follow s:
Subpart M -National Emlasion Standard for Asbestos
tire. 61.140 Applicability.
1.141 Definitions. 1.142 Standard for sibettu* mills 1.143 Standard for roadways. 41.144 Standard for manufacturing 1.145 Standard for demolition end
renovation. 1.146 Standard for spraying 1.147 Standard for fabricating 1.146 Standard for insulating materials 61.148 Standard for waste disposal for
atbealoe mills. 61.150 Standard for waste disposal for
manufacturing, fabricating, demolition, renovation, and spraying operations 61.151 Standard for inactive waste disposal sites for asbestos mills and manufacturing and fabricating operation* 1.152 Air cleaning 1.153 Reporting. 1.154 Standard for active waste ditpoval aitea. 1.155 Standard for atlas that com ert esbftstof-cnnuining waste materia! into nonasbeetoe (asbestos-free| materia' 1.156 Cross reference to other asbeio regulations. 1.157 Delegation of authority.
Figure* to Subpart M
3. Section 61.140 is revised to rvaJ as follows:
| <1.140 Applicability.
The provisions of this subparl anapplicable to those sources specified :n II 91.142 through 01.151.61.154. and 61.155.
4. In 161.141. the following definitions re revised: "Asbestos-containing waste materitls." "Commercial asbestos." DtsmoliliofC "Emergency renovation operation." "Fabricating." "Fei.ilit.v." "Facility component." "Friable asbestos material." "Inactive waste disposal site." "Manufacturing." "Natural barrier." "Outside sir." "Particulate asbestos material.'' "Planned renovation
Federal Rector / Vol. 54, No. 8 / Tuesday. January 10. 1969 / Proposed Rule*
>25
operation." "Remove." "Renovation." "Roadways." "Strip." and "Viaible emissions." The following definitions are added: "Adequately wet," "Asbestos-containing material." "EPA identification number." "Fugitive sources." "Clove bag." "Installation." "Leak-tight," "Malfunction." "Natural barrier." "Nonscheduled renovation operation," "Owner or operator." "Waste generator." "Waste shipment record," "Working days." The definitions. "Adequately wetted" and "Asbestos materiaL" are removed.
1*1.141 Definitions.
All terms that are used in this subpart and are not defined below ere given the same meening es in the Act end in
S ubpart Aof this part.
"Adequately wet" means sufficiently mix or penetrate with liquid to prevent the release of particulates. If visible emissions are observed coming from asbestos-containing materiaL then that material has not been adequately wetted. However, the absence of visible emissions is not sufficient evidence of being adequately wet. e
"Asbestos-containing material" means friable asbestos material, and nonfriablc asbestos material that potentially can be broken, crumbled, pulverized, or reduced to powder in the course of operations regulated by this subpart.
"Asbestos-containing waste materials" means any waste that contains commercial asbestos and is genersled by a source subject to the provisions of this subpart This term includes asbestos mill tailings, asbestos waste including fillers from control devices, friable asbestos waste material. nd bags or containers that previously contained commercial asbestos. As applied to demolition and renovation operations, this term also includes nonfriable asbestos waste that can be broken, crumbled, pulverized, or reduced to powder in the course of demolition and renovation operations covered by this subpart and materials contaminated with esbestos including
e quipment an' d clothing.
"Commercial asbestos" means any material containing asbestos that is extracted from ore and baa value liecause of its asbestos contenL
"Demolition" means the wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations or the intentional burning of any facility.
"Emergency renovation operation" means a renovation operation that was not planned but results from a sudden, unexpected event that results In unsafe
conditions. This term Includes operations necessitated by nonroutine failures of equipment
"EPA identification number" means the number assigned by EPA to each
waste generator. "Fabricating" meana any processing
of a manufactured product that contains commercial asbestos, with the exception
of processing, or field fabricating, at temporary sites for the construction or restoration of facilities. In the case of
friction products, fabricating includes
bonding and debonding. "Facility" means any institutional
commercial, public, industrial, or residential structure, installation, or
building (residential buildings having four or fewer dwelling units are excluded); any ship; and any active and inactive waste disposal site.
"Facility component" means any part of a facility including equipment
"Friable asbestos material" means any material containing more than 1
ercent asbestos by area as determined
y the method specified in Appendix A.
Subpart F. 40 CFR Part 703 that, when dry. can be broken, crumbled,
ulverized. or reduced to powder by
and pressure. "Fugitive sources" means any source
not controlled by an air pollution control device.
"Glove bag" means a sealed compartment with attached inner gloves
used for the handling of asbestos-
containing materials. Properly installed and used, glove bags provide a small work area enclosure typically used for
small-scale asbestos stripping
operations. Information on glove-bag installation, equipment and supplies,
and work practices is contained in the Occupational Safety and Health
Administration's (OSHA) final rule on occupational exposure to asbestos
(Appendix C to 29 CFR 192S.S8). "Inactive waste disposal aite" means
any disposal site or portion of it where
additional asbestos-containing waste material has not been deposited within
the past year. "Installation" means any building or
structure or any group of buildings or
structures at a single demolition or ..
renovation site that are under the control of a single entity (l.e* one owner
or one operator). "Leak-tight" means that solids or
liquids cannot escape or spill out It also means dust-tight.
"Malfunction" means any sudden and unavoidable failure of air pollution control equipment or process equipment
or of a process to operate in a normal or
usual manner ao that emissions of '*
asbestos are increased. Failures of
equipment shall not be considered
malfunctions if they are caused in any
way by poor maintenance, careless - -
operations, or any other preventable
equipment breakdown.
^
"Manufacturing" means the
combining of commercial asbestos--or.,
in the case of woven friction products. . , .
the combining of textiles containing .
commercial asbestos--with any other
material(s). including commercial
asbestos, and the processing of this . '
combination into a product Chlorine i ,.
production is considered a pari of
manufacturing.
"Natural barrier" means a natural ...
object that effectively precludes or -
deters access. Natural barriers include .
physical obstacles such as cliffs, lakes ..
or other large bodies of water, deep and
wide ravines, and mountains.
Remoteness by itself is not a natural
barrier.
"Nonscheduled renovation operation"
means a renovation operation that is not
planned but is caused by the routine
failure of equipment.
"Owner or operator of a demolition or
renovation activity" means any person
who owns, leases, operates, controls, or
supervises the facility being demolished
or renovated or any person who owns,
leases, operates, controls, or supervises
the demolition or renovation operation,
or both.
"Outside air" means the air outside
buildings and structures, including, but
not limited to. the air under a bridge or
in an open air ferry dock.
"Particulate asbestos material" means
finely divided particles of asbestos or
material containing asbestos.
"Planned renovation operations"
means a renovation operation, or a
number of eucb operations, in which
some friable asbestos materisl will be
removed or atripped within a given
period of time and which can be
predicted. Individual nonscheduled
operations are included if a number of
euch operations can be predicted to
occur during a given period of time
based on operating experience.
"Remove" means to take out asbestos-
containing materials or asbestos-
covered facility coanponents from any
facility.
"Renovatioa" aaoens altering in any *' 1
way one or more facility components '
including the stripping or removal of'' "5";
asbestos-containing material from - '
facility components. Operations in:
which loed-eupporting structural
members are wrecked or taken out are **
demolition*.
26 Federal Register / Vol. 54, No. 6 / Tuesday. January 10. 1989 / Proposed Rules
"Roadways" moans surfaces on which motor vehicles travel. This term includes public and private highways, roads, streets, parking areas, and driveways.
"Strip" means to take off asbestoscontaining materials from any part of a facility or facility components.
a
"Visible emissions" means an> emissions, which are visually detectable without the aid of instruments, coming from asbestos-containing material. This does not include condensed uncombined water vapor.
"Waste generator" means any owner or operator of a source covered by this subparl whose act or process produces asbestos-containing waste material.
"Waste shipment record" means the shipping document, originated and
signed by the generator, used to substantiate the disposition of asbestoscontaining waste material.
"Working days" means Monday through Friday and includes holidays that fall on any of the days Monday through Friday.
5. Section 61.142 is revised to read as follows:
(61.142 Standard for asbestos rnltia.
(a) Each owner or operator of an asbestos mill shall either discharge no visible emissions to the outside air from that asbestos mill, including fugitive sources, or use the methods specified by I 61.152 to clean emissions containing particulate asbestos material before they escape to. or are vented to. the outside air.
(b) Each owner or operator of an asbestos mill shall meet the following requirements:
(1) Monitor each potential source of asbestos emissions from any part of the mill facility, including air cleaning devices, process equipment, and buildings that house equipment for material processing and handling, at least once each day. during daylight hours, for visible emissions to the outside air during operation. The monitoring period shall be of at least IS seconds duration per source of emissions.
