Document 93aaMX4q10Y4wjpv6ZmwM3OYL

Download
KINDER / MORGAN (KM) / Document 7 - Attachment 1 El Paso Natural Gas (EPNG) Greenfield Pipeline Expansion April 4, 2025 Sierra Club v. Dept of Energy, 4:25-cv-5027 SC_EVERSPLIT0021064 Irreplaceable Infrastructure Portfolio KINDE -/ ORGAN RM NATURAL GAS Largest U.S. Natural Gas Transmission Network 65% -66.000 miles of natural gas pipelines moving -40% of U.S. natural gas production Interest in over 700 bcf of working storage capacity, H5% of U.S capacity REFINED PRODUCTS (26%d) Largest U.S. Independent Refined Products Transporter & Terminal Operator Transport -1.7 mmbbld of refined product volumes -9,500 miles of refined products & crude pipelines 139 liquids & bulk terminals; 16 Jones Act vessels -- 135 mmbbl of total liquids storage capacity Delivering Energy. Improving Lives. Double H TCGT CP Gainey Wove A EPNG A Pacific Sierritai A NGPL NGPL Utopia- A TGP Stagecoach TGP i6A AA A . FEP Elba Express A ELC CO2 9% One of the Lamest CO-. Transporters in the U.S. -- -1,500 miles of CO2 pipelines with transport capacity of -1.5 bcfd - Produce and transport CO2 for enhanced oil recovery C4tttlieec,- BUSINESS MIX Growing Energy Transition Portfolio RNG production capacity of 6.4 bcf(b) GCX NET MX Ty1.4 LNG V Cypress KMCC/ Double Eagle NATURAL GAS -- Pipelines Storage Processing e LNG Facilities REFINED PRODUCTS -- PipeInes l enntnais 16 Jones Ad I ankers CO, -- P,pelines I CO, Source halos b. OA Ficlos RNG Plants Omer RNG Facilittes FGT CEPL Note: Volumes per 2025 budget. Business mix based on 2025 budgeted Total Adjusted Segment EBDA, which is a non-GAAP financial measure. See Non-GAAP Financial Measures & Reconciliations. 2 a) Refined Products includes 13% from our Products Segment and 13% from our Terminals Segment. b) Annual capacity at KMI share expected O1 2025. Autumn Hills RNG facility in late stages of commissioning. Sierra Club v. Dept of Energy, 4:25-cv-5027 SC_EVERSPLIT0021065 El Paso Natural Gas Company, L.L.C. a Kinder Morgan Company Q Compressor Stations Q Major Cities Rockies KINDERIMORGAN Rockies _ _ _r I SI AN-'1UAN- ANADA,FIK0 ASIN BASIN North Mainlines (4 mainlines) Albuquerque, NM California ..... Tucson, AN BASIN AZ WeSt.Efl d Paths ". East End Paths ' 10,200 miles (16,415 km) of pipe with west flow of - 4.85 Bcf/d Significant operational flexibility for reliable service (numerous parallel pipelines and 75 certificated compressor stations) Existing asset footprint provides cost effective expansion opportunities; ability to phase-in facility upgrades as needed Federally regulated pipeline system: transparency and standard business protocols Multiple delivery options into Mexico market Significant US market connectivity with access to El Paso, Albuquerque, Tucson, Phoenix, Las Vegas and California Direct access to natural gas storage (Washington Ranch, Keystone Gas Storage and Grama Ridge) Over 1,000 receipt and delivery points, including numerous interconnects with other intrastate and interstate pipelines Sierra Club v. Dept of Energy, 4:25-cv-5027 SC_EVERSPLIT0021066 Recent KM Interstate Expansions - Desert Southwest KINDER;MORGAN Section 7c Projects: Sierrita Pipeline -- 2014, EPNG South Mainline Expansion - 2020*, Sierrita Expansion -- 2020 EPNG Prior Notice Projects: Permian North -- 2018, Northern Delaware Basin -- 2020, Carlsbad South -- 2021, Vail Enhancement -- 2022* Line 1110 Loop Project -- 2024*, Maricopa Expansion -- Pending FERC Approval EPNG Blanket Certificate Projects: -800,000 Dth/day of Permian Intra-Basin Expansions 2018 - 2021 * Highlighted EPNG South Mainline (SML) Projects - 318,000 Dth/d Incremental West-end Deliveries, including Arizona NML Albuquerque 0 ` \... 1E1:-1renberg ERMIAN Sierrita PL SasabeQ Vail Enhancements (2022 / $23 million) Vail Station Cooling and Piping Modifications FERC Approval (Prior Notice) - June 2021 Incremental capacity -- 94,500 Dth/d South Mainline Expansion (2020 / $122 million) 17-miles, 30" pipeline loop, 2 compressors / 26,440 HP FERC Approval (Section 7c) - November 2019 Incremental capacity -- 203,546 Dth/d Waha Line 1110 Loop Project (2024/ $10 million) 2-mile / 30" pipeline loop FERC Approval (Prior Notice) -- July 2024 Incremental capacity - 20,021 Dth/d Sierra Club v. Dept of Energy, 4:25-cv-5027 SC_EVERSPLIT0021067 Recent EPNG Expansion Projects (b) (4) KINDER-I/MORGAN Sierra Club v. Dept of Energy, 4:25-cv-5027 SC_EVERSPLIT0021068 EPNG Greenfield Pipeline Expansion Opportunity Background (b) (4) KINDER- MORGAN Confidential -- Highly Sensitive Information Sierra Club v. Dept of Energy, 4:25-cv-5027 SC_EVERSPLIT0021069 Project Conceptual Map (b) (4) KINDER- MORGAN Sierra Club v. Dept of Energy, 4:25-cv-5027 SC_EVERSPLIT0021070