T. G. Grumbles January 3, 1990
Xft
FINAL OSHA EXCAVATION STANDARD
MJH: AJsTrF
VISTA
Attached is a copy of the final OSHA Excavation standard. I'm not sure this was sent out before.
T. G. Grumbles
dlj .225
Attachment
VVV 000010786
Federal Register / Vol. 54. No. 209 / Tuesday. October 31. 1989 / Rules and Regulations 433?)
PART 1926--(AMENDED]
Subpart M--[Amended]
1. By revising the authority citation for subpart M of part 1926 to read as follows:
Authority: Sac. 107, Contract WoL-k Hours ana Safety Standards Act (Construction Safety Act) (40 U.S.C. 333): Secs. 4, a, 8, Occupational Safety and Health Act of 1970 [29 U.S.C. 633, 635, 657); Secretary of Labor's Order No. 12-71 (36 FR 8754), 8-76 (41 FR 25059), or 9-83 (48 FR 35738). as applicable, and 29 CFR part 1911.
2. By revising subpart P of part 1929 to read as follows:
Subpart P--Excavations
Sec. 1928.650 Scope, application, and definitions
applicable to this subpart 1928.651 General requirements. 1928.652 Requirements for protective
systems.
Appendix A lo Subpart P--Soil Classification
Appendix 8 to Subpart P--Sloping and Benching
Appendix C to Subpart P--Timber Shoring for Trenches
Appendix D to Subpart F--Aluminum Hydraulic Shoring for Trenches
Appendix E lo Subpart P--Alternatives to Timber Shoring
Appendix F to Subpart P--Selection of Protective Systems
Subpart P--Excavations
Authority: Sec. 107, Contract Worker Hours and Safety Standards Act (Construction Safety Act) (40 U.S.C. 333); Sees. 4. 6. 8. Occupational Safety and Health Act of 1970 (29 U.S.C. 653. 655. 657): Secretary of Labor's Order No. 12-71 (38 FR 8754). 8-76 (41 FR 25059), or 9-83 (48 FR 35730), as applicable, and 29 CFR part 1911.
1926.650 Scope, application, and definitions applicable to this subpart
(a) Scope and application. This subpart applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.
(b) Definitions applicable to this subpart
Accepted engineering practices means those requirements which are compatible with standards of practice required by a registered professional engineer.
Aluminum Hydraulic Shoring means a pre-engineered shoring system comprised of aluminum hydraulic cylinders (crossbraces} used in conjunction with vertical rails (uprights) or horizontal rails (waters). Such system is designed, specifically to support the
sidewalls of an excavation and prevent cave-ins.
Bell-bottom pierhole means a type of shaft or footing excavation, the bottom of which is made larger than the cross section above to form a belled shape.
Benching (Benching system) means a method of protecting employees from cave-ins by excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels.
Cave-in means the separation of a mass of soil or rock material from the side of an excavation, or the loss of soil from under a trench shield or support system, and its sudden movement into the excavation, either by falling or sliding, in sufficient quantity so that it could entrap, bury, or otherwise injure and immobilize a person.
Competent person means one who is capable of identifying existing and predictable hazards in the surroundings, or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.
Cross braces mean the horizontal members of a shoring system installed perpendicular to the sides of the excavation, the ends of which bear against either uprights or wales.
Excavation means any man-made cut, cavity, trench, or depression in an earth surface, formed by earth removal.
Faces or sides means the vertical or inclined earth surfaces formed as a result of excavation work.
Failure means the breakage, displacement, or permanent deformation of a structural member or connection so as to reduce its structural integrity and its supportive capabilities.
Hazardous atmosphere means an atmosphere which by reason of being explosive, flammable, poisonous, corrosive, oxidizing, irritating, oxygen deficient toxic, or otherwise harmful, may cause death, illness, or injury.
Kickout means the accidental release or failure of a cross brace.
Protective system means a method of protecting employees from cave-ins, from material that could fall or roll from an excavation face or into an exeavation. or from the collapse of adjacent structures. Protective systems include support systems, sloping and benching systems, shield systems, and other systems that provide the necessary protection.
Ramp means an inclined walking or working surface that is used to gain access to one point from another, and is
constructed from earth or from
structural materials such as steel or wood.
Registered Professional Engineer means a person who is registered as a professional engineer in the state whe"9 the work is to be performed. However, a professional engineer, registered in any state is deemed to be a "registered professional engineer" within the meaning of this standard when approving designs for "manufactured protective systems" or "tabulated data" to be used in interstate commerce.
Sheeting means the members of a shoring system that retain the earth in position and in turn are supported by other members of the shoring system.
Shield (Shield system) means a structure that is able to withstand the forces imposed on it by a cave-in and thereby protect employees within the structure. Shields can be permanent structures or can be designed to be portable and moved along as work progresses. Additionally, shields can be either premanufactured or job-built in accordance with 1926.652 (c)(3) or (c)(4). Shields used in trenches are usually referred to as "trench boxes" or "trench shields."
Shoring (Shoring system) means a structure such as a metal hydraulic, mechanical or timber shoring system that supports the sides of an excavation and which is designed to prevent cave rns.
Sides. See "Faces."
Sloping (Sloping system) means a method of protecting employees from cave-ins by excavating to form sides of an excavation that are inclined away from the excavation so as to prevent cave-ins. The angle of incline required to prevent a cave-in varies with differences in such factors as the soil type, environmental conditions of exposure, and application of surcharge
loads.
Stable rock means natural solid mineral material that can be excavated with vertical sides and will remain intact whiie exposed. Unstable rock is considered to be stable when the rock material on the side or sides of the excavation is secured against caving-in or movement by rock bolts or by another protective system that ha9 been designed by a registered professional engineer.
Structural ramp means a ramp built of steel or wood, usually used for vehicle access. Ramps made of soil or rack are not considered structural ramps.
Support system means a structure such as underpinning, bracing, or shoring, which provides support to an adjacent structure, underground
oooo^87
45860 Federal Register f Vol. 54, No. 209 / Tuesday, October 31, 1989 / Rules and Regulations
installation, or the sides of an excavation.
Tabulated data means tables and
charts approved by a registered professional engineer and used to design and construct a protective system.
Trench (Trench excavation) means a narrow excavation (in relation to its length) made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet (4.6 m). If forms or other structures are installed or constructed in an excavation so as to reduce the dimension measured from the forms or structure to the side of the excavation to 15 feet (4.6 m) or less (measured at the bottom of the excavation), the excavation is also considered to be a trench.
Trench box. See "Shield." Trench shield. See "Shield." Uprights means the vertical members of a trench shoring system placed in
contact with the earth and usually positioned so that individual members do not contact each other. Uprights placed so that individual members are closely spaced, in contact with or interconnected to each other, are often called "sheeting."
Wales means horizontal members of a shoring system placed parallel to the excavation face whose sides bear against the vertical members of the shoring system or earth.
1928.651 General requirements.
(a) Surface encumbrances. All surface encumbrances that are located so as to create a hazard to employees shall be removed or supported, as necessary, to safeguard employees.
(b) Underground installations. (1) The estimated location of utility installations, such as sewer, telephone, fuel, electric, water lines, or any other underground installations that reasonably may be expected to be encountered during excavation work, shall be determined prior to opening an excavation.
(2) Utility companies or owners shall
be contacted within established or customary local response times, advised of the proposed work, and asked to establish the location of the utility
underground installations prior to the start of actual excavation. When utility companies or owners cannot respond to a request to locate underground utility installations within 24 hours (unless a longer period is required by state or local law), or cannot establish the exact location of these installations, the employer may proceed, provided the employer does so with caution, and provided detection equipment or other
acceptable means to locate utility
installations are used. (3) When excavation operations
approach the estimated location of underground installations, the exact location of the installations shall be
determined by safe and acceptable means.
(4) While the excavation is open, underground installations shall be protected, supported or removed as necessary to safeguard employees.