(2) Inspect each air cleaning device at least once each week for proper operation and for changes that aignal the potential for malfunction including, to the maximum extent possible without dismantling other than opening the device, the presence of tears, holes, end abrasions In filter bags and for dust deposits on the clean side of begs. For air cleaning devices that cannot be inspected on a weekly basis according to this paragraph, submit to the Administrator and revise as necessary. '
a written maintenance plan to Include at a minimum, the following:
(i) Maintenance schedule. (ii) Recordkeeping plan.
(3) Maintain records of the results of visible emissions monitoring and control device inspections using a format similar to that shown in Figures 1 and 2 and include the following:
(i) Date and time of inspection.
(ii) Presence or absence of visible emissions.
(iii) Condition of bags, including presence of tears, holes, and abrasions.
(iv) Presence of dust deposits on clean side of bags.
(v) Brief description of corrective actions taken including date and time.
(vi) Daily hours of operation for each control device.
(4) Furnish upon request, and make available during normal business hours for inspection by the Administrator, all records required under this section.
(5) Retain a copy of all monitoring and inspection records for at least 2 years.
(6) Submit quarterly a copy of the visible emission monitoring records to the Administrator if visible emissions occurred during the report period. Quarterly reports shall be postmarked by the 30th day following the end of the calendar quarter.
6. Section 61.143 is revised to read as follows:
(61.143 Standard for roadways.
No person may construct or maintain a roadway with asbestos tailings or asbestos-containing waste material on that roadway, unless, for asbestos tailings.
(a) It is a temporary roadway on an area of asbestos ore deposits (asbestos mine): or
(b) It is a temporary roadway at an asbestos mill site ana is encapsulated with a resinous or bituminous hinder. The encapsulated road surface must be maintained at a minimum frequency of once per year to prevent dust emissions; or
(c) Ii is encapsulated in asphalt concrete meeting the specifications contained in Section 601 of Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. FP-65.1665. or their equivalent
7. In 161.166.' paragraph (a)(0) and paragraphs (b) (1) and (2) are revised and paragraphs (b)(3) through (b)(6) are added to read as follows:
(61.166 Standard lor manufacturing. -
()**
(0) The manufacture of chlorine; utilizing the asbestos diaphragm ; technology.
0 oa
(b)* * *
(1) Discharge no visible emissions to
the outside air from these operations oi
from any building or structure in which
they are conducted or from any other
fugitive sources: or
(2) Use the methods specified by
1 61.152 to clean emissions from these '
operations containing particulate''
asbestos material before they escape to.
or are vented to. the outside airi ~
(3) Monitor each potential source of
asbestos emissions from any part of the
manufacturing facility including sir - -
cleaning devices, process equipment. ''
and buildings housing material
processing and handling equipment, at; -
least once each day during daylight
hours, for visible emissions to the -
outside air during operation. The
monitoring period shall be of at least 15
seconds duration per source of -
'
emissions.
(4) Inspect each air cleaning device at
least once each week for proper ; 5
operation and for changes that signal
the potential for malfunctions including,
to the maximum extent possible without
dismantling other than opening the
device, the presence of tears, holes, and
abrasions in Filter bags and for dust
deposits on the clean side of bags. For
air cleaning devices that cannot be
inspected on a weekly basis according
to this paragraph, submit to the
Administrator, and revise as necessary.,
a written maintenance plan to include,
at a minimum, the following:
(i) Maintenance schedule.
(ii) Recordkeeping plan.
(5) Maintain records of the results of
visible emission monitoring and air
cleaning device inspections using a
format similar to that shown in Figures 1
and 2 and include the following:
(i) Date and time of inspection.
(ii) Presence or absence of visible ,
emissions.
(iii) Condition of bags, including
presence of tears, holes, and abrasions.
(iv) Presence of dust deposits on clean
side of bags.
(v) Brief description of corrective
actions taken including date and time/
(vi) Daily hours of operation for each
control device.
'.
(6) Furnish upon request, and make ( *
available during normal business hours.,
for inspection by the Administrator.'all. ,
records required under this section*,'
(7) Retain a copy of all monitoring and
Inspection records for at least 2 years. .
(6) Submit quarterly a cop) of the
visible emission monitoring records to
Fodoral RogUtor / VoL 54, No. 6 / Tuesday. January*10.1989 / Proposed Rules
927
the Administrator if visible emissions occurred during the report period. Quarterly reports shell be postmarked by the 30th day following the end of the calendar quarter.
ff 61.146 and 61.147 (Ramovvd)
0. Sections ei.146 and 01.147 are removed, and i 61.145 is revised to read as follows:
If SI.145 ttandard for demotWon end renovation.
(a) Applicability. The requirements of paragraphs (b) and (c) of this section apply to each owner or operator of a demolition or renovation activity including the removal of asbestoscontaining material as follows:
(1| if the amount of asbestoscontsining material in a facility being demolished is at least 60 linear meters (-60 linear feet) on pipes or at least 1$ square meters (160 square feet) on other_ facility components or a total of at least one cubic meter (35 cubic feet) on or off all facility components in a facility being demolished, all the requirements of paragraphs (b) and (c) of this section apply, except as provided in peragraph (a) (3) of this section.
(3) If in a facility being demolished, the amount of asbestos-containing material is less than 80 linear meters (260 linear feet) on pipes and less than 15 square meters (160 square feet) on other facility components and if the total amount present in or off all facility components in a facility being demolished is less than one cubic meter (35 cubic feet) or there is no asbestos, only the notification requirements of paragraphs (b) (1). (2). (3) (i) and (iv). and (4) (i) through (vi) and (4) (viii) and (xv) of this section apply.
(3) If the facility is being demolished . under an order of a State or local government agency. Issued because the facility irstructurally unsound and in danger of imminent collapse, only the requirements of paragraphs (b)(1). (b)(2). (bj(3)(iii). (b)(4) (except (b)(4)(vii)). (b) (5). and (c) (4). (5). (6). (7). (8). and (8) of this section apply.
(4) If at least 60 linear meters (280 linear feet) of asbestos-containing materials on pipes or at least 15 square meters (160 square feel) of asbestoscontaining materials on other facility components or a total of at least one cubic meter (35 cubic feet) on or off all facility components are stripped, removed, or otherwise distuned from a . facility being renovated including any., individual nonscheduled renovation operation, all the requirements of paragraphs (b) and (c) of this section apply-
(i) To determine whether paragrsph
(e)(4) of this section applies to planned renovation operations involving
individual nonscheduled operations. , predict the additive amount of asbestoscontaining materials to be removed or stripped from one or more facilities during a calendar year of January t through December 31.
(ii) To determine whether paragraph
(a)(4) of this section applies to emergency renovation operations, estimate the amount of asbestos-
containing materials to be removed or
stripped ss a result of the sudden, unexpected event that necessitated the
renovation. (5) For the purpose of determining
applicability, do not include materials
that cannot become friable, such as
packings, gaskets, asphalt roofing, and
vinyl floor tile that are in good ,
condition. Owners or operators of . demolition and renovation operations
ere exempt from the requirements of 1161.05(a). 61.07. and 61.09.
(b) Notification requirements. Each owner or operator of a demolition or
renovation activity to which this section
applies shall: (1) Provide the Administrator with
written notice of intention to demolish or renovate. Update notice, as necessary, including when the amount
of asbestos affected changes. (2) Send the notice by certified mail,
return receipt requested, or hand deliver
the written notice. (3) Postmark or deliver the notice as
follows: (i) At least 10 working days before
asbestos stripping or removal work or
other activities such as site preparation which would disturb any asbestos material in a demolition or renovation
begin, if the operation is described in
paragraphs (a) (1) and (4) (except (e)(4)(i) and (a)(4)(H)). of this section. If
the operation is described in paragraph
(a)(2) of this section, notification is
required 10 working days before
demolition begins. (ii) For renovations described in
paragraph (a)(4)(i) of this section, send
by certified mail. return receipt requested and postmarked or hand
deliver notice 10 working days before
the end of the calendar year preceding the year for which notice is being given..
(iii) As early as possible before, out not later than the following working day after esbesto stripping or removal work
In a renovation begins. If the operation
is described in paragraph (a)(4)(H) of this section or as early as possible ' before or by the following working day
if the operation is a demolition described in paragraph (a)(3) of this section.
