Document B8ej97yMqLeRQGn214kbGaNRw
PLAINTIFF'S EXHIBIT
_ AMERICAN ^STANDARD
a----------
BB AA
KEWANEE SQUARE-HEAT BOILER UNITS
Ratings and Data -- forced-draft--oil, gas
UNIT NUMBER
SBl grcss output horsepov.er -- St53TI P3" 'CUT steam Soi ret rating--steam
M r.
cs. sc. ft. sc. ft
Firing rate--gas 1000 Stu cu. *i oii i-0.000 Btu
Heating surface--Total primary
sc. ft. sq. ft.
Furnace vol. net
cu. ft.
Safety vaive capacity steam ce# hour its.
Approximate Cry weight
1 b s.
Vent diameter--forced a raft Stack diameter--natural draft Stack height--natural draft
:r. in. ft.
3R1-F 3R2-F 3R3-F 2R4-F 3R5-F |3R6-F | 3R7-F 3R8-F 3R9-F 3R10-F3R11-F 3R12-F
324 10
334
1 ?rG 1010
396 12
403 16:0 1240
463 14
432 iecu 1460
540
15 CO. 22:0 1520
648 19
663 2700 2020
"92 ni
316 3300 24S0
935 28 965 3900 2930
1080 32
1113 4500 3380
1250 33
1299 5250 3940
1440 43
1484
6000 4500
1620 1670 5060
1900
7500 5520
405 2.9
53 20.5
495 3.5
5: 22.3
535 4.2
77 25.2
575 4.3
35 .0
810 5.3
105 33.0
990 7.1
129 36.6
1170 8.4
153 40.4
1350 9.6
177 44.5
1575 11.2
206 49.5
1300 12.9
236 54.1
2025 1^
265 53.4
2250 16.1
294
7.8 424
9.1 520
10.5 bio
11." "04
15.4 17.9 20.4 23.3 29.5 33.4 37.1 JO.8 848 1032 1224 1416 1648 1888 2120 2352
1650
6 12 30
15C0
5 12 35
1950
5 12 35
2100
5 12 40
2350
8 15 35
2700
3 15 40
3000
8 15 40
3300
3 15 45
3700
10 18 35
4150
10 18 40
4500
10 18 45
1900
18 50
Dimensions (inches)
A -- Bciler length Ai --Overall length
A2 --Overall length including tuce removal B --Overall width C -- Overall height C; --Shell height
30 v: 46 v;
70 374-i 59 CD
36-2 52-:
82 37' S 59 CD
JC- -
56-: 04
37'; 59 55
45-* 64"- 1
196 27-7
zv 2 zz
D -- Boiler centerline to greatest width E -- Reer smokebox depth
21 v: r
21-: *1: -
--Standard rear outlet --Top outlet (creed craft --Too outlet natural craft F -- Front smokePox
833 8:-: 3': 8'-: r: 12-e 12- - 12-: vc:, 8383
Be: 1 e' snell width K-. -- F re cox length K: V\ idtn Kj Height
L -Srrc^e outlet diameter --forced craft --natural d'eft
N --Sr-c'e cutlet he'ght--ree- outlet
-- too outlet
P -Sued/ s zs 0 -- Sure' location R -Slcc:. ne.gnt
23--> 25; 9 24 18: >
6 12 36 42*i
J
10 cb
23 - ;
31: 2 24 18
5 12
36 J2:2 c
12 55
23-c 37-: 24
18'-2 6 12 36
4
14
DC
2S; > 4j- 2 24 13-2
5 O 35 jr
10
fc
b -- De:_ n .ccaticn -Ret-- see
V -- Safety va.ve icccTc*' '< -- Normal waterline Y --Cd ccnr.ecticn reig":
AA -- Base lengtn __ B_3 -- Base -v:c:n
HH -- . _:e -e--c.al space
7
3 46 47 33' 32'
-
3
3 Jo 47 :: . ** ,
>*
7 ; 3 46 4' 4:, - 3^
n
:5 47 =: , 32 ;
-
Ada '0' -creased length .1
s~o-f out'e: <s used See c rrens on S
*!:Ctd A -- e'ca - Sfa idai a l s - it -- ege: ,n boMs --9 i- tcMcuc'e
42 v? 59 V2
94 42 67 62
23 >/2
50- 2 67-c
110 42 67 52
23'-
58 75
125 42 67 62
23 V:
67 84
143 42 67 62
23 V-
56',: 75V:
123 49 76*/71
27
83'/:
139 49 76 ;/2 71
27
72 9i 154 49
71
27
79- t 98'- 7 159 49 76-A 71
V
8 10 >/: 14 V:
9
32 V: 37 V: 28 23
8 15 41 49' i
14 63
71 -
4
3 53 54 46' 1 37
43- '
3 10 V p 1-1-2
9
32': 45 28 23
3 15 41 49: ,
4
17 55
-,
4
10 53 54
6- J7
51 ;
3 10 V, 14 V: 9
32': 53 28 23
8 15 41 49-,a 4 19 63
7:" 4
10 53 54
61 37
5G
S 10'- b 14', 9
32',: 62 23 23
8 15
11
49-j 4
->->
63
t: ,
4
10 61 54
70 37
53
9 I2Vi 16'/: 10
39 V: 51 35 28 10 18 47'/; 57
6" 15 75: ;
7- ' 4
12 51 62
44
57'
9 12 ^ 16J/> 10
39 V: 59' 35 28
10 18 47 V; 57'/-
6*' 18 75'V
7: 4
12 61 6?