(c) Access and egress--(1) Structural ramps. (i) Structural ramps that are used solely by employees as a means of access or egress from excavations shall be designed by a competent person. Structural ramps used for access or egress of equipment shall be designed by a competent person qualified in structural design, and shall be constructed in accordance 'with the
design. (ii) Ramps and runways constructed
of two or more structural members shall
have the structural members connected together to prevent displacement
(iii) Structural members used for
ramps and runways shall be of uniform thickness.
(iv) Cleats or other appropriate mpim used to connect runway structural members shall be attached to the bottom of the runway or shall be attached in a manner to prevent tripping.
(v) Structural ramps used in lieu of
steps shall be provided with cleats or other surface treatments on the top surface to prevent slipping.
(2) Means of egress from trench excavations. A stairway, ladder, ramp or other safe means of egress shall be
located in trench excavations that are 4 feet (1.22 m) or more in depth so as to require no more than 25 feet (7.62 m) of lateral travel for employees.
(d) Exposure to vehicular traffic. Employees exposed to public vehicular traffic shall be provided with, and shall wear, warning vests or other suitable garments marked with or made of reflectorized or high-visibility material.
(e) Exposure to falling loads. No
employee shall be permitted underneath loads handled by lifting or digging equipment. Employees shall be required to stand away from any vehicle being loaded or unloaded to avoid being struck by any spillage or falling materials. Operators may remain in the cabs of vehicles being loaded or
unloaded when the vehicles arc equipped, in accordance with 1926.601(b)(6), to provide adequate protection for the operator during loading end unloading operations.
(f) Warning system for mobile equipment When mobile equipment is operated adjacent to an excavation, or
when such equipment is required to approach the edge of an excavation, and
the operator does not have a clear and direct view of the edge of the excavation, a warning system shall be utilized such as barricades, hand or mechanical signals, or stop logs. If possible, the grade should be away from the excavation.
(g) Hazardous atmospheres--(l) Testing and controls. In addition to the requirements set forth in subparts 0 and E of this part (29 CFR 1928.50-1926.107) to prevent exposure to harmful levels of atmospheric contaminants and to assure
acceptable atmospheric conditions, the following requirements shall apply:
(1) Where oxygen deficiency (atmospheres containing less than 19.5 percent oxygen) or a hazardous atmosphere exists or could reasonably
be expected to exist, such as in excavations in landfill areas or excavations in areas where hazardous substances are stored nearby, the
atmospheres in the excavation shall be tested before employees enter excavations greater than 4 feet (1.22 m)
in depth. (ii) Adequate precautions shall be
taken to prevent employee exposure to atmospheres containing less than 19.5 percent oxygen and other hazardous atmospheres. These precautions include providing proper respiratory protection or ventilation in accordance with
subparts D and E of this part respectively.
(iii) Adequate precaution shall be taken such as providing ventilation, to prevent employee exposure to an atmosphere containing a concentration of a flammable gas in excess of 20 percent of the lower flammable limit of
the gas(iv) When controls are used that are
intended to reduce the level of atmospheric contaminants to acceptable levels, testing shall be conducted as often as necessary to ensure that the atmosphere remains safe.
(2) Emergency rescue equipment (i) Emergency rescue equipment, such as breathing apparatus, a safety harness and line, or a basket stretcher, shall be readily available where hazardous atmospheric conditions exist or may reasonably be expected to develop during work in an excavation. This equipment shall be attended when in use.
(ii) Employees entering bell-bottom pier holes, or other similar deep and confined footing excavations, shall wear
a harness with a life-line securely attached to it. The lifeline shall be separate from any line used to handle materials, and shall be individually
VVV 000010789
%
- jsa wr
*. M
,;,k,
r3l2 -r>:,
Federal Register / Vol. 54, No. 209 / Tuesday, October 31, 1989 / Rules and Regulations 45961
attended at all times while the employee wearing the lifeline is in the excavation.
(h) Protection from hazards associated with water accumulation, (l) Employees shall not work in
excavations in which there is accumulated water, or in excavations in which water is accumulating, unless adequate precautions have been taken to protect employees against the hazards posed by water accumulation. The precautions necessary to protect employees adequately vary with each situation, but could include special support or shield systems to protect from cave-ins, water removal to control the level of accumulating water, or use of a safety harness and lifeline.
(2) If water is controlled or prevented from accumulating by the use of water removal equipment, the water removal equipment and operations shall be
monitored by a competent person to ensure proper operation.
(3J If excavation work interrupts the natural drainage of surface water (such as streams!, diversion ditches, dikes, or other suitable means shall be used to prevent surface water from entering the excavation and to provide adequate drainage of the area adjacent to the excavation. Excavations subject to runoff from heavy rains will require an inspection by a competent person and compliance with paragraphs (h)(1) and (h)(2) of this section.
(i) Stability ofadjacent structures. (1) Where the stability of adjoining buildings, walls, or other structures is endangered by excavation operations, support systems such as shoring, bracing, or underpinning shall be provided to ensure the stability of such structures for the protection of employees.
(2) Excavation below the level of the base or footing of any foundation or retaining wall that could be reasonably expected to pose a hazard to employees shall not be permitted except when:
(i) A support system, such as underpinning, is provided to ensure the safety of employees and the stability of the structure; or
(ii) The excavation is in stable rock; or (iii) A registered professional engineer has approved the determination that the
structure is sufEcently removed from the excavation so as to be unaffected by the excavation activity: or
(iv) A registered professional engineer has approved the determination that such excavation work will not pose a hazard to employees.
(3) Sidewalks, pavements, and appurtenant structure shall not be undermined unless a support system or another method of protection is
provided to protect employees from the possible collapse of such structures.
0) Protection ofemployees from loose
rock or soil. (1) Adequate protection shall be provided to protect employees from loose rock or soil that could pose a hazard by falling or rolling from an excavation face. Such protection shall consist of scaling to remove loose material: installation of protective barricades at intervals as necessary on the face to stop and contain falling material: or other means that provide equivalent protection.
(2) Employees shall be protected from excavated or other materials or equipment that could pose a hazard by falling or rolling into excavations. Protection shall be provided by placing and keeping such materials or equipment at least 2 feet (.61 m) from the edge of excavations, or by the use of retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations, or by a combination of both if necessary.
(k) Inspections. (1) Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift Inspections shall also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.
(2) Where the competent person finds
evidence of a situation that could result in a possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees shall be removed from the hazardous area until the necessary precautions have been taken to ensure their safety.
(l) Fallprotection. (1) Where employees or equipment are required or permitted to cross over excavations, walkways or bridges with standard guardrails shall be provided.
(2) Adequate barrier physical protection shall be provided at ail remotely located excavations. All wells, pits, shafts, etc., shall be barricaded or covered. Upon completion of exploration and similar operations,
temporary wells, pits, shafts, etc., shall be backfilled.
5 1926.652 Requirement* for protective systems.
(a) Protection ofemployees in excavations. (1) Each employee in an excavation shall be protected from caveins by an adequate protective system designed in accordance with paragraph (b) or (c) of this section except when:
(1) Excavations are made entirely in stable rock; or
(ii) Excavations are less than 5 feet (1.52m) in depth and examination of the ground by a competent person provides no indication of a potential cave-in.
(2] Protective systems shall have the capacity to resist without failure all loads that are intended or could reasonably be expected to be applied or transmitted to the system.
(b) Design of sloping and benching systems. The slopes and configurations of sloping and benching systems shall be selected and constructed by the employer or his designee and shall be in accordance with the requirements of paragraph (b)(1); or. in the alternative, paragraph (b)(2); or, in the alternative, paragraph (b)(3), or, is the alternative, paragraph (b)(4), as follows:
(1) Option (1}--Allowable configurations and slopes, (i) Excavations shall be sloped at an angle not steeper than one and-one-baif horizontal to one vertical (34 degrees measured from the horizontal), unless the employer uses one of the other options listed below.
(ii) Slopes specified in paragraph (b)(l)(i] of this section, shall be excavated to form configurations that are in accordance with the slopes shown for Type C soil in Appendix B to this subpart.
(2) Option (2}--Determination of slopes and configurations using Appendices A and 8. Maximum allowable slopes, and allowable configurations for sloping and benching systems, shall be determined in accordance with the conditions and requirements set forth in appendices A and B to this subpart
(3) Option (3}--Designs using other tabulated data, (i) Designs of sloping or benching systems shall be selected from and be in accordance with tabulated data, such as tables and charts.