(iv) If asbestos stripping or removal work in demolition or renovation operations, described in paregrapha (a)(1) and (4) (except (a)(4)(i) and (*)(4)(ii)) of this section, will begin on s date other than the one contained in the notice, written notice of the new start date must be sent by certified mail,
return receipt requested and postmarked at least 5 working days or received at least 3 working days before asbestos stripping or removal work in a demolition or renovation begins and
postmarked at least 5 working days or received at least 3 working days before the original start date. For demolitions
covered by paragraph (a)(2) of this section, written notice of the new start date must be sent by certified mail, return receipt requested and postmarked at least 5 working days or received at u
less! 3 working days prior to commencement of demolition. In no event shall an operation covered by this' provision begin on a date other than the j date contained in the written notice of the new start date.
(4) Include the following in the notice:
(i) Name, address, and telephone
number of owner and operator. (ii) Type of operation: Demolition or
renovation.
(iii) Description of the facility including the size (square meters) (square feet) and number of floors), age. and present or prior use of the facility.
(iv) Procedure employed to detect the
presence of asbestos-containing materials.
(v) Estimate of the approximate amount of asbestos-containing material,
including nonfriable asbestos material that will not be broken, crumbled, pulverized, or reduce to powder in the
course of operations regulated by this
section, to be removed from the facility in terms of length of pipe in linear meters (linear feet), surface aree in
square meters (square feet) on other facility components, and volume on both
in cubic meters (cubic feet). Provide separate estimates of the amounts of friable asbestos-containing material: the
amount of nonfriable asbestoscontaining material that has the potential to be broken, crumbled, pulverized, or reduced to powder and the amount of nonfriable asbestoscontaining material that will not be
broken, crumbled, pulverized, or reduced to powder in the course of operations regulated by this section.
(vi) Location and address of the facility being demolished or renovated.
(vii) Scheduled starting and completion dates of asbestos removal work in a demolition or renovation; planned renovation operations involving
828 '
Federal Register / Vo!. S4. No. ft,/ Tuesday, January 10. 1889 / Propoaed Rules
individual nonacheduled operationa ahall only include the beginning and ending date* of the report period a* described in paragraph (a)(4)(i) of thie
aeclion. (vili) Scheduled alerting and
completion datea of demolition or renovation.
(ix) Deacription of planned demolition or renovation work to be performed and
method(s) to be employed including demolition or renovation techniquea to be uaed and deacription of affected facility components.'
(x) Deacription of work practicea and engineering controls to be uaed to comply with the requirementa of this
subpart including asbestos removal and
waste handling emission control procedures and the procedures to prevent nonfirable material from being
broken, crumbled, pulverized, or reduced to powder in course of operationa regulated by this section.
(xi) Name and location of the waste disposal site where the asbestos containing waste material, including nonfriable asbestos that has the potential to be broken, crumbled, pulverized, or reduced to powder in the
course of operations regulated by this aection will be deposited.
(xii) A certification that only an owner or operator of a demolition or renovation activity trained as required
by paragraph (c)(8) of this section will supervise in the stripping and removal described by this notification.
(xiii) For facilities described in
paragraph (a)(3) of this aection. the name, title, and authority of the State or local government representative who has ordered the demolition, the date that the order was issued, and the date on which the demolition was ordered to begin.
(xiv) For emergency renovations described in paragraph (a)(4)(ii) of this aection. the date and hour that the emergency occurred, a deacription of the sudden unexpected event, and an
explanation of how the event has caused unsafe conditions.
(xv) Description of procedures to be
followed in the event that unexpected
asbestos is found or previously Mnfriable asbestos material becomes broken, crumbled, pulverized, or
reduced to powder.
(ft) The information required in paragraph (b)(4) of this section must be reported using a form similar to that shown in Figure 3.
(c) Procedures for asbestos emission control Each owner or operator of a demolition or renovation activity to whom this section applies shall comply with the following procedures:
(1) Remove asbestos-containing
operated in accordance with the
materials from a facility being
requirements of I 61.152.
demolished or renovated before any
'(2) A glove-bsg system designed and
activities that would disturb the
operated to capture the particulate
materials or preclude access to the
asbestos msterial produced by the
materials for subsequent removal.
atripping of the asbestos materials.
However, asbestos-containing materials
(3) Leak-light wrapping to contain all
need not be removed before demolition asbestos-containing material prior to
if: dismantlement.
(1) They are on a facility component
(ii) In renovation operations where
that is encased in concrete or other
wetting or the methods allowed in
similarly hard material and are
paragraph (c)(3)(i) of this section cannot
adequately wetted whenever exposed
be used, other methods may be used
during demolition: or
after obtaining written approval from
(ii) They were not accessible for
the Administrator upon determination
testing and were not discovered until
that they are equivalent to wetting or
after demolition began and. as a result, the methods allowed in paragraph
cannot be safely removed. If not
(c)(3)(i) of this section.
removed for safety reasons, the exposed (iii) A copy of the Administiator's
asbestos-containing material and any
written approval shall be kept at the
asbestos-contaminated debris must be worksite and available for inspection
adequately wetted.
(4) After a facility component covered
(iii) They are materials that cannot
or coated with asbestos-containing
become friable during demolition or
material has been taken out of the
renovation, such as. packing, gaskets,
facility as units or in sections, it must be
asphalt roofing, and vinyl floor tile in
stripped or contained in leak-tight
good condition.
wrapping for disposal, except as
(2) When a facility component that
described in paragraph (c)(5) of this
contains asbestos or that is covered or section. If stripped, either:
coated with asbestos-containing
(i) Adequately wet asbestos-
materials is being taken out of the
containing materials during stripping, or
facility as units or in sections:
(ii) Use a local exhaust ventilation
(i) Adequately wet any asbestos-
and collection system designed and
containing materials exposed during
operated to capture the particulate
cutting or disjoining operations: and
asbestos material produced by the
(ii) Carefully lower the units or
stripping. The system must exhibit no
sections to ground level not dropping,
visible emissions to the outside air or be
throwing, sliding or otherwise damaging designed and operated in accordance
them.
with the requirements in ( 61.152
(3) When asbestos-containing
(5) For large facility components such
material is stripped from facility
as reactor vessels, large tanks, and
components in a facility, adequately wet steam generators, but not beams, the
the asbestos-containing material during asbestos is not required to be stripped if
the stripping operation.
the following requirements are met:
(i) In renovation operations, wetting is (i) They can be removed, transported,
not required if the owner or operator has stored, and reused without disturbing or
obtained written approval from the
damaging the asbestos
Administrator by:
(ii) They are encased in a leak-tight
(A) Asking the administrator to
wrapping.
determine whether wetting to comply
(iii) It is labeled according to
with this paragraph would unavoidably I 61.149(d)(1)(i). (ii). and (iii) during all
damage equipment or present a safety loading and unloading operations and
hazard, and supplying the Administrator during storage.
with adequate information to make this
(6) For all asbestos-containing
determination before beginning to strip materials including those that have been
asbestos-containing material: and
removed or stripped:
(B) Using one of the following when
(i) Adequately wet the materials to
the Administrator does determine that ensure that they remain wet until they
equipment damage would be
are collected and contained or treated in
unavoidable or that a safety hazard
preparation for disposal in accordance
would exist:
with 161.150; and
(I) A local exhaust ventilation and
(ii) Carefully lower the materials to
collection system designed and operated the ground or a lower floor, not
to capture the particulate asbestos . . dropping, throwing, sliding, or otherwise
material produced by the stripping and damaging them: and
removal of the asbestos materials. The
(iii) Transport the materials to the
system must exhibit no visible emissions ground via leak-tight chutes or
to the outside air or be designed and
containers if they have been removed or
Fedora) Register / Vol. S4, No. 6 / Tueday. January 10. 1889 / Propped Rules
29
stripped more than SO feet above ground
level and were not removed as units or in sections.
(iv (Asbestos-containing materials contained in leak-tight wrapping that have* been removed in accordance with paragraphs (c|(J and (c)(3)(i)(B)(J| of this section need not be welted.
(?) When the temperature at the point of wetting is below 0*C (32*F):
(i) The owner or operator need not comply with paragraph (c)(2)(i) of this section and the wetting provisions of paragraph (c)(e) of this section.
(ii) The owner or operator must remove facility components coated or covered with asbestos-containing
materials as units or in sections to the maximum extent possible.
(Hi) During periods when wetting operations are suspended due to freezing temperatures, the owner or operator must record the temperature at the beginning, middle, and end of each work day and keep daily temperature
records available for inspection by the Administrator during normal business
hours at the demolition or renovation site. The owner or operator shall retain
the records of temperature for at least 2 years.
