El Paso Natural Gas (EPNG) Greenfield Pipeline Expansion
April 4, 2025
Sierra Club v. Dept of Energy, 4:25-cv-5027
SC_EVERSPLIT0021064
Irreplaceable Infrastructure Portfolio
KINDE -/ ORGAN RM
NATURAL GAS
Largest U.S. Natural Gas Transmission Network
65%
-66.000 miles of natural gas pipelines moving -40% of U.S. natural gas production
Interest in over 700 bcf of working storage capacity, H5% of U.S capacity
REFINED PRODUCTS
(26%d)
Largest U.S. Independent Refined Products Transporter & Terminal Operator
Transport -1.7 mmbbld of refined product volumes
-9,500 miles of refined products & crude pipelines
139 liquids & bulk terminals; 16 Jones Act vessels
-- 135 mmbbl of total liquids storage capacity
Delivering Energy. Improving Lives.
Double H
TCGT
CP
Gainey Wove A
EPNG
A Pacific
Sierritai
A NGPL
NGPL
Utopia- A TGP
Stagecoach
TGP
i6A AA
A
.
FEP
Elba Express A
ELC
CO2
9%
One of the Lamest CO-. Transporters in the U.S.
-- -1,500 miles of CO2 pipelines with transport capacity of -1.5 bcfd
- Produce and transport CO2 for enhanced oil recovery
C4tttlieec,-
BUSINESS MIX
Growing Energy Transition Portfolio
RNG production capacity of 6.4 bcf(b)
GCX NET MX
Ty1.4
LNG
V
Cypress
KMCC/ Double Eagle
NATURAL GAS
-- Pipelines Storage Processing
e LNG Facilities
REFINED PRODUCTS -- PipeInes l enntnais
16 Jones Ad I ankers
CO,
-- P,pelines I CO, Source halos
b. OA Ficlos
RNG Plants Omer RNG Facilittes
FGT CEPL
Note: Volumes per 2025 budget. Business mix based on 2025 budgeted Total Adjusted Segment EBDA, which is a non-GAAP financial measure. See Non-GAAP Financial Measures & Reconciliations.
2 a) Refined Products includes 13% from our Products Segment and 13% from our Terminals Segment.
b) Annual capacity at KMI share expected O1 2025. Autumn Hills RNG facility in late stages of commissioning.
Sierra Club v. Dept of Energy, 4:25-cv-5027
SC_EVERSPLIT0021065
El Paso Natural Gas Company, L.L.C.
a Kinder Morgan Company
Q Compressor Stations Q Major Cities
Rockies
KINDERIMORGAN
Rockies
_ _ _r
I
SI AN-'1UAN-
ANADA,FIK0
ASIN
BASIN
North Mainlines (4 mainlines)
Albuquerque, NM
California .....
Tucson,
AN BASIN
AZ
WeSt.Efl d
Paths
".
East End
Paths
'
10,200 miles (16,415 km) of pipe with west flow of - 4.85 Bcf/d Significant operational flexibility for reliable service (numerous
parallel pipelines and 75 certificated compressor stations) Existing asset footprint provides cost effective expansion
opportunities; ability to phase-in facility upgrades as needed Federally regulated pipeline system: transparency and standard
business protocols
Multiple delivery options into Mexico market Significant US market connectivity with access to El Paso,
Albuquerque, Tucson, Phoenix, Las Vegas and California Direct access to natural gas storage (Washington Ranch,
Keystone Gas Storage and Grama Ridge) Over 1,000 receipt and delivery points, including numerous
interconnects with other intrastate and interstate pipelines
Sierra Club v. Dept of Energy, 4:25-cv-5027
SC_EVERSPLIT0021066
Recent KM Interstate Expansions - Desert Southwest KINDER;MORGAN
Section 7c Projects: Sierrita Pipeline -- 2014, EPNG South Mainline Expansion - 2020*, Sierrita Expansion -- 2020 EPNG Prior Notice Projects: Permian North -- 2018, Northern Delaware Basin -- 2020, Carlsbad South -- 2021, Vail Enhancement -- 2022*
Line 1110 Loop Project -- 2024*, Maricopa Expansion -- Pending FERC Approval EPNG Blanket Certificate Projects: -800,000 Dth/day of Permian Intra-Basin Expansions 2018 - 2021
* Highlighted EPNG South Mainline (SML) Projects - 318,000 Dth/d Incremental West-end Deliveries, including Arizona
NML
Albuquerque 0
` \... 1E1:-1renberg
ERMIAN
Sierrita PL
SasabeQ
Vail Enhancements (2022 / $23 million) Vail Station Cooling and Piping Modifications FERC Approval (Prior Notice) - June 2021 Incremental capacity -- 94,500 Dth/d
South Mainline Expansion (2020 / $122 million) 17-miles, 30" pipeline loop, 2 compressors / 26,440 HP FERC Approval (Section 7c) - November 2019 Incremental capacity -- 203,546 Dth/d
Waha
Line 1110 Loop Project (2024/ $10 million)
2-mile / 30" pipeline loop FERC Approval (Prior Notice) -- July 2024 Incremental capacity - 20,021 Dth/d
Sierra Club v. Dept of Energy, 4:25-cv-5027
SC_EVERSPLIT0021067
Recent EPNG Expansion Projects
(b) (4)
KINDER-I/MORGAN
Sierra Club v. Dept of Energy, 4:25-cv-5027
SC_EVERSPLIT0021068
EPNG Greenfield Pipeline Expansion Opportunity
Background
(b)
(4)
KINDER- MORGAN
Confidential -- Highly Sensitive Information
Sierra Club v. Dept of Energy, 4:25-cv-5027
SC_EVERSPLIT0021069
Project Conceptual Map
(b) (4)
KINDER- MORGAN
Sierra Club v. Dept of Energy, 4:25-cv-5027
SC_EVERSPLIT0021070