(ii) The tabulated data shall be Ln written form and shall include ell of the following:
(A) Identification of the parameters that affect the selection of a sloping or
benching system drawn from such data: (B) Identification of the limits of use of
the data, to include the magnitude and
configuration of slopes determined to be safe;
VVV 000010789
45962 Federal Register / Vol. 54, No. 209 / Tuesday, October 31. 1989 / Rules and Regulations
(C) Explanatory information as may be necessary to aid the user in making a correct selection of a protective system
from the data. (iii) At least one copy of the tabulated
data which identifies the registered
professional engineer who approved the data, shall be maintained at the jobsite during construction of the protective system. After that time the data may be
stored off the jobsite, but a copy of the data shall be made available to the Secretary upon request
(4) Option (4)---Design by a registered professional engineer, (i) Sloping and benching systems not utilizing Option (1) or Option (2j or Option (3) under paragraph (b) of this section shall be approved by a registered professional engineer.
(ii) Designs shall be in written form and shall include at least the following;
(A) The magnitude of the slopes that were determined to be safe for the particular project
(B) The configurations that were
determined to be safe for the particular project; and
(C) The identity of the registered professional engineer approving the
design. (iii) At least one copy of the design .
shall be maintained at the jobsite while the slope is being constructed. After that time the design need not be at the jobsite, but a copy shall be made
available to the Secretary upon request. (c) Design of support systems, shield
systems, and otherprotective systems. Designs of support systems shield systems, and other protective systems shall be selected and constructed by the employer or his designee and shall be in accordance with the requirements of paragraph (c)(1); or, in the alternative, paragraph (c)(2); or, in the alternative. . paragraph (c)(3); or. in the alternative, paragraph (c)(4) as follows:
(1) Option (ij--Designs using appendices A, C and D. Designs for timber shoring in trenches shall be determined in accordance with the conditions and requirements set forth in appendices A and C to this subpart. Designs for aluminum hydraulic shoring shall be in accordance with paragraph (c)(2) of this section, but if manufacturer's tabulated data cannot be utilized, designs shall be in accordance with appendix D.
(2) Option (2}--Designs Using Manufacturer's Tabulated Data, (i) Design of support systems, shield systems, or other protective systems
that are drawn from manufacturer's tabulated data shall be in accordance with all specifications,
recommendations, and limitations issued or made by the manufacturer.
(ii) Deviation from the specifications, recommendations, and limitations issued or made by the manufacturer
shall only be allowed after the manufacturer issues specific written approval.
(iii) Manufacturer's specifications, recommendations, end limitations, and manufacturer's approval to deviate from the specifications, recommendations, and limitations shall be In written form at the jobsite during construction of the protective system. After that time this data may be stored off the jobsite, but a copy shall be made available to the Secretary upon request
(3) Option (3}--Designs using other tabulated data, (i) Designs of support systems, shield systems, or other protective systems shall be selected from and be in accordance with tabulated data, such as tables and charts.
(ii) The tabulated data shall be in written form and include all of the following:
(A) Identification of the parameters that affect the selection of a protective system drawn from 9uch data;
(B) Identification of the limits of use of the data;
(C) Explanatory information as may be necessary to aid the user in making a correct selection of a protective system from the data.
(iii) At least one copy of the tabulated
data, which identifies the registered professional engineer who approved the data, shall be maintained at the jobsite during construction of the protective system. After that time the data may be stored off the jobsite, but a copy of the data shall be made available to the Secretary upon request
(4) Option (4)--Design by a registered
professional engineer, (i) Support systems, shield systems, and other protective systems not utilizing'Option 1. Option 2 or Option 3, above, shall be approved by a registered professional engineer.
(ii) Designs shall be in written form and shall include the foilowing:
(A) A plan indicating the sizes, types, and configurations of the materials to be used in the protective system; and
(B) The identity of the registered professional engineer approving the design.
(iii) At least one copy of the design shall be maintained at the jobsite during construction of the protective system. After that time, the design may be stored off the jobsite, but a copy of the design shall be made available to the Secretary upon request.
(d) Materials and equipment. (1) Materials and equipment used for protective systems shall be free from
damage or defects that might impair their proper function.
(2) Manufactured materials and equipment used for protective systems shall be used and maintained in a
manner that is consistent with the recommendations of the manufacturer, and in a manner that will prevent employee exposure to hazards.
(3) When material or equipment that is used for protective systems is damaged, a competent person shall examine the material or equipment and evaluate its suitability for continued use. If the competent person cannot assure the material or equipment is able to support the intended loads or is otherwise suitable for safe use. then such material or equipment shall be removed from service, and shall be evaluated and approved by a registered professional engineer before being
returned to service.
(e) Installation and removal of support--(1) General, (i) Members of support systems shall be securely connected together to prevent sliding, falling, kickouts, or other predictable failure.
(ii) Support systems shall be installed and removed in a manner that protects employees from cave-ins, structural collapses, or from being struck by members of the support system.
(iii) Individual members of support systems shall not be subjected to loads exceeding those which those members were designed to withstand.
(iv) Before temporary removal of individual members begins, additional precautions shall be taken to ensure the safety of employees, such as installing other structural members to carry the loads imposed on the support system-
(v) Removal shall begin at. and progress from, the bottom of the excavation. Members shall be released slowly so as to note any indication of possible failure of the remaining members of the structure or possible cave-in of the sides of the excavation.
(vi) Backfilling shall progress together with the removal of support systems from excavations.
(2) Additional requirements for support systems for trench excavations. (i) Excavation of material to a level no greater than 2 feet (.61 m) below the bottom of the members of a support system shall be permitted, but only if the system is designed to resist the forces calculated for the full depth of the trench, and there are no indications while the trench is open of a possible loss of soil from behind or below the bottom of the support system.
VVV 000010790
* !*>;. *v:
Federal Register / Vol. 54, No. 209 / Tuesday, October 31, 1989 / Rules and Regulations 459S3
(ii) Installation of a support system shall be closely coordinated with the
excavation of trenches. (f) Sloping and benching systems.
Employees shall not be permitted to work on the faces of sloped or benched
Testing Materials (ASTM) Standards 0653-85 and 02488; The Unified Sods Classification
System, The U& Department of Agriculture (TJSDA) Textural Classification Scheme; and The National Bureau of Standards Report B3S-121.
Cementedsoil means a soil in which the
excavations at levels above other
particles are held together by a chemical
employees except when employees at
agent such as calcium carbonate, such that a
the lower levels are adequately
hand-size sample cannot be crushed into
protected from the hazard of falling,
rolling, or sliding material or equipment
(g) Shieidsystems--(l) General, (i)
Shield systems shall not be subjected to
loads exceeding those which the system
powder or individual soil particles by finger pressure.
Cohesive eoil means clay (fine grained soil), or soil with a high day content, which has cohesive strength. Cohesive soil does not
crumble, can be excavated with vertical
was designed to withstand.
sidealopea, and is plastic when moist
(ii) Shields shall be installed in a
Cohesive soil is hard to break up when dry.
manner to restrict lateral or other
and exhibits significant cohesion when
hazardous movement of the shield in the event of the application of sudden lateral loads.
(iii) Employees shall be protected from the hazard of cave-ins when entering or exiting the areas protected
submerged. Cohesive soils include clayey silt sandy day. silty clay, day and organic day.
Dry soil means soil that does not exhibit
visible signs of moisture content Fissured means a soil material that has a
tendency to break along definite planes of fracture with little resistance, or a material
by shields.
that exhibits open cracks, such as tension
(iv) Employees shall not be allowed in cracks, in an exposed surface.
shields when shields are being installed,
Cranuiarsoil means gravel, sand, or silt
removed, or moved vertically. (2) Additional requirementfor shieid
systems used in trench excavations.
Excavations of earth material to a level not greater than 2 feet (.81 tn) below the bottom of a shield shall be permitted,
(coarse grained soil) with little or no day content. Crsnular soil has no cohesive strength. Some moist granular soils exhibit apparent cohesion. Granular soil cannot be molded when moist and crumbles easily when dry.