(8) All asbestos-containing material
shall be stripped, removed, and
otherwise handled by an owner or operator of a demolition or renovation
activity with at least one on-site representative, such as a foreman or
management level person, trained in the
provisions of this regulation and the means of complying with them. The
required training shall include as a minimum: applicability: notifications:
control procedures for removals including, at least, wetting, local exhaust
ventilation, negative pressure enclosures, glove-bag procedures, and High Efficiency Particulate Air (HEPA) filters: waste disposal work practices:
reporting and recordkeeping: and asbestos hazards and worker protection.
Evidence that the required training has
l>*en accomplished shall be made
available for inspection by the
Administrator during normal business hours at the demolition or renovation
site. This requirement shall become
effective one year after promulgation of this regulation. This training does not
replace the training requirements of the
OfTice of Pesticides and Toxic Substances nor the training ___ requirements of OSHA in 23 CFR IT.'O.M.
(H) For facilities described in paragraph (a)(3) of this section, adequately wet the portion of thr
facility that contains asbestoscontaining materials during the wrecking operation.
181.148 (Redesignated as (81.148 and Amended)
0. Section 61.148 is redesignated as 161.146 and is amended by revising paragraphs (a), the introductory text of (h). paragraph (b)(2). and paragraph (d) to read as follows:
(61.148 Standard tor spraying. a
(a) Use materials that contain 1 percent asbestos or less by area for spray-on application on buildings, structures, pipes, and conduits, except as provided in paragraph (c) of this section.
(b) For spray-on application of materials that contain more than t percent asbestos by area on equipment and machinery, except as provided in paragraph (e) of this section: 8018
(2) Discharge no visible emissions to the outside air from spray-on application of tha asbestos-containing material or use the methods specified by | 61.152 to clean emissions containing particulate asbestos material before they escape to. or are vented to. the outside air. 86688
(d) Owners or operators of sources subject to this paragraph ate exempt from the requirements of || 61415(a). 614)7. and 61.00.
(61.146 (Redesignated aa ( 81.147 and Amended)
10. Section 61.140 is redesignated as ( 61.147. paragraphs (b) (1) and (2) are revised, and paragraphs (b)(3) through (b)(8) are added to read as follows:
(81.147 Standard for fabricating 08446
(b)* * * (1) Discharge no visible emissions to the outside air from any of the operations or from any building or structure in which they are conducted or from any other fugitive sources: or (2) Use the methods specified by 1 61.152 to clean amissions containing particulate asbestos msterial before they escape to. or are vented to. the outside air. (3) Monitor each potential source of asbestos emissions from any pari of the fabricating facility including air cleaning devices, process equipment and buildings that house equipment for " material processing and handling, at least once each day. during daylight hours, for visible emissions to the outside air during operation. The'r monitoring period snail be of at least 15 seconds duration per source of emissions.
(4) Inspect each air cleaning device at
least once each week for proper
operation and for changes that signal
the potential for malfunctions including,
to the maximum extent possible, the- --'
presence of tears, holes, and abrasions -
in filter bags and for dust deposits on
the clean side of bags. For air cleaning -
devices that cannot be inspected on a
weekly basis according to this
paragraph, submit to the Administrator.--
and revise as necessary, a written
maintenance plan to include, at a
-
minimum, the following:
'
(i) Maintenance schedule.
(ii) Recordkeeping plan.
(5) Maintain records of the results of
visible emission monitoring and air
cleaning device inspections using a .
format similar to that shown in Figures 1'
and 2 and include the following:
(i) Date and time of inspection.
-i
(ii) Presence or absence of visible ' >
emissions.
(iii) Condition of bags, including wo
presence of tears, holes, and abrasions.
(iv) Presence of dust deposits on clean
side of bag.
(v) Brief description of corrective
actions taken including data and time. 1
(vi) Daily hours of operation for each "5
control device.
'*
(6) Furnish upon request and make '*
available during normal business hours
for inspection by the Administrator, all :
records required under this section.'
(7) Retain a copy of all monitoring and
inspection records for at least 2 years.
(6) Submit quarterly a copy of the
visible emission monitoring records to
the Administrator if visible emissions '
occurred during the report period.
Quarterly reports shall be postmarked i
by the 30th day following the end of the t
calendar quarter.
'*
(61.150 (Redesignated ns (61.144 and Revised I
11. Section 61.150 is redesignated as 161.146 and revised to read as follows:
(61.148 Standard for tnauisting materials.
No owner or operator of a facility may install or reinstall on a facility component any insulating materials that contain commercial asbestos if the materials are either molded and friable or wet-applied and friable after drying. ~ t The provisions of this paragraph do not : apply to spray-applied insulating ~ materials regulated under ( 61.146..J:. *'
(61.151 |Rsdsalgnatadaa( 61.148 and ; AmendedI
12. Section 61.151 is redesignated as 161.140 and is amended by revising ! paragraphs (a|. (b). (c)(1|(ii| and (iii). ' and (c)(2). and adding new paragraphs
(d) through (f) to read as follows:
930 Federal Register / Vol. 64. No.. 6 / Tueeday. January 10. 1089 / Proposed Ruli-w
| SI.14V Standard for araets disposal tor
aabastoa Mil*.
(a) Depoiit all asbestos-containing watte material at a watte ditposal tile operated in accordance with the provitiont of i 61.154; and
(b) Discharge no vitible emittiont to the outtide air from the transfer of control device asbestos watte to the tailing's conveyor, or ute the methods specified by | 61.152 to clean emissions containing particulate asbestos material before they escape to. or are vented to. the outside air. Dispose of the asbestos waste from control devices in -accordance with | 61.150(a) or paragraph (c) of this section; and
(c|* *
(1)*** (ii) Discharge no visible emissions to the outside air from the wetting operation or use the methods specified by | 61.152 to clean emissions containing particulate asbestos material before they escape to. or are vented to. the outside air. (iii) Wetting may be suspended when the ambient temperature at the waste disposal site is less then --8.5 *C (15 *F). as determined by an appropriate measurement method with an accuracy of mi*C (m2*F). During periods when wetting operations are suspended, temperature must be recorded at least at hourly intervals and records must be retained for at least 2 years in a form suitable for inspection. (2) Use an alternative treatment that has received prior approval by the Administrator. To obtain approval for an alternative treatment, a written request must be submitted to the Administrator. The Administrator will use the following criteria to evaluate the alternative treatment method: (i) The ability of the method to control asbestos emissions to levels equivalent to those achieved by currently required methods.
(ii) The suitability of the method for the intended application.
(iii) The likelihood that the method would contravene other regulations.
(iv) The likelihood that the method would result in increased water jmUubon. land pollution, or occupational
(d) If waste la transported by vehicle to a disposal site:
(1) Placard vehicle* used to transport, asbestos-containing waetc material. ... during the loading and unloading of waste so that the signs era visible. The placards must:
(1) Be posted in such a manner and location that a person can easily read the legend.
(ii) Conform to the requirements for 51 cm x 36 cm (20" x 14") upright format signs specified in 28 CFR 1910.145(d)(4) and this paragraph; and
(iii) Display the following legend in the lower panel with letter sites and styles of a visibility at least equal to those specified in this paragraph.
LEGEND ASBESTOS DUST HAZARD Do Not Remain In Area Unless Your Work Requires It Breathing Asbestos Dust Is Hatarduus to Your Health Notation
2.5 cm (l Inch) Sans Serif. Gothic or Block
l.B cm (5i inch) Sans Serif. Gothic or Block
14 Point Gothic
Spacing between any two lines must be at least equal to the height of the upper of the two lines.
(2) Provide a copy of the watte shipment record described in paragraph (e)(1) ol this section, to the disposal site owner or operator at the same time as the asbestos-containing waste material arrive* at the disposal site.
(e) For all asbestos-containing waste material transported off site:
(1) Maintain records, using a form similar to that shown in Figure 4. and include the following information:
(1) The name. EPA identification numtier. address, and telephone number of the waste generator.
(ii) The quantity of the asbestoscontaining waste material in cubic meters (cubic yards).
(iii) The name and telephone number of the disposal site operator.
(iv) The name and location of the disposal site.
(v) The date transported. (vi) The name*, address, and telephone number of the transported*) (2) Retain a copy of asbestos waste shipment record for at least 2 years.
(3) Maintain records of all waste shipments for which a copy of the waste shipment record signed by the owner or operator of the designated disposal sue. is not received within 35 days of the date the waste was accepted by die initial transporter.
(4) Prepare and submit a single copy of a semiannual report to the Administrator and include the following Information concerning off-site waste disposal activities during each consecutive 6-montb period:
(i) The name. EPA identification number, address, and location of the waate generator.
(ii) Thr calendar period covered by the report.