67"44
65:
9 W15: ^ 10 39-.66'35 28 10 18
57'.6" 20
1, 4
61
62
44
75
9 12: > 16: 10 391 74 35 23 10 18 47' -
6*' 24 75 '
-
4
12 61
6?
37- 44
30- .
24209
STANDARD AND OPTIONAL EQUIPMENT
ALL UNITS
1 ; ,-SS AS ECOCf ?Oilr'
2. ^-icrv ri!!ec SkidT.oeBasi
3. 3.s.s*" 'i i'tsuited
Smc<eoc\
-i. r -.rex Observation Port
5. 3 : *?:_oes --Rc'er Evoended--vit" So 'ne- Bleoes in Direct
3. 3os" i~i Rear Smokeccv v<t~ Pear 7e-: ;* Forced Draft Firing 7. Arao-a-ound Insuiatec Steei Jacket 3. .`v?s -; Plug Socket *enc" 9. :iui 3 eaner wt:-' H2nc'e 10. L.stec Siandarc and Se ected Got ona- -o.tpmeni--assembled
one -- o.nted 'eady A: ourne.* nsta z: ;n and :onnection to <*: = :-nd steam. (Ekcedtions: .terns 3' oced seoarately to ore.e-: sr.ioorg dam = ;e )
1. Rsief Door 2. Too Vent 3. Operating Limit Control 4. Safety Lim.t Control 5. Control Wir ng Harness 6. Instantaneous or Tank Type Hot W-:** 3c s 7. Fiue Gas Temperature Gauge 8. Burner Mounting Plate--adaotad e to most o-rners. 3lank o ate
.v.th retaining ring for retractor/ to t ooue* :;enr; 9. cactory Burner Mounting
1. No "r" .:w Wate* Cut-cf' 2. Sa'st a.ve 3. lorno:."0 Steam and '.aouum 3-uge c. '.ate* Icuge anc Glass
STEAM UNITS
1. Combination Low Water Cut-Of'* =.*.o :,,r: Z;nt;oi 2. Combmat on .'/ate* reece*. '.ov .'.St-' 3_'.-:** ano A ?rm S.. 3. Seoond Lo v water Cut-off 4. Surface Bic.v-orf
--
1. No. _:w v/ater Cut-c:: 2. Pei-?' '/awe 3. 3orr,o --tton Altitude Gauge and Thermometer
HOT WATER UNITS
1. Combine; cn Wate* Feed?'
its - 3_- :* arc A ?rm 3 *: -
specifications
The contractor shall furnish and install .. Model No. . , Square-Heat Boiler Umt'Si for toil , teas', (combination gas-oil) firing. The units shall be three-pass compact firebox design with arched upright crown sheet and two passes of firetubes, and constructed in accord ance with the ASME Code for ; 15 lbs. steam, (30 lbs. water'.
Unitis' shall have not less than .. total square feet ot waterside heating surface including
a minimum ol .
square feet ot primary or direct heating surface.
Unit 's' shall contain not less than........... cubic feet of furnace volume and shat! have a gross output rating of not less than ___ MBh. Heat release shall not exceed 58,000 Btu per cubic foot of furnace volume.
Normal water line of unit's, shall not exceed .. inches. A pyrex observation port shall be provided at the rear of the firebox. Front flue access cover, with refractory securely keyed in place and of a size permitting easy access to all fire tubes, shall be mounted on a gas-tight, in sulated front smokebox. Gas-tight rear smokebox shall be provided with a (ream (top' outlet.
Unit s; shall be provided with a steel jacket with glass or mineral fiber insulation and smooth enamel finish. All tubes shall be set with a roller expander at each end. No welding of tubes to the tube sheets nor use of baffling to provide the second or third pass will be permitted. Spinner blades shall be provided m the first pass of lubes.