Layered system means two or more
but only if the shield is designed to
distinctly different soil or rock types arranged
resist the forces calculated for the full
in layers. Micaceous seams or weakened
depth of the trench, and there are no
planes in rock or shale are considered
indications while the trench is open of a layered.
possible loss of soil from behind or below the bottom of the shield.
Moist soil means a condition in which a soil looks and feels damp. Moist cohesive soil
can easily be shaped into a ball and rolled
Appendix A to Subpart F
into small diameter threads before crumbling.
Sail Classification
Moist granular soil that contains some cohesive material will exhibit signs of
(a) Scope and appiicctioa--(1] Scope. This cohesion between partides.
appendix describes a method of classifying
Plastic means a property of a soil which
soil and rock deposits based oq site and
allows the soil to be deformed or molded
environmental conditions, and on the
without cracking, or appreciable volume
structure and composition of the earth
change.
deposits. The appendix contains definitions,
Saturated soil means a soil in which the
sets forth requirements, and describes *
voids are filled with water. Saturation does
acceptable visual and manual tests for use in not require flow. Saturation, or sear
classifying soils.
saturation, is necessary foT the proper use of
(2) Application. This appendix applies
instruments such as a pocket penetrometer or
when a sloping or benching system is ,
sheer vane.
designed In accordance with the
So// classification system means, for the
requirements set forth in i 1928.652(b)(2) as a purpose of this subpart, a method of
method of protection for employees from
categorizing soil and rock deposits in a
cave-ins. This appendix also applies when
hierarchy of Stable Rock. Type A. Type B.
timber shoring for excavations is designed as and Type G in decreasing order of stability.
a method of protection from cave-ins in
The categories are determined based on an
accordance with appendix C to subpart P of analysis of the properties and performance
part 1928, and when aluminum hydraulic
^characteristics of the deposits and the
shoring is designed in accordance with
environmental conditions of exposure.
appendix D. This Appendix also applies if
Stable rock means natural solid mineral
other protective systems are designed and
matter that can be excavated with vertical
selected for use from data prepared in
sides and remain intact while exposed.
accordance with the requirements set forth In
Submerged soil means soil which is
S 1928.652(c), and the use of the data is
underwater or is free seeping.
predicated os the use of the soil classification Type A means cohesive soils with an
aystem set forth in this appendix.
unconfined compressive strength of 1.5 (on
(b) Definitions. The definitions and
per square foot (tsf) (144 kPa) or greater.
examples given below are based on, in whole Examples of cohesive soils are: day,'silty
or in part, the following: American Society for clay, sandy clay, clay loam and, (n some
cases, silty day loam and sandy clay loam.
Cemented soils such as caliche and hardpan are also considered Type A. However, no soil is Type A ifc
(i) The soil is fissured: or (ii) The soil is subject to vibration from heavy traffic, pile driving, or similar effects; or (iii) The soil has been previously disturbed; or (fv) The soil is part of a sloped, layered system where the layers dip into the excavation on a slope of four horizontal to one vertical (4H:lV) or greater or (v) The material is subject to other factors
that would require it to be classified as a less stable material
Type B means: (i) Cohesive soil with an unconfined compressive strength greater than 0-5 tsf (48 kPa) but less than 1-5 tsf (144 kPa); or (ii) Granular cohesionless soils including: angular gravel (similar to crashed rock). silt,
silt loam, sandy loam and. in some cases, silty clay loam and sandy clay loam.
(iii) Previously disturbed sous except those which would otherwise be classed as Type C soil.
(iv) Soil that meets the uncoafined compressive strength or cementation requirements for Type A, but is fissured or subject to vibration; or
(v) Dry rock that is not stable: or (vi) Material that is part of a sloped, layered system where the layers dip into the excavation on a slope less steep than four horizontal to one vertical (4HflV), but cnly if the material would otherwise be classified as
Type B. Type C means: (1) Cohesive soil with an nnconfined
compressive strength of 0.5 taf (48 kPa) or
less; or (ii) Granular soils including gravel, sand,
and loamy S3nd; or (iii) Submerged soil or soil from which
water is freely seeping; or (iv) Submerged rock that is not stable, or (v) Material in a sloped, layered system
where the layers dip into the excavation or a slope of four horizontal to one vertical (4H:lV) o? steeper.
Uncor.fined compressive strength means the load per unit area at which a soil will fail in compression. It can be determined by laboratory testing, or estimated in the field using a pocket penetrometer, by thumb penetration tests, and other methods.
IVet soil means sail that contains significantly more moisture than moist soil, but in such a range of values that cohesive material will slump or begin to flow v/hen vibrated. Granular material that would exhibit cohesive properties when moist will lose those cohesive properties when wet.
(i;) Requirements--{1) Classification of sail ana rack deposits. Each soil end rock deposit shall be classified by a competent person as Stable Rock. Type A. Type B, or Type C in accordance with the definitions set forth in paragraph (b) of this appendix.
(2) Basis ofclassification. The classification of the deposits shall be made based on the results of at least one visual and at least one manual analysis. Such analyses
VVV 000010791
A.
45964 Federal Register / Vol. 54, No. 209 / Tuesday, October 31, 1989 / Rules and-Regulations
shall be conducted by a competent person using tests described in paragraph (d) below,
or in other recognized methods of soil
classification and testing such as those adopted by the America Society for Testing Materials, or the U.S. Department of
Agriculture textural classification system. (3) Visual and manual analyses. The visual
and manual analyses, such as those noted as being acceptable in paragraph (d) of this appendix, shall be designed and conducted to provide sufficient quantitative and qualitative information as may be necessary to identify properly the properties, factors, and conditions affecting the classification of the deposits.
(4) Layered systems. In s layered system,
the system shall be classified in accordance with its weakest layer. However, each layer may be classified individually where a more stable layer lies under a less stable layer.
(5) Reclassification. If, after classifying a deposit the properties, factors, or conditions affecting its classification change in any way.
the changes shall be evaluated by a
competent person. The deposit shall be reclassified as necessary to reflect the changed circumstances.
(d) Acceptable visual and manual tests.--
(11 Visual tests. Visual analysis is conducted to determine qualitative information regarding the excavation site in general the soil adjacent to the excavation, the soil
forming the sides of the open excavation, and the soil taken as samples from excavated material
(i) Observe samples of soil that are excavated and sod in the sides of the excavation. Estimate the range of particle sizes and the relative amounts of the particle
sizes. Soil that is primarily composed of fine* grained material is cohesive material. Soil
composed primarily of coarse-grained sand or gravel is granular material
(ii) Observe soil as it is excavated. Soil that remains in clumps when excavated is cohesive. Soil that breaka up easily and does
not stay in clumps is granular.
(iii) Observe the side of the opened
excavation and the surface area adjacent to the excavation. Crack-like openings such as
tension cracks could indicate fissured material If chunks of soil spall off a vertical side, the soil could be fissured. Small spalls are evidence of moving ground and are indications of potentially hazardous situations.
(iv) Observe the area adjacent to the excavation and the excavation itself for
evidence of existing utility and other underground structures, and to identify previously disturbed soil.
(v) Observe the opened side of tho
excavation to identify layered systems. Examine layered systems to identify if the
layers slope toward the excavation. Estimate the degree of slope of the layers.
(vi) Observe the area adjacent to the excavation and the sides of the opened excavation for evidence of surface water, water seeping from the sides of the
excavation, or the location of the level of the water table.
(vii) Observe the area adjacent to the excavation and the area within the excavation for sources of vibration that may
affect the stability of the excavation face.
(2] Manual tests. Manual analysis of soil samples is conducted to determine
quantitative aa well aa qualitative properties
of soil and to provide more information in order to classify soil properly.
(i) Plasticity. Mold a moist or wet sample
of soil into a ball and attempt to roll it into threads as thin as Wi-tnch in diameter.
Cohesive material can be successfully rolled into threads without erumbiing- For example, if at least a two inch (50 mm) length of Vsinch thread can be held on one end without tearing, the soil is cohesive.