(iii) Using a format similar to that
shown in Figure 5. a list of all off-sili-
wujic shipment* including the date
shipped. the date received by thi-
disposal site, the quantity of asbcsi.is-
containing waste in each shipment (hotii
the quantity that is friable und that
which it nonfriable). the name of the
ditposal facility to which waste was
hipped, the name of the transporter,
and an indication of whether 35 days oi
more hove elapsed since the waste'was
hipped without having received a copv
of the waste shipment record signed ami
dated by the disposal site owner or
operator.
1
(f) Furnish upon request, and make
available during normal business hours'
for inspection by the Administrator, all
records required under this section.
161.152 (lledasignotad aa f 61.160 and
Wvetoed)
,r
13. Section 61.152 is redesignoted as' 161.150 and is revised to read as
follows:
(61.160 Standard for waste disposal tor manufacturing, fabricating, damotftion. renovation, and graying operation*.
Each owner or operator of an\ source
covered under the provisions of II 61.144.61.145.61.146. and 61.14? shall comply with the following provisions:
(a) Discharge no visible emissions to the outside sir during the collection, processing (including incineration), packaging, transporting, or deposition of any asbestos-containing waste material generated by die source, or use one of the treatments specified in paragraphs (a) (1) through (4) of this section. Paragraphs (a) (1). (2). and (4) of tins
section do not apply to nonfnaH<' materials.
(1) Adequately wet asbestoscontaining waste material as follows.
(i) Mi* control device asbestos w aM*to form a slurry: adequately wet othei asbestos-containing waste material and
(ii) Discharge no visible emissions to the outside air from collection, mixing wetting, and handling operations or use
the methods specified hy | 61.15: to clean emissions containing partii.uUte asbestos material before they esaupe to. or are vented to. the outside sir. and
(iii) After wetting, sea) all asbestoscontaining waste material in leuk-light containers while wet: or. for materia!* -
that will not fit into containers w ithoul .* additional breaking, put materials into leak-tight wrapping: and '
(iv) Label the container* or wrapped material* specified in paragraph (*)(1)(iii) of this section as follows
CAUTION Contains AsIm-sIiis
Federal Regiater / Vol. 54. No. 6 / Tueiday. January 10. 1989 / Proposed Rules
931
Avoid Opening or Breaking Container
Breathing Aabettoi ia Hazardous to Your Health
Alternatively, uae warning label* pacified by Occupational Safety and Health Standard* of the Department of Labor. Occupational Safety and Health Administration (OSHA) under 29 CFR 1910.1001(|)(2) or 192S.S8(k)(2)(iii). The label* shall be printed in letters of sufficient size and contrast as to be readily viaible and legible.
(v) Label containers or wrapped materials with the name of the waste generator and the location at which the waste was generated.
(2) Process asbestos-containing waste material into nonfriable forms:
() Form all asbestos-containing waste material into nonfriable pellets or other shapes: and
(ii) Discharge no visible emissions to the outside air from collection and
processing operations, including
incineration, or use the method specified by f 61.152 to clean emissiona -
containing particulate asbestos material before they escape to. or are vented to. the outside air.
(3) Broken areas of nonfriable asbestos material that potentially can be further broken, crumbled, pulverized, or reduced to powder in the course of operations regulated by this section must be either adequately wetted using a wetting agent or encapsulated. If encapsulated, these materials need not be sealed in leak-tight containers or wrapping. If adequately wetted, these
materials must be sealed in leak-tight containers or wrapping.
(4) For facilities demolished where the asbestos-containing material is not removed prior to demolition according to | 61.145 (c)(1) (i) and (ii). or for
facilities demolished according to f 61.145(c)(9). adequately wet asbestoscontaining waste after demolition and w hile loading for transport to disposal site.
(5) Use an alternative treatment that has received prior approval by the
Administrator according to the
procedure described in 161.149(c)(2). (b) All asbestos-containing waste
material from manufacturing and
fabricating and. for demolition and renovation, all friable and nonfriable asbestos-containing waste material that
potentially can be broken, crumbled,
pulverized, or reduced to powder in the course of operations regulated by this section must be deposited as soon as is practical at--
(1) A waste disposal site operated in accordance with the provisiona of 161.154. or
(2) A site that converts asbestos-
containing material into nonasbestos (asbestos-free) material according to the provisions of f 61.155.
(3| The requirements of paragraph fbl of this section do not apply to nonfriable materials from demolition and renovation operations that normally will not be broken, crumbled, pulverized, or reduced to powder, such as. packing, gaskets, asphalt roofing, and vinyl floor tile in good condition.
(c) When transporting asbestoscontaining waste material to a storage or disposal site:
(1) Placard vehicles used to transport asbestos-containing waste material during the loading and unloading of waste so that the signs are visible. The placards must conform to the
requirements of | 61.149(d)(1) (i). (ii).
and. (iii). (2) Provide a copy of the waste
shipment record, described In paragraph (d)(1) of this section, to the disposal site
owners or operators at the same time as the asbestos-containing waste material
arrives at the disposal site. (d) For all asbestos-containing waste
material including nonfriable material that potentially can be broken, crumbled, pulverized, or reduced to powder in the course of operations regulated by this section:
(1) Maintain records, using a form similar to that shown in Figure 4. and include the following information:
|i) The name. EPA identification
number, address, and telephone number of the waste generator.
(ii) The quantity in cubic meters
(cubir yards) that is friable and the
quantity that is nonfriable. (iii) The name and telephone number
of the disposal site operator. (iv) The name and location of the
disposal site. (v) The date transported. (vi) The name of the transportcr(s).
(2) Retain a copy of asbestos waste shipment records for at least two years.
(3) Maintain records of all waste shipments for which a copy of the waste shipment record, signed by the owner or
operator of the designated disposal site, is not received within 35 days of the da'e the waste was accepted by the initiul transporter.
(4) Prepare and submit a single copy of a semiannual report to the Administrator and include the following information concerning waste storage
and disposal activities during each consecutive 6-month period:
(i) The name. EPA identification number, address, and location of the waste generator.
(ii)The calendar period covered by
the report
(ill) Using a format similar to that shown in Figure 5. a list of all waste shipments including the date shipped, the date received by the disposal site, the quantity of asbestos-containing waste in each shipment (both the quantity that is friable and that which is nonfriable). the name of the disposal facility to which waste was shipped, the name of the transporter, and an indication of whether 35 days or more have elapsed since the waste was hipped without having received a copy of the waste shipment record signed and dated by the storage or disposal site owner or operator.
(e) Furnish upon request, and make available during normal business hours for inspection by the Administrator, all records required under this section.
161.153 (Wsdssfgnotsd an 161.111 and Amended)
14. Section 61.153 is redesignated as 161.151 and ia amended by revising the introductory text paragraphs (a)(2). (a)(4). and (b)(3). and adding paragraphs (d) and (e) to read as follows:
f 61.151 tlandard for Inocttvs waete disposal sites for asbestos mats and manufacturing and fabricating operations.
Each owner or operator of any inactive waste disposal site that was operated by sources covered under f 61.142.61.144, or 61.147 and received desposits of asbestos-containing waste material generated by the sources, shall:
(a) * *
(1) * * *
(2) Cover the asbestos-containing vvAstc material with at least IS centimeters (6 inches] of compacted nonasbestos-containing material, and grow and maintain a cover of vegetation on the area adequate to prevent exposure of the asbestos-containing waste material. In desert areas where vegetation would be difficult to maintain, at least 6 additional centimeters (3 inches) of well-graded, nonasbeslns crushed rock may be placed on tup of the Final cover instead of vegetation and maintained to orevent missions: nr 004
(4) For inactive waste disposal sites for asbestos tailings, a resinous or petroleum-based dust suppression agent that effectively binds dust to.control surface air emissions mey be used instead of the methods in paragraphs (a) (I). (2). and (3) of this section. Use the/ agent in the manner and frequency recommended for the particular asbeatos tailing! by the manufacturer of.' the dust suppression agent to achieve and maintain dust control. Obtain prior '
32 Federal Remitter / Vol. S4. No. 6 / Tuesday. |anutry 10. 1969 / Proposed Rules
approval of Ihe Administrator to use other equally effective dust suppression gents. For purposes of this paragraph, waste oil is not considered a dual suppression agent.
(b) * ` * (3) When requesting a determination on whether a natural barrier adequately deters public access, supply information enabling the Administrator to determine whether a fence or a natural barrier adequately access by the general public.
