Document BR7LnMJ25kx128q9wOzRZBXnE
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 5
77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604
DATE: SUBJECT: FROM: THRU: TO:
See Date of Section Chief Signature Below
CLEAN AIR ACT INSPECTION REPORT Pure Asphalt Co./ Pure Coatings Group, Chicago, Illinois
Alexandra Letuchy, Environmental Engineer AECAB (MI/WI)
Sarah Marshall, Section Chief AECAB (MI/WI)
File
BASIC INFORMATION Facility Name: Pure Asphalt Co./ Pure Coatings Group
Facility Location: 3455 W. 31st Place, Chicago, IL 60623
Date of Inspection: 9/7/21
EPA Inspector(s): 1. Sasha Letuchy, Environmental Engineer 2. Veronica Fischer, Environmental Engineer 3. Brittany Cobb, Environmental Engineer
Other Attendees: 1. Mike Francis, Vice President
Contact Email Address: MikeF@PureAsphalt.com
Purpose of Inspection: Clean Air Act Inspection
Facility Type: Asphalt emulsion, crack fill, and lubricant manufacturer
Regulations Central to Inspection: SIP/Permit Compliance
Arrival Time: 2:00 pm Departure Time: 3:30 pm
Inspection Type: Unannounced Inspection Announced Inspection
OPENING CONFERENCE
Presented Credentials Stated authority and purpose of inspection Provided Small Business Resource Information Sheet via email Small Business Resource Information Sheet not provided. Provided CBI warning to facility
The following information was obtained verbally from Mike Francis unless otherwise noted.
Process Description: The facility produces three main products: 1) asphalt emulsions; 2) hot pour crack fill; and 3) lubricants.
Asphalt is delivered to the facility once a week or every two weeks and is pumped from a truck into one of eight (30,000 gallon) asphalt storage tanks. Asphalt is stored at 200 degrees Fahrenheit. Asphalt, water, and soap are combined in a pressured rotor stator to grind up the asphalt and suspend it in water. This emulsified asphalt is pumped to one of two final product storage tanks (20,000 gallon and 15,000 gallon). The asphalt tanks and final product tanks are located outside of the building. Pure Asphalt also operates an asphalt emulsion process across the street at 3300 W. 31st Place. A small dust collector is used at this plant to control for particulate matter.
The hot pour crack fill process is similar to the asphalt emulsion process. Asphalt, water, soap and additional additives are combined in a mixer. The entire process is conducted at a slightly lower temperature.
Staff Interview: It was not clear whether the facility had a construction permit or an operating permit. Mike informed the inspectors that Pure Asphalt is conducting annual emissions calculations for its boiler located at 3300 W. 31st Place.
TOUR INFORMATION
EPA Tour of the Facility: Yes
Data Collected and Observations: EPA toured the facility at 3455 W. 31st Place, including the asphalt emulsion line rotor stator and the hot pour crack fill line mixer. Next, inspectors toured the tank farm.
2
Photos and/or Videos: were not taken during the inspection.
CLOSING CONFERENCE Provided U.S. EPA point of contact to the facility
DIGITAL SIGNATURES
ALEXANDR
Digitally signed by ALEXANDRA LETUCHY
Report Author: _A__L_E_T_U__C_H__Y__D1_5a:t_4e4:_:200_92-_10.5_0'90_.02'_1 ____________
SARAH
Digitally signed by SARAH MARSHALL
Section Chief: _M_A__R_S__H_A__L_L__D1_1a_:t2e2_::20_012_-10._50'90_.02_'1 _____________
3