(ii) Dry strength. If the soil is dry and crumbles on its own or with moderate pressure into individual grains or fine
powder, it is granular (any combination of gravel sand, or silt). If the soil is dry and falls into clumps which break up into smaller clumps, but the smaller dumps can only be
broken up with difficulty, it may be clay in
any combination with gravel aand or silt. If the dry soil breaks into clumps which do not break up into small clumps and which can
only be broken with difficulty, and there is no visual indication the soil is fissured, the soil may be considered unfissured.
(iii) Thumb penetration. The thumb
penetration test can be used to estimate the
unconfined compressive strength of cohesive soils. (This test is based on the thumb penetration test described in American
Society for Testing and Materials (A5TM]
Standard designation D248&--"Standard Recommended Practice for Description of
Soils (Visual--Manual Procedure).") Type A soils with an unconfined compressive strength of 1.5 tsf can be readily indented by the thumb; however, they can be penetrated by the thumb only with very great effort.
Type C soils with an unconfined compressive strength of 0.5 tsf can be easily penetrated
several inches by the thumb, and can be
molded by light finger pressure. This test should be conducted on an undisturbed soil sample, such as a large clump of spoil, as
. soon as practicable after excavation to keep
to a minimum the effects of exposure to
drying influences. If the excavation is later exposed to wetting influences (rain, flooding),
the classification of the soil must be changed accordingly.
(iv) Other strength tests. Estimates of unconfined compressive strength of soils can
also be obtained by use of a pocket
penetrometer or by using a hand-operated shearvane.
(v) Drying tesL The basic purpose of the drying test is to differentiate between
cohesive material with fissures, unfissured cohesive material and granular material. The procedure for the drying test involves drying a sample of soil that is approximately one inch thick (2.54 cm) and six inches (15.24 cm)
in diameter until it is thoroughly dry:
(A) If the sample develops cracks as it dries, significant fissures are indicated.
(B) Samples that dry without cracking are to be broken by hand. If considerable force is
necessary to break a sample, the soil has
significant cohesive material content. The soil can be classified as a unfissured cohesive material and the unconfined compressive strength should be determined.
(C) If a sample breaks easily by hand, it is
either a fissured cohesive material or a
granular material To distinguish between the two. pulverize the dried clumps of the sample
by hand or by stepping on them. If the clumps do not pulverize easily, the material is cohesive with fissures. If they pulverize easily into very small fragments, the material
is granular.
Appendix B to Subpart P
Sloping and Benching
(a) Scope and application. This appendix contains specifications for sloping and benching when used as methods of protecting employees working in excavations from caveins. The requirements of this appendix apply when the design of sloping and benching protective Bystems is to be performed in accordance with the requirements set forth in 9 1926.652(b)(2).
(b) Definitions. Actual slope means the slope to which an excavation face is excavated. Distress means that the soil is in a
condition where a cave-in is imminent or is likely to occur. Distress is evidenced by such phenomena as the development of fissures in the face of or adjacent to an open excavation; the subsidence of the edge of an excavation; the slumping of material from the face or the bulging or heaving of material from the bottom of an excavation: the spalling of material from tile face of an excavation; and ravelling, i e.. small amounts of material such as pebbles or tittle clumps of material suddenly separating from the face of an excavation and trickling or roiling down into the excavation.
Maximum allowable slope means the steepest incline of an excavation face that is acceptable for the most favorable site conditions as protection against cave-ins. and is expressed as the ratio of horizontal
distance to vertical rise (H:V). Short term exposure means a period of
time less than or equal to 24 hours that an excavation is open.
(c) Requirements--(1) Soil classification. Soil and rock deposits shall be classified in accordance with appendix A to subpart P of part 1926.
. (2] Maximum allowable slope. The maximum allowable slope for a soil or rock deposit shall be determined from Table B-l of this appendix.
(3) Actual slope, (i) The actual slope shall not be steeper than the maximum allowable slope.
(ii) The actual slope shall be less steep than the maximum allowable slope, when there are signs of distress. If that situation occurs, the slope shall be cut back to an actual slope which is at least Vfe horizontal to one vertical (HH;1V) less steep than the maximum allowable slope. .
(iii) When surcharge loads from stored material or equipment operating equipment, or traffic are present, a competent person shall determine the degree to which the actual slope must be reduced below the maximum allowable slope, and shall assure that such reduction is achieved. Surcharge loads from adjacent structures shall be evaluated in accordance with 9 1928-651(i).
(4) Configurations. Configurations of sloping and benching systems shall be in accordance with Figure B-l.
WV 000010792
Federal Register / Vol. 54, No. 209 / Tuesday, October 31. 1989 / Rules and Regulations
TABLE B-l MAXIMUM ALLOWABLE SLOPES
45965
SOIL OR ROCK TYPE
STABLE ROCK TYPE A [2] TYPE B TYPE C
MAXIMUM ALLOWABLE SLOPES (H:V)^ FOR EXCAVATIONS LESS THAN 20 FEET n f f p 131
VERTICAL (90'')
3/4 : 1 (53c)
. l*.r
(45)
l*s:l
(34)
NOTES:
1. Numbers shown in parentheses next to maximum allowable slopes are angles expressed in degrees from the horizontal. Angles have been rounded off.
2. A short-term maximum allowable slope of l/ZHrlV" (63) is allowed in excavations in Type A soil that are 12 feet (3.67 m) or less in depth. Short-term maximum allowable slopes for excavations greater than 12 feet (3.67 m) in depth shall be 3/4H:LV (53).
3. Sloping or benching for excavations greater than 20 feet deep shall be designed by a registered professional engineer.
Figure B-l Slope Configurations (All slopes stated below are in the horizontal to vertical ratio) B-l.l Excavations made in Type A soil. 1. All simple slope excavation 20 feet or less in depth shall have a maximum allowable slope of %:l.
Simple Slope--General Exception: Simple slope excavations which are open 24 hours or less (short tenn) and which are 12 feet or less in depth shall have a maximum allowable slope of Vt:l.
vvv 000010T93
45966 Federal Register / VoL 54, No. 209 / Tuesday, October 31f 1989 / Rules and Regulations
Simple Slope--Short Term 2. All benched excavations 20 feet or less in depth shall have a maximum allowable slope of % to 1 and maximum bench dimensions as follows*
Simple Bench
/
3. All excavations 9 feet or less in depth whieh have unsupported vertically sided lower portions shall have a maximum vertical side of 3V4 feet.
0000^*
Federal Register / Vol 54, No. 209 / Tuesday, October 31. 1989 / Rules and Regulations 43967
Unsupported Vertically Sided Lower Portion--Maximum S Feet in Depth All excavations more than 8 feet but not more than 12 feet in depth which unsupported vertically sided lower portions shall have a maximum allowable slope of lrl and a maximum vertical side of 3 Va feet
Unsupported Vertically Sided Lower Portion--Maximum 12 Feet in Depth All excavations 20 feet or less in depth which have vertically sided lower portions that are supported or shielded shall have a maximum allowable slope of 4:1. The support or shield system must extend at least 18 inches above the top of the vertical side.
Suported or Shielded Vertically Sided Lower Portion 4. All other simple slope, compound slope, and vertically sided lower portion excavations shall be in accordance with the other options permitted under 9 1929.652(b].
B-1.2 Excavations Made in Type B Soil 1. All simple slope excavations 20 feet or less in depth shall have a maximum allowable slope of 1:1.
VVV 000010795
45968 Federal Register / Vol, 54. No. 209 / Tuesday. October 31. 1989 / Rules and Regulations
2. All benched excavations 20 feet or less in depth shall have a maximum allowable slope of 1:1 and maximum bench dimensions as follows:
This bench
Single Bench in cohesive soil onlv
Multiple Bench 3. All excavations 20 feet or less in depth which have vertically sided lower portions shall be shielded or supported to a height at least 18 inches above the top of the vertical side. All such excavations shall have a maximum allowable slope of 1:1.
VW 000010796
Federal Register / VoL 54, No. 209 / Tuesday, October 31, 1989 / Rules and Regulations 43969
Vertically Sided Lower Portion 4. All other sloped excavations shall be in accordance with the other options permitted in $ 1926.652(b).