46
(d) Obtain the Administrator's approval in writing prior to disturbing any asbestos-containing waste material that has been deposited at a waste disposal site and is covered. Provide the following information to the Administrator
(1) Reason for disturbing the waste. (2) Procedures to be used to control emissions. (3) Location of the final disposal site. (e) Within 60 days of a site becoming inactive and after the effective date of this subpart, record, in accordance with State law. a notation on the deed to the facility property--or on some other instrument which is normally examined during a title search--that will in perpetuity notify any potential purchaser of the property that: (1) The land has been used for the disposal of asbestos-containing waste material: (2) The surv ey plat and record of the location and quantity of asbestoscontaining waste disposed of within the disposal site required in | 61.154(g) have been filed with the Administrator, and (3) The site is subject to 40CFR Part 1 Subpart M.
f <1.154 (RsdeelgneteU aa | <1.152 and Amended)
15. Section 61.154 is redesignated as I 61.152 and amended by removing paragraph (aKU(i). redesignating paragraphs (a){l>(ii J--(iv| as paragraphs (aHU(iHiii). redesignating paragraph (b)(2) as paragraph (b)(3). revising the introductory text of paragraph (a) and
paragraphs (b)(1) and (b)(3). and adding paragraphs (a)(3) and (b)(2) to read as follows:
f 61.1S2 AJreWwWng.
(a) The owner or operator who uses ir-cleaning. as specified in || 61.142(a|. 61.144(b)(2). 01.t4Mc)(3Mi)fB)(fl. 61.1S(cM4)(ii). 61.146(b)(2). 61.147(b|(2). 61.149(b). 61.149(1.)(1)(ii). 61.150(a)(1|(ii).
C 1.1SO (a)(2)(ii). and 61.155(e) shall:
(3) For fabric filter collection devices installed after (the date of proposal of (his NESIIAP revision), provide for easy inspection for faulty bags.
(b) * * (1) After (the date of proposal of this NESHAP revision), if the use of fabric creates a fire or explosion hazard, or the Administrator determines that a fabric filler is not feasible, the Administrator may authorize as a substitute die use of wet collectors designed to operate with a unit contacting energy of at least 9.65 kitopascals (40 inches water gage pressure). (2) Use a HEPA filter that is at least 99.67 percent efficient as determined by ASTM method D-2966-71. (3) The Administrator may authorize the use of filtering equipment other than described in paragraphs (a)(1) and (b)(1) and (2) of this section if the owner or operator demonstrates to the Administrator's satisfaction that it is equivalent to the described equipment in filtering particulate asbestos material.
. | <1.15$ (Wedeelgnated as ( <1.153 and Amendsd]
16. Section 61.155 is redesignated as 161.153 and amended by redesignating paragraphs (a)(3) and (a)(4) as paragraphs (a)(4) and (a)(5). respectively, revising the introductory text of paragraphs (a), (a)(4). and (a)(5) and paragraphs (a)(2). (a)(4)(ii) and (iii). and (b). and adding paragraph (a)(3) to read as follows:
| <1.153 Reporting.
(a) Any new source to which this subpart applies (with the exception of roadways, demolition and renovation, apraying and insulating materials), which has an initial startup date preceding the effective dale of this revision, shall provide the following information to the Administrator within 90 days of the effective date. In the case of a new source which did not have an initial startup date preceding the effective date, the information shall be provided within 90 days of the initial startup date. Any owner or operator of an existing source who provided this information prior to the effective date is not required to resubmit it. Any changes in the information provided by any existing source shall be provided to the Administrator withm 30 days after the change.
aa as<
(2) If a fabric filter device is used to control emissions.
(i) The airflow permeability in m'/ min/m* (f(*/min/ft*| if the fabric filter device uses a woven fabric, and: if the fabric is synthetic, whether the fill yam is spun or not spun: and
(ii) If the fabric filler device uses a felted fabric, the density in g/m* (oz/ yd7), the minimum thickness in millimeters (inches), and the airflow
permeability in m*/min/m* (ft*/min/
(3) If a HEPA filler is used to control
emissions, the efficiency as determined
by ASTM method IV-2986-71.
(4) For sources subject to { r.i/un
and 61.150: 6 6
(ii) The average volume of asbestos-
containing waste material disposed of.
measured in cubic meters (cubic yards):
and
(iii) The emission control methods
used in all stages of waste disposal: and
6
66
(5) For sources subject to f 61.151: 6 66 a
(b) The information required by
paragraph (a) of this section must accompany the information required by I 61.10. Roadways, demolition and renovation, apraying and insulating materials are exempted from the requirements of 161.10(a). The information described in this section must be reported using the format of
Appendix A of this part as a guide.
161.154 (Redesignated aa ( <1.154 ana Amended 1
17. Section 61.156 is redesignated as 161.154 and amended by revising the introductory text of | 61.154. paragraphs (c) and (d). and adding paragraphs (H through (k) to read as follow s:
(<1.154 Standard for active waste miponi sites.
Each owner or operator of an active waste disposal site that receives asbestos-containing waste material under || 61.149 and 61.150 shall mret the requirements of this section: 99
(c) Rather than meet the no v isilile emission requirement of paragraph (a) ol this section, at the end of each operating
day. or at least once every 24-hour period while the site is in continuous operation, the asbcetos-containinp
waste material which was deposited at the silt during the operating day or
previous 24-hour period shall;
(1) Be covered with at least 15 centimeters (6 inches) of compacted nonasbestos-containing material, or
(2) Be covered with a resinous or petroleum-based dust suppression agent
which effectively binds dust and controls wind erosion. Such agrnt shall
be used in the manner and frequency recommended for the particular dust by the dust suppression agent manufacturer
to achieve and maintain dust control.
Other equally effective dust suppression gents may be used upon prinr approval by Ihe Administrator. For purposes of
Foderml Register / VoL 84. No. 6 / Tuesday. January 1ft 1989 / Propoed Rule*
033
hit paragraph, watte oil U not considered a duet suppression agent.
(J) Rather than meet the no visible emission requirement of paragraph (a) of thit section, use an alternative control method for emissions that has received prior approval by the Administrator according to the procedures described in 161.149(c)(2).
(e) For all asbestos-containing watte
materia! received, the owner or operator shall:
(1) Maintain records, using s form similar to that shown in Figure 4. and include the following information:
(1) The name. EPA identification
number, address, and telephone number of the waste generator.
(ii) The name of the transporter
fit:) the quantity of the asbestoscontaining waste material in rubir
meters (cubic yards). (iv)The presence of improperly
enclosed or uncovered waste, or any ehrtcs-containing wate mater*!I not se.i'.cd in leak-tight containers.
l\) The date of receipt.
(2) As soon as possible and no longer than 30 days after receipt of the waste, send a copy of the signed waste sh;pmcnt record to the generator.
(:t) Retain a copy of the records required by this paragraph for at li'ist
two year*. (4! I'pon discovering a discrepancy
between the quantity of waste designated on the waste shipment
rec-nds and the quantity actually rci rived, attempt to rcroncile the discrepancy with the waste generator. If
the discrepancy is not resolved within 13 days after receiving the waste, in.r.odlately report to the Administrator, ii* .uniting the discrepancy and attempts
to reconcile it and submit a copy of the waste shipment record along with it.
|Pi The owner or operator of a disposal site shall prepare and submit a siihjle copy of a semiannual report to the Administrator and include the following
Information concerting activities during eat h conser.u'.r. e 6-ninr'h period.
It I The name, address anti Inc.i'inn of
the disposal site.
12) The i:.ileodar perin-J covered by
tlie report
|3) The method of disposal.
(411'sing a format similar to that shown in Figure. 5. a list of alt asbestoscontaining was'e shipments including, the date received, the name and EPA identification number of the generator, the date shipped from the generator, the quantity of atlieslns-cnri'.iining waste in i.'ij .1- chipmonl (both the quantity that is fiialile and that which is nonfriuble). the na'ue of the storage site and transporter, and the dale that a cup., of the waste
shipment recArd was tent back to the generator and storage aile.
(g) Maintain until cloture, records of the location, depth and area, and quantity in cubic meter* (cubic yards) of asbestos-containing watte material within the disposal sit* on a map or diagram of the disposal arts.
(h) Upon cloture, comply with all the provisions of | 81.151.
(i) Submit to the Administrator, upon cloture of the facility, a copy of records of asbestos watte ditpotaf location! and quantities.
(j) Furnish upon request and make available during normal business hours for inspection by the Administrator all records required under thit section.
(k) Obtain the Administrator's approval in writing prior to disturbing any asbestos-containing watte material
th it hat been deposited at a waste disposal site and is covered. Provide (he following information to the
Administrator. (l) Reason for disturbing the waste.
|2) Procedures to be used tu control omissions.
13) Locution of the temporary storage and final disposal site.
1. Section 61.153 is aJded to Subparl M to read as follows:
1*1.15$ Standard for operations that convert asbestos-containing waste material Into nonasbesto* (asbestos Steal material.