UnitiSi shall be assembled with trim, insulated steel jacket, and refractory filled skid type base installed at the factory ready lor field mounting of the fuel burning equipment specified below.
Note Specify tuel burning equipment according to burner manufacturer's recommen-
daticns
d etai IS --burner opening
dimensions-inches
Unit IP.'.- IF SR'- 2r -'A? Hr
ab >C 15 30 ;
-!\ \T ;.n O; 3
dlr '-, ViE \~
24210
STANDARD AND OPTIONAL EQUIPMENT
: "r":
zz:.:~*
; - 5 *:
ALL UNITS
1 ; .-ss AS.' CoZi 2 CM It' 2. v fitiec. Skid T.-pe 3asi 3. 3*.s-~ g *t. !^SJ-a:ed Frp-it Smc'xsocx 4. *;' ? rex Observation ?du 5. 3' r *e:-oes--npiter \onaea -- -vt' Sc ~?.r 3Iices in Direct
5. 3.*s-7 j"i Rear Smokeccs -vn~ Rear V*r: Fcr:ec Orart firing 7. Ar*c--*cund insuiatec 5:eei Jacket 3. .v = 5':_: Plug Socket :.'nc~ 9. fiue 3 eaner .vi;- Hanc'e .0. ;s:e: Standarc and Se ected Ocf.ona- c.ipmem--assembled
enc -rented 'esdy :cr ourner nsts e: :n end connection to v*:e* ;-nd steam. (Exceptions: -.terns S' opeJ seoarately to ore.e*: smppi-g damage.)
1. Reiief Door 2. Too Vent 3. Operating L>mit Control 4. Safety Lim.t Contrci 5. Control Wr ng Harness 6. Instantaneous or Tank Type Hot Vs:*.- 3c s 7. Fiue Gas Temperature Gauge 8- Burner Mounting Plate--aaactab.s :c mcs: c-rners Stank c = -.i
v.th retaining ring for 'eiractcr/ :c coile* ccem-.g 9. Factory Berner Mounting
1. No '5* ,:w '.Vate* Cut e:* 2. Saie* . >.ve 3. Zzrrz:.~a Steam and Vacuum Gauge
4. .`.'a-.5' 3-jge anc Glass
STEAM UNITS
1. Combination Low V/ater Cut-Off i~z :.r: 3;n:rci
2. Ccmbinat on V/ate* reeoe'. L: <
3 a no A arm 5 . : -
3. Second Le v water Cj;-on
4. Surface olc.v-orf
1. No
-cw Water Cut-cr:
2. Rehe- Vaive
3. 3omc.*'ition Altitude Gauge and Thermcmeter
HOT WATER UNITS
1. Ccmbinarcn Water Feace' uc.-. -: = 3_--;" -re A arm S.-
specifications
The contractor shall furnish and install.......... Model No. ...Square-Heat Boiler Unit-si lor toil , -gasi, (combination gas-oil > tiring. The units shall be three-pass compact firebox design with arched upright crown sheet and two passes of flretubes, and constructed in accord ance with the ASMS Code for ,15 lbs. steam. (30 lbs. water-.
Unit;s i shall have not less than . .. .total square feet of waterside healing surface including
a minimum of
. square feet of primary or direct healing surface.
Unit's' shall contain not less (han............cubic feet of furnace volume and shall have a gross output rating of not less than ........ MBh. Heat release shall not exceed 58,000 Btu per cubic foot of furnace volume.
Normal water line of uniKs, shall not exceed
. inches. A pyrex observation port shall be
provided at the rear of the firebox. Front flue access cover, with refractory securely keyed in
place and of a site permitting easy access to all Tire tubes, shall be mounted on a gas-light, in-
sulated front smokebox. Gas-tight rear smokebox shall be provided with a frean (lop! outlet.
Unit s: shall be provided with a steel jacket with glass or mineral fiber insulation and smooth enamel finish. All lubes shall be set with a roller expander al each end. No welding of tubes to the tube sheets nor use of baffling to provide the second or third pass will be permitted. Spinner blades shall be provided in the first pass of tubes.
Unit I s - shall be assembled with trim, insulated steel jacket, and refractory filled skid type base installed al the factory ready lor field mounting of the luel burning equipment specified below.
Note Specify fuel burning equipment according lo burner manufacturer's recommen dations
d etai I S --burner opening
dimensions-inches
Unit
ab
3R1 :f
20 -
SR? ?F
25
jRMjF - 30 :
\1 7 S a \ > ; c k p^qolC'. 0: ? ' \~M{ \T
24211