B-1.3 Excavations Made in Type C Soil 1. All simple slope excavations 20 feet or less in depth shall have a maximum allowable slope of 1V4:1.
Simple Slope 2. All excavations 20 feet or less in depth which have vertically sided lower portions shall be shielded or supported to a height at least 15 inches above the top of the vertical side. All such excavations shall have a maximum allowable slope of lMirl.
Vertical Sided Lower Portion 3. All other sloped excavations shall be in accordance with the other options permitted in i 1926.652(b).
B-1.4 Excavations Mads in Layered Soils 1. All excavations 20 feet or less in depth made in layered soils shall have a maximum allowable slope for each layer as set forth beiow.
vvv 000010*97
45970 Federal Register / Vol. 54, No, 209 / Tuesday, October 31, 1989 / Rules and Regulations VVV 000010798
Federal Register / VoL 54, No. 209 / Tuesday, October 31. 1989 / Rules and Regulations 45971
2. All other eloped excavations shall be in accordance with the other options permitted in 1926.652(b).
Appendix C to Subpart P
Timber Shoring for Trenches
(a) Scope. This appendix contains information that can be used timber shoring k provided as a method of protection from ^vfr-ins in trenches that do not exceed 20
feet (5.1 m) in depth. This appendix must be used when design of timber shoring
protective systems is to be performed in accordance with $ 1925.552(c)(1). Other timber shoring configurations: other systems of support such as hydraulic and pneumatic systems; and other protective systems such as sloping, benching, shielding, and freezing
systems must be designed in accordance with the requirements set forth in S 1928.652(b) and $ 1926.652(c).
(b) Soil Classification. In order to use the data presented in this appendix, the soil type or types in which the excavation is made must firs! be determined using the soil
VVV 000010799
45972 Federal Register / Vol. 54, No. 209 / Tuesday, October 31, 1969 / Rules and Regulations
classification method set forth in appendix A of subpart P of this part.
(c) Presentation of Information.
Information is presented in several forms as follows:
(1) Information is presented in tabular form
in Tables C-i,i, C-1J2, and C-1.3. and Tables
C-2.1. C-2.2 and C-2J3 following paragraph (g) of the appendix. Each table presents the minimum sizes of timber members to use in
a shoring system, and each t3bie contains data only for the particular soil type in which the excavation or portion of the excavation is made. The data are arranged to allow the user the flexibility to select from among several acceptable configurations of members based on varying the horizontal spacing of the crossbraces. Stable rock is exempt from
shoring requirements and therefore, no data
are presented for this condition. (2) lnfbrmaiion concerning the basis of the
tabular data and the limitations of the data is
presented in paragraph (d) of this appendix and on the tables themselves.
(3) Information explaining the use of the
tabular data is presented in paragraph (e) of
this appendix. (4) Information illustrating the use of the
tabular data is presented in paragraph (f] of this appendix.
(5) Miscellaneous notations regarding Tables C-l.l through C-1.3 and Tables C-2.1 through C-2.3 are presented in paragraph (g)
of this Appendix
(d) Basis and limitations of the data.--(l] Dimensions of timber members, (i) The sizes
of the timber members listed in Tables C-l.l through C-1.3 are taken from the National Bureau of Standards (NBS) report,
"Recommended Technical Provisions for. Construction Practice in Shoring and Sloping
of Trenches and Excavations." In addition, where NBS did not recommend specific sizes of members, member sizes are based on an
analysis of the sizes required for use by existing codes and on empirical practice.
(ii) The required dimensions of the
members listed in Tables C-l.l through C-1.3 refer to actual dimensions and not nominal
dimensions of the timber. Employers wanting to use nominal size shoring are directed to Tables C-2.1 through C-2.3, or have this choice under $ I926.652(c](3). and are
referred io The Corps of Engineers. The
Bureau of Reclamation or data from other
acceptable sources. (2) Limitation of application, (i) It is not
intended that the timber shoring specification apply to every situation that may be
experienced in the held. These data were developed to apply to the situations that are
most commonly experienced in current trenching practice. Shoring systems for use in situations that are not covered by the data in this appendix must be designed as specified in \ 1926.632(c).
(ii) When any of the following conditions are present, the members specified in the
tables are not considered adequate. Either an
alternate timber shoring system must be
designed or another type of protective system designed in accordance with i 1926.652.
(A) When loads imposed by strictures or
by stored material adjacent to the trench
weigh in excess of the load imposed by a two-foot soil surcharge. The term ''adjacent"
as used here means the area within a horizontal distance from the edge of the
trench equal to the depth of the trench.
(B) When vertical loads imposed on cross braces exceed a 240-pound gravity load distributed on a one-foot section of the center
of the crossbrace. (C) When surcharge loads are present from
equipment weighing in excess of 20.000 pounds.
(D) When only the lower portion of a trench is shored and the remaining portion of the trench is sloped or benched unless: The sloped portion is sloped at an angle less steep than three horizontal to one vertical: or the members are selected from the tables for use at a depth which is determined from the top of the overail trench, and not from the toe of the sloped portion.
fe) Use of Tables. The members of the shoring system that are to be selected using this information are the cross braces, the uprights, and the wales, where wales are required. Minimum sizes of members are specified for use in different types of soil. There are six tables of information, two for each soil typo. The soil type must first be determined in accordance with the soil classification system described in appendix A to subpart P of part 1926. Using the appropriate table, the selection of the size and spacing of the members is then made. The selection is based on the depth and width of the trench where the members are to be installed and. in most instances, the selection is also based on the horizontal spacing of the crossbraces. Instances where a choice of horizontal spacing of crossbracing is available, the horizontal spacing of the crossbraces must be chosen by the user before the size of any member can be determined. When the soil type, the width and depth of the trench, and the horizontal spacing of the crossbracss are known, the size and vertical spacing of the crossbraces, the size and vertical spacing of the wales, and the size and horizontal spacing of the uprights can be read from the appropriate table.
(f) Examples to Illustrate the Use of Tables C-l.l through C-1.3.
(1) Example l. A trench dug in Type A soil is 13 feet deep and five feet wide. From Table C-l.l, for acceptable arrangements of timber can be used.
Arrangement #1
Space 4x4 crossbraces at six feet horizontally and four feet vertically.
Wales are not required. Space 3X3 uprights at six feet horizontally. This arrangement is commonly called "skip shoring."
Arrangement 2
Space 4x6 crossbraces at eight feet horizontally and four feet vertically.
Space 8X6 wales at four feet vertically. Space 2x6 uprights at four feet horizontally.
Arrangement -J
Space 6X6 crossbraces at 10 feet horizontally and four feet vertically.
Space 8X10 wales at four feet vertically.
Space 2x6 uprights at five feet horizontally.
Arrangement ~4
Space 6X6 cro9sbraces at 12 feet horizontally and four feet vertically.
Space 10X10 wales at four feet vertically. Spaces 3x6uprights at six feet horizontally. (2) Example 2. A trench dug in Type B soil in 13 feet deep and five feet wide. From Table C-1.2 three acceptable arrangements of members are listed.
Arrangement
Space 6x6 crossbraces at six feet horizontally and five feat vertically.
Space 8X6 wales at five feet vertically. Space 2X6 uprights at two feet horizontally.
Arrangement **2
Space 6X6 crossbraces at eight feet horizontally and five feet vertically.
Space 10x10 wales at five feet vertically. Space 2X6 uprights at two feet horizontally.
Arrangement *3
Space 6x6 crossbraces at 10 feet horizontally and five feet vertically.
Space 10X12 wales at five feet vertically. Space 2x8 uprights at two feet vertically. (3) Example 3. A trench dug in Type C soil is 13 feet deep and five feet wide. From Table C-1.3 two acceptable arrangements of members can be used.
Arrangement #2
Space 8X6 crossbraces at six feet horizontally and five feet vertically.
Space 10X12 wales at five feet vertically. Position 2x6 uprights as closely together as possible. If water must be retained use special tongue and groove uprights to form tight sheeting.
Arrangement --2
Space 6X10 crossbraces at eight feet horizontally and five feet vertically.