Kach owner or operator of an operation !ha`. converts asbestoscontaining waste material into nonasbestos (asbestos-free) material ahull meet the requirements of this section.
(a) Obtain the written approval of the Administrator to construct. To obtain
approval, provide the Adminiatrntor with the following information:
(1) Application to construct pursuant o | 61.07.
(2) In addition to the requirements of 161.07(b)(3). supply the following process information to the Adminiatraton
(i) Description of w.iate feed bundling mid temporary storage.
(ii) Description of pro< ess operating
conditions.
(iii) Description of end product handling and temporary storage.
(3) Performance test protocol, including provisions for obtaining information required under paragraph (b) of this section.
(4) The Administrator may require diet a demonstration of the process Itc performed prior to approval of the application to construct.
(Is) Conduct a start-up performance lest. Test results shall include:
(1) A detailed description of the types and quantities of nonasbesto* material and asbestos-containing wastes processed, e.g.. asbestos cement products, friable asbestos insulation, plaster, wood, plastic wire. etc. Test feed is to include the full range of materials that will be encountered in actual operation of the process.
(2) Results of antlytes. using polarised light microscopy, that document the asbestos content of the wastes processed.
(3| Results of analyses, using transmission electron microscopy, that document that the output materials are free of asbestos. Samples for analysis. are to be collected as 6-hour composite samples (one 200 gm sample per hour), beginning with the initial introduction nf asbestos-containing waste material and continuing until end of performance test.
(4) A description of operating parameters, such as temperature and residence time, defining the full range over which the process is expected to operate to produce nonasbettos (asbestos free) materials. Specify the. . limits for each operating parameter w ithin which the process will produce nonasbettos (asbestos-free) materials.
(3) The length of the test
(r.) During the inteal 90 days id operation. .
(1) Continuously monitor and log the operating parameters identified during start-up performance tests that .ire intended to ensure the production of nonasbestos (asbestos-free) output material.
(2) Collect and analyse samples, taken as 10-day composite samples (one 200 gm sample collected every 6 hou-s of operation) of all output materia! for the presence of asbestos. Composite samples may be for fewer than 10 d.iv s. Transmission electron microscopy shall ( used to analyse the output material for the presence of asbestos. During the
initial 90-day period all output materials must be stored onsite until anal) si* shows the material to be asbestos-fmc or disposed of at asbestos-containing waste material according to 161.150.
Id) After the initial 90 days of operation.
(1) Continuously monitor and record the operating parameters identified during start-up performance testing anJ any subsequent performance testing. Any product produced during a period of deviation from the range of operating conditions established to ensure the production of nonatbestot (asbestosfree) output materials shall be:
(i) Disposed of us asbetlos-contuin.'itg waste material according to { 61.150. or
934 Federal Kegirtet / VoV M. No. t> / Tuesday, |onuary 10. 1083 / Proposed Rules
(ii) Recycled at waste feed during process operation within the estabhshi-d range of operating conditions, nr
(iii) Stored temporarily onsite until analysed for asbestos content. Any product material that is not asbest.io free shall be either disposed of a* asbestos-containing waste material nt recycled.
|2) Collect and analyze monthly composite samples (one 200 pm sample collected every 8 hours of operation) of the output material. Transmission electron microscopy shall be used to analyze the output material for the presence of asbestos
(e) Discharge no visible emissions to the outside air ironi any part of the operation or use the methods specified
by I 61.152 to clean emissions containing particulate asbestos material before they escape to. or are vented to. the outside air.
(f) Maintain records and include the following information:
(1) Results of start-up performance testing and any subsequent performance testing including operating parameters, feed characteristics, and analyses of output materials.
(21 Results of the composite analyses required during the initial 90 days of opeiation under | 61.155(c).
(3) Results of the monthly composite analyses required under | 61.155(d).
(41 Results pf continuous monitoring and logs of process operating parameters required under | 61.155 (c) ar.d (d).
(5) The information on waste shipment's received as required in
(61.154(e). (6) For oulput materials where no
analyses were performed to determine
the presence of asbestos, record the name and location of the disposal site to which the output materials were
deposited, and the date of disposal (7) Retain records required by-
paragraph (f) of this section for at least 2
years. (g) Submit the following reports to the
Administrator. (1) A report for each analysis of
product composite samples performed during the initial 90 days of operation.
(2) A quarterly report including the
following information concerning activities during each consecutive 3month period:
(i) Results of analyses of monthlyproduct composite samples.
(ii) A description of any deviation
from the operating parameters established during performance testing,
the duration of the deviation, and steps taken to correct the deviation.
(iii) Disposition of any product produced during a period of deviation including whether it was recycled,
disposed of as asbestos-containing
waste material, or stored temporarily . onsite until analyzed for ashi-sto*.
content. (iv) The information on waste
disposal activities as required in
I 61.154(f). (h) isfonasbestos (asbestos-fret) o-itpi:i
material is not subject to any of the provisions of this subpart Output materials in which asbestos is detected, or output materials produced when the
operating parameters deviated from
those established during the start-up
performance testing, unless shown by
transmission electron microscopy (TF.M)
analysis to be asbestos free, shall be
considered to be asbestos-containing.
waste and shall be handled and .
dispoaed of according to 11 61150 anil
61.154 or reprocessed while all of the
established operating parameters are
being met.
- t
19. Section 61.156 is added 'o S.ibpan M to read as follows:
| t.156 Cross rattrance to other asbestos regulations.
It. addition to this subpart, the regulations referenced below also tipply to asbestos and may be applicable to those sources specified in {( 61.142 through 61.151.61.154. and 61.155 of this subpart. These cross references are presented for the reader's information and to promote compliance with the cited regulations.
20. Section 61.157 Is added to Subpart M to read aa follows: 1.1(7 Pels get! on at authority.
(a) la delegating implementation and enforcement authority to a State under Section 112(d) of the Act the authorities
oohteined in paragraph (b) of this ' section shall be retained by the Administrator and not transferred to e State.
(b) Authorities which wilt not be delegated to States:
(1) Section 61.149(0(2). (2) Section 61.150(a)(5| (3) Section 61.151(c). (4) Section 61.152(bH3). (5) Section 61.154(d).
(6) Section 61.155(a).
Federal Rentier / Vol. 54. No. 6 / Tueiday. lanuary 10. 1989 f Propoed Rules___________835
Figure* le Subpart M
Figure i . Record of Visible Emission Monitoring
{I
I
i
1 Coneol Oewo* Oregneeon or number_______________ _______ 2 Oats o* riapacaon........................ .................................. ........_... 3 Tan* ot Innaacaan____________________________ * I* control IMM OperMng property (V**/No)---------------- -----* Tear*, hoi**. r abrasions *> beg* (Ye*/No)_____________ ___ Dull on Noon arte 0< bog* (Vo*/No)__________________ ____ T Other gnt ol malfunction* Of potensal iwoWuncton* (Yot/Nol . Dead** 00<*r maltuncton* or ognt ol potonool malfunction*.
t Describe conocOv* action<*) taken
10 Do10 and am* conecev* acton taOan tl Inioociod by:
(Pnm/Typ* Name)
{Trta)
(Sfgnowal
>*)
./j
.V.S
i " r
(Pnni/Typo Noma)
(fill*)
(S^natwe)
CData)
Figure 3. Notification of Demolition and Renovation
I. Name, eddrett. and telephone number ot: (a) Facility owner or operator
(name)
(addreat)
(phone number)
(peraon to contact and telephone number) (b) Aabealo* removal contractor
(name)
(addreaa)
(phone number)* II. III. IV. V.
(peraon lo contact and telephone number)
II. Type of operation: demolition____
renovation __
III. Deacrtption of facility
(a) Location --
(bj Address
-
--
(c) Site (aquare meter (square feet] and
number of floor*) -
- ...............
(d) Age -- .i
--.
(e) Prior etc
.
----------------
-
IV. I* aabeatoe present? yea____ no_____
V. Procedure uaed to detect the pretence of aabettoa material:
VI. Approximate amount of aabealo* that la friable; nonfriable. but ha* the potential to be broken, crumbled. pulverixed. or
reduced to powder, and nonfriable. ' Specify amount of aabealo* in term* of: linear meter* (linear feet) on pipe*: aquare meter* (aquare feet) for aurfaca area and cubic meter* (cubic feet) for volume on both. (a) Friable---------------------------------------------------(b) Nonfriable. but may become broken, crumbled, pulverized, or reduced to powder-- (c) Nonfriable ------------------------------------------------
VII. Scheduled date* of a*b**to* removal
Start - -
---
Completion --
--
VUL Scheduled date* of demolition or
renovation
Start
' --
Completion
-- --
IX. Description of planned demolition or renovation work, and methodic) to be
uaed.