Space 12x12 wales at five feet vertically. Position 2X6 uprights in a close sheeting configuration unless water pressure must be resisted. Tight sheeting must be used where water must be retained. (4) Example 4. A trench dug in Type C soil is 20 feet deep and 11 feet wide. The size and spacing of members far the section of trench that is over 15 feet in depth is determined using Table C1.3. Only one arrangement of members is provided. Space 6x10 crossbraces at six feet horizontally end five feet vertically. Space 12X12 wales at five feet vertically. Use 3X8 tight sheeting. Use of Tables C-2.1 through C-2.3 would follow the same procedures. (g) Notes for oil Tables. 1. Member sizes at spacinga other than indicated are to be determined as specified in 1929.352(c). "Design of Protective Systems."
WV 0000X0800
Federal Register / Vol. 54, No. 2Q9 / Tuesday, October 31, 1989 / Rules and Regulations 45973
2. When conditions are saturated or submerged use Tight Sheeting. Tight Sheeting refers to the use of specially-edged timber
planks (e.g., tongue and groove) at least three inches thick, steel sheet piling, or similar construction that when driven or placed in position provide a tight wall to resist the lateral pressure of water and to prevent the loss of backfill material. Close Sheeting refers to the placement of planks side-by-side allowing as little space as possible between them.
3. All spacing indicated is measured center to center.
4. Wales to be installed with greeter
dimension horizontal 5. if the vertical distance from the center of
the lowest crossbrace to the bottom of the trench exceeds two and one-half feet, uprights shall be firmly embedded or a mudsill shall be used. Where uprights are embedded, the vertical distance from the center of the lowest crossbrace to the bottom of the trench shall not exceed 33 inches.' When mudsills are used, the verticaL distance
shall not exceed 42 Inches. Mudsills are wales that are installed at the toe of the trench side. .
6. Trench jacks may be used in lieu of or in combination with timber crossbraces.
7. Placement cf crossbraces. When the vertical spacing of crossbraces is four feet, place the top crossbrace no more than two feet below the top of the trench. When the vertical spacing of crossbraces is five feet place the top crossbrace no more than 2.5 feet
below the top of the trench.
BILUNQ COOE 4S10-2S-M
VVV 000010801
o o jo a o ^
Federal Register / V o l 54, No. 209 ( Tuesday, October 31,1929 / Rules and Regulations
pooM joj paimiisqns Aq euj m6uaj}S luoieAinbo jo sjaqiuaui pajnisejnuew isd 058 ueij) ssa(_ jou qi6uaj}s 6uipuaq e qiiM ^uateAinba jo ^eo paxii-J ,
t 31QN 33S
9xe b 01X01 b 01X8 8X8 8X8 8X8 8X8 21
oi dn Mt b 01X8 V 01X8 8X8 8X8 8X8 8X8 01
oi dn
9xe b , 8X8 b 8X9 8X9 9X9 9X9 9X9 8 oi dn
9xe b 8X9 b 8X9 8X9 9X9 9X9 9X9 9 oi dn
b 01X01 b 8X9 8X9 9X9 9X9 9X9
21
oi dn
9X2
t OIXS
b 8X9 8X9 9X9 5X9 9X9
01
oi dn
9X2 t 8X8 V 9X9 9X9 9X9 9Xb 9Xb 8
oi dn
P.bsy b 9X9 9X9 9Xb bXb bXb
9
ION oi <m
9X2 9X2
b 8X8 b 9X9 9X9 9X9 9Xb 9Xb 21
oi dn
b
SxF~ b
9X9 9X!T nf 9Xb 9X'b ------ GT"
oi dn
0X2
p.bay b 9X9 9X9 5Xb bXb bXb
8
loq oi dn
9X2
l--p ,~W b
9X9 9X9 9Xb bXb nV
9
10(1 oi an
8
y
5 (1333)
17 _ "Iso'b (1333) DNIDVdS
(MI) (133J)
91 21
6
9
b (1333)
3ZIS DNIOVdS 01 dfi oi dn oi dn oi dn Ul dn ONIDVdS
DNIDVdS IViNOZlaOH 310VM031V WflNlXVW *ih3A
`ia3A
(1333) H3N381 30 II101M
*ziaon
Sliloiadn
S3 IvJi
s3ovae ssoao
SH3M3W 30 lJMnVd5 m (IWiiW) 321$------------------- :-------------------------------
02 a3A0
02 01 51
SI 01 OI
Cl 01 s
(1333) H3M3M1 30 Hld30
(aGaeqDjns li z) >sd u + h X 52 * Pd
V 3dAl UOS
siN3W3dint)3a aaawu wnwiNiw -- onihohs raaaTalflwTi
rt-0 319V1
45974
i
TABLE C-U2 TIMBER TRENCH SHORING -- MINIMUM TIMBER REQUIREMENTS * SOIL TYPE D P = 45 X II t 72 psf (2 ft. Surcharge)
Federal Register / V o l 54. No. 209 / Tuesday, October 31.1989 / Rules and VVV 000010803
DEPTH
TRENCH (FEET)
HORIZ. SPACINC
(FEET)
___
CROSS BRACES
WIDTH OF TRENCH (FEET) TJFTO UP TO UP TO UP TO
4 6 9 12
(ACTUAL! ANIL.bPACINC OF MEMBERS** WALES
UPRIGHTS
VERT. UP TO SPACING
15 (FEET)
SIZE (IN)
MAXIMUM ALLOWABLE HORIZONTAL SPACING
SPACING
(FEET)
(FEET) CLOSE
2
3
UP TO
5
6
4X6 4X6 6X6 6X6 6X6
5
6X8
5
UP TO
TO
8
6X6 6X6 6X6 6X8 6X8
5
8X10
5
UP TO
to
10
6X6 6X6 6X6 6X8 6X8
5 . 10X10
5
2X6 2X6 2X6
See Nor e 1
UP TO
10
6
6X6 6X6 6X6 6X8 6X8
5
8X8
5
UP TO
8 6X8 6X8 6X8 8X8 8X8 5 10X10 5
2X6 2X6
UP TO
15
10
8X8 RXR 8X8 RXR sxin 5
10X12
5
See
tote 1
2X6
JP TO
15
6
6X8 6X8 6X8 8X8 8X8
5
8X10 5 3X6
JP TO TO 8 8X8 8X8 8X8 8X8 8X10 5 10X12 5 3X6
JP TO
10
8X10 8X10 8X10 8X10 10X10
5
12X12
5
3X6
tee lote 1
OVER 20
SEE NOTE 1
* Mixed oak or equivalent with a bending strength not less than 850 p>si. ** Manufactured members of equivalent strength may by substituted for wood.
//Federal Register / Vol. 54. No. 209 Tuesday, October 31,1989 Rules and Regulations
VVV 0 0 0 0 1 0 8 0 4
TABT.E C-l . 3
TIMBER TRENCH SHORING -- MINIMUM TIMBER REQUIREMENTS * SOIL TYPE C P - 80 X 11 + 72 psf (2 ft. Surcharge)
a
DEPTH OF
TRENCH (FEET)
5 TO
10
HORIZ. SPAC1NC
(FEET)
UP TO 6
UP TO 8
UP TO ' 10
See Note 1
UP TO 6
10 UP TO
TO 8
See
15 Note I See
Note I
STZE (ACTUAL! AND SPACING OF MEMBERS**
CROSS BRACES
UPRIGHTS
WIDTH OF TRENCH (FEET) VERT.
UP TO UP TO UP TO UP TO UP TO SPAC1NC
SIZE
VERT. SPACING
MAXIMUM
ALLOWABLE HORIZONTAL SPACING (FEET) (See Note 2)
4'
6
9
12
15 (FEET)
(IN-) (FEET) CLOSE
6X8 6X8 6X8 8X8 8X8
5
8X10 5 2X6
8X8 8X8 8X8 8X8 8X10 5 10X12 5 2X6
~
8X10 6X10 8X10 8X10 10X10
5
12X12
5
2X6
8X8 8X8 8X8 8X8 8X10 5 10X12 5 2X6
8X10 8X10 8X10 8X10 10X10
5
12X12
5
2X6
UP TO
15
6
8X10 8X10 8X10 8X10 10X10
5
12X12
5
3X6
See
TO Note 1 See
20 Note 1 See Note 1
OVER 20
SEE NOTE 1
* Mixed Oak or equivalent with a bending strength not lees than 850 psi. ** Manufactured members of equivalent strength may be substituted for wood.