X. Description of work practice* and engineering control* to b* uaed to prevent emiMions of aabealo*.
(a) At the demolition and renovation alte
(b) During atorage of the waato
(c) At the watte diapoaal cite
XI. If you are claiming an exemption from certain requirement* of the asbestos NESHAP (40 CFR Part 01. subpart M) for. all or part of the nonfriable asbestos reported in item VI (b) and (c) above, describe the procedure* to be uaed to prevent nonfriable material from being broke, crumbled, pulverized, or reduced to powder.
(a) At the demolition Jite
.
(b) At the atorage site
(c) At the waste disposal site
X1L Name and location of the waste disposal ait*
X1U. If ordered by a government agency, name, title, and authority of government agency requiring the demolition.
Date order issued Date demolition ordered to begin
-
XIV. For emergency renovation* (a) Dale and hour (hat the emergency oc
curred---- I . .
------- ------
(b) Dsfacription of the sudden unexpected
event - ...
(c) Explanation o( bow the event caused
unsafe condition* or serious disruption of in
dustrial operation*
--- -
936 Federal Register / Vol. 54. No. 6 / Tuesday. January 10. 1969 / Propoaed Rules
XV IVa.-riplion of prot.edurp* to be fullov. r.l m llevent that unrxpeeicit xvliestni in
f.'-.n.il or prev itut<>!v ntmfi raiile e*!*eti- material lieiitme* hruke. r.f untl.'.erl p..1'cured o- rnf.i.. .1 i.> p.-w.l.i
XVI Ircrtrl) that tl.r I.m.iw rc uuliv i.i.i.il Mil! bo on kite di.nne tin- d. m.l'i.nn f renovation *n.l h.n. I... n ii.nned in tin* provision* o! thu n-j;. in |<l lTK l\.-t f.l. *u!ipari MJ a-:.Ii.i.T.i * ihw! tlie requiri d training li.<s !>. :-. ai iompli.'n j l>> tin* person Mil! It o' .-!li!o for
ii.T. rii.nr.p nr>---o! Ii.imop** hour*
(n.iotej
fl.Url
(>rar Mi'.h firm!
(Ripr.n'.uro of onit or operator |
(Dale)
Figure 4. Asbestos Waste Tracking System
1 Work R.lr Snr an : V ^ Address ------
Ottnrr NjmeOmncr s Phono No------------------OM nor's Phono No------------------ Operator's Name and Address.
Operator's Phono No
--
Operator's VS D'A ID No - -------
3 Waste Disposal S '.f (WDS) Name and
Mailing Address
WDS Phone No ----------------------------------------WDS VS F.PA ID No -----------------------------------
4 Description of Materials
(a) -----------------------------------------------------------------
(l,I ------------------------------------------
ft! ------------------------------------------------------------(dl -----------------------------------------------------------------
It I --------------------------------------------------
5 Containers No andTvpr
fn I ---------------------------------------------- --
(I'l ----------------------------------------------------------------(cl ----------------------------------------------------------------(d| ------------------------------------------------------------(el -------------------------------------------------------------
6 lota! Quantm ft or vd' (a| -----------------------------------------------------------------------(b| ------------------------------------------------------------(c)
Id) -----------------------------------------------------------------
(c)
T. Special Handling Instructions and
Additional Information
A OPERATOR'S CERTIFICATION I heri-lt) declare that the contents of this consignment are full) and accuieiel)
dusr.rilted above by proper shipping
to transport the asbestos materials
name and are classified, packed maikril. ar.d labeled, and are in all respects in proper condition fnr lraii*t rl by highwayacrnrilmp to applicable intemationnl and government
regulations
listed in ilem 4. Also en'or one of th..
following container codes used tr. transporting eat.h type of asbestos material (specify ar.y othrr ty;.r of conl.iiner used if nut listed bi ' ;
Pt .!ii*J1"l > ped N.inie 4 Title Sipnatute 1 - ' - -- -- Month Day Year A Transporter 1 I Acknowledgement ol
-
l)M--Mrial drums, b.irn-U Dl'--I'ijsiic drums, barrels DA--6 mil plastic bags or wr.^
Kempt of Materials)
6 Enter Ihe friable and nc.r.fr:.'..!
l*rir.ii'il "Iyped Name 4 Title - - -- quantities of each type of rtsbest s
'
S.y.aijtc Month Do> Year Id Transporter 2 |Acknowledgement ol
Reretp' of Material*!
maletial removed in units i! ru1.. :
(ft ') or cubic yards (yd *5J1as2 3 4
appropriate.
" ' '
Printed'Typed Name 4 Title '
7. Use this space tu indicate spei t..l .
Sicnjtuie
'
-- transportation, treatment, storage rr
Month Day Year 11 Discrepancy Indoatiieh Space
disposal or Bill of Lading information If an alternate waste disposal site is
12. Waste Disposal Site--Owner or Operator. designated, note it here. Emergency '
Certification of receipt of atbettos materials response telephone numbers or similar
covered by this manifest except as noted in information may be included hr>t- -
item it
-----
Primed'Typed Name 4 Title --
Signature'
---
Month D.ty Year
............... -- --
INSTRUCTIONS
Waste Generator Section (Items 1-6)
6. The authorized agent cf tinoperator must read and then s en -r ! dati this certification. The datr is t`-,idate of receipt by transporter.
Note: The operator must retain a rnr> n' this form.
1. Enter the name of the facility at which asbestos waste is generated and
Transporter Section (Items 9-10)
the address where the facility is located. 9. & 10. Enter name of transporter firm,
In the appropriate spaces also enter the if applicable. Print or type the full name
name of the owner of the facility and the and title of person accepting
owner's phone number.
responsibility and acknowledging
2. If a demolition or renovation, enter receipt of materials as listed on this
the name and address of the company waste shipment record for transport
and authorized agent responsible for
Enter date of receipt and signature.
performing'the asbestos removal. In the appropriate spaces, also enter the phone number and the US EPA ID Number of
Note: Thr transporter must retain a rcpi f this form.
the operator.
Disposal Site Section (Items 11-121
3. Enter the name and address of the waste disposal site (WDS) which will be receiving the asbestos materials. In the appropriate spaces also enter the phone number and US EPA ID Number of the WDS. Enter ''on site" if the waste will be disposed of on the generator's properly.
4. Indicate the types of asbestos waste materials generated. If from a demolition or renovation, possibilities
11. The authorized representative of
the WTJS must note in this space aiv discrepancy between waste described
on this manifest and waste actual!) received. Any rejected materials shou'.J be listed and destination of those materials provided. A site that converts asbestus-containing waste material to
nonasbeslot material is considered a
WDS.
include, but are not limited to:
12. The signature (by hand! of tin
--Spray-on asbestos insulation from
piping --Wrapped asbestos Insulation front
piping --Spray-on asbestos celling/wall
authorized WDS agent induatcs acceptance and agreement wills statements on this manifest except as noted in ilem 11. The date is the date of
signature and receipt of shipment.
insulation --Asbestos ceiling tile
--Asbestos wallboard
Note: The WDS must retain a cori-.| h ted copy of this form. The WDS mu*! also tend a completed copy to the operator hated in item
S Enter the number of containers used
Federal Register / Vol. S4. No. 6 / Tuesday. January 10. 1989 / Proposed Rules
Figure S. Information Required on Inpivioual Waste Shipments for Semiannual Reports
937 a
* A sn* < eenvarls asOaiot-conu<n<ne watte maiane'io nonatbMtot matane' eorwdsrad a topoiai ane * tiACAie "yn a mo* man JS flay* ht* Npm one* * watte *11 theewd and a agnMl and aaiad !! mvnent record (WSR) hat no: on*' M Fwow wit * WSALWattt SNpmom Record
- IV/
II In Pari 763:
2.8) adding 1763.06 to Subpart E to provisions of 40 CFR Part 61. Subp iri
PART 79--( AMENDED J
read as follows; - >
M--National Emission Standards fur .
1. The authority citation for 40 CFR Part 763 continues to read as follows
Authority; IS US C. 2603 and 2C0?U)
17S3.S4 Dtapoaal. : r* .
All persons participating in disposal activities affecting friable asbestos- -
Asbestos If such persons violate ar.t__ __
provision of such subpart. it will be - r,
violation of this section also
--------
Subpart E alto ittued under IS U.S C. 2641.
containing material removed from"a a
|FF Doc. 69-494 Filnd l-a-89 S 4.v an.;____
j 2643. 2646. and 264*
school building must comply with the..
eAM6 coot atto-sa-u
*
i r\
-<
i
*
*t