&
TIMBER TRENCH SHORING -- MINIMUM TIMBER REQUIREMENTS * SOIL TYPE A P - 25 X H t 72 psf (2 ft. Surcharge)
3
/Federal Register / Vol. 54. No. 209 / Tuesday, October 31.1989 Rules and Regulations
DEPTH OF
TRENCH (FEET)
HORIZ. SPACING (FEET)
UP TO 56
UP TO
TO 8 UP TO
10 to
UPj2 TO
SIZE (S4S) AND SP/ICING OF MEMBERS . **
CROSS BRACES
WA ES
UPRICHTS
WIDTH OF TRENCH (FEET)
VFBT
MAXIMUM ALLOWABLE HORIZONTAL SPACING
UP TO UP TO UP TO UP TO UP TO SPACINC
4
6
9 12
15 (FEET)
SIZE SPACING (TN.) (FEET) CLOSE
(FEET) 45
6
8
4X4 4X4 4X4 4X4 4X6 4
Not Req 1 d
Not Req'd
4X6
4X4 4X4 4X4 4X6 4X6 4
Not Req'd
Not Req'd
4X8
i 4X6 4X6 4X6 6X6 6X6 4 8X8 4
4X6
4X6 4X6 4X6 6X6 6X6 4
8X8.
4
4X6
10
UP TO 6
4X4
UP TO 8 4X6
TO
UP TO 10
6X6
UP TO 12
6X6
4X4 4X4 6X6
4X6 6X6
4X6 ' 6X6
6X6 6X6
6X6 6X6 6X6
6X6 6X6 6X6 6X6
4 4 4 4
Not Not Req'd Req'd
6X8 4 8X8 4
8X10
4
4X10 4X6
4X8 4X6 4X10
15 TO 20
OVER 20
LIP TO 6
UP TO 8
UP TO 10
UP TO 12
6X6 6X6 6X6 6X6
SEE NOTE I
6X6 6X6 6X6 6X6
6X6 6X6 6X6 6X6 6X6 6X6 6X6 6X8
6X6 6X6 6X8 6X8
4 4 4 4
6XB 8X8 8X10 8X12
4 4 4 4
3X6 3X6 3X6 3X6
4X12 4X12
* Douglas fir or equivalent with a bending strength not less than 1500 psi. ** Manufactured members of equivalent strength may be substituted for wood.
v w 000QL0B05
45977
45978
Federal Register / Vol. 54, No. 209 / Tuesday, October 31,1989 / Rules and Regulations
TABLE C-2.2
TIMBER TRENCH SHQRINC -- MINIMUM TIMBER REQUIREMENTS *
SOIL TYPE B P = 45 X H * 72 psf (2 ft. Surcharge) a
DEPTH OF
TRENCH (FEET)
5
TO
10
HORIZ. SPACING (FEET)
UP TO 6
UP TO 8
UP TO 10
See Note 1
SIZE (S4S) AND SPACING OF MEMBERS **
CllflSS_ RRACFS___________________________________W_A__-F.S
UPRIGHTS
WIDTH OF TRENCH (FFET)
VERT.
UP TO UP TO UP TO UP TO UP TO SPACING
4
6
9 12
15 (FEET)
SIZE (IN.)
VERT. SPACING
(FFFT'I
MAXIMUM ALLOWABLE HORIZONTAI. SPACING
(FEET)
CLOSE
2
3
46
4X6 4X6 4X6 6X6 6X6
5 6X8
5
3X12 4X8
4X12
4X6 4X6 6X6 6X6 6X6
5 8X8
5
3X8
4X8
4X6 . 4X6 6X6 6X6 6X8
5 8X10
5
4X8
10 TO 15
15 TO 20
OVER 20
UP TO 6
UP TO 8
UP TO 10
See Note 1
UP TO 6
UP TO 8
UP TO 10
See Note 1
6X6 6X8 6X8
6X8 6X8 8X8
SEE NOTE 1
6X6 6X6 6X8 6X8 6X8 8X8
6X8 6X8 6X8 6X8 8X8 8X8
6X8 8X8 8X8
6X8 8X8 8X8
6X8 8X8 8X8
8X8 8X8 8X8
5 8X8 5 10X10 5 10X12
5 8X10 5 10X12 5 12X12
5 3X6 4X10 5 3X6 4X10 5 3X6 4X10
5 4X6 5 4X6 5 4X6
* Douglas fir or equivalent with a bending strength not less than 1500 psi. ** Manufactured members of equivalent strength may be substituted for wood.
,3 0 1 0 0 0 0
t
TIMBER TRENCH SHORING -- MINIMUM TIMBER REQUIREMENTS ***
SOIL TYPE C
* 80 X H 72 psf (2 ft. Surcharge)
Federal Register / Vol. 54, No. 209 / Tuesday. October 31,1389 / Rules and
DEPTH OF
TRENCH
5 TO 10
HORIZ. SPACING
(FEET)
OP TO 6
UP TO 8
UP TO 10
-i- SIZE (S4S) ANP-SPACINC OF 1MFMRERS AA
CROSS BRACES
WAL FS
UPRIGHTS
WIDTH OF TRENCH (FEET)
VERT.
UP TO UP TO UP TO UP TO UP TO SPACING SIZE
VERT. MAXIMUM ALLOWABLE HORIZONTAL SPACING
SPACINC
(FEET)
4
6
9 .... 12
15
(FEET) (IN-)
(FEET) CLOSE.
6X6 6X6 6X6 6X6 8X8
5
8X8
5
3X6
6X6 6X6 6X6 8X8 8X8 5 10X10 5
3X6
6X6 6X6 8X8 8X8 8X8 5 10X12 5
3X6
See Note 1
UP TO
10 6 6X8 6X8 6X8 8X8 8X8 5 10X10 5
UP TO
TO
8
8X8 8X8 8X8 . 8X8 8X8
5
12X12'
5
See 15 Note 1
See Note 1
4X6 4X6
UP TO 15 6 8X8 8X8 8X8 8X10 8X10 5
10X12
5
4X6
See
TO Note 1
See
Note 1
20
< See
< vlote 1
<
OVER 20
SEE NOTE 1
t
* Douglas fir or equivalent with a bending strength not less than 1500 psi. ** Manufactured members of equivalent strength may be substituted for wood.
BIIUNO CODE 4S10-H-C
ioeotoooo
to
45980 Federal Register / Vol. 54, No. 209 / Tuesday, October 31, 1909 / Rules and Regulations
Appendix D to Subpart P
experienced in current trenching practice-
Table D-1.2: Find vertical shores and 2 inch
A/umuium Hydrau/ic Shoring for Trenches
Shoring systems for use in situations that are not covered by the data in this appendix must be otherwise designed as specified in
diameter cylinder (with special oversleeves as designated by footnote 2] spaced 5.5 feet o.c. horizontally and 4 feet o.c. vertically,
(a) Scope. This appendix contains information that can be used when aluminum
hydraulic shoring is provided as a method of
protection against cave-ins in trenches that do not exceed 20 feet (6.1m) in depth. This appendix must be used when design of the
aluminum hydraulic protective system cannot
be performed in accordance with 9 1026.652(c)(2).
(b) Soil Classification. In order to use data
presented in this appendix, the soil type or types in which the excavation is made must first be determined using the soil
classification method set forth in appendix A of suboart P of part 1926.
(c) Presentation of Information. Information is presented in several forms as follows:
(1) Information is presented in tabular Form in Tables D-1,1. D-1.2, D-1.3 and E-1.4. Each table presents the maximum vertical and
horizontal spacings that may be used with various aluminum member sizes and various hydraulic cylinder sizes. Each table contains
S 1926.652(c). (ii) When any of the following conditions
are present, the members specified in the
Tables are not considered adequate. In this case, an alternative aluminum hydraulic shoring system or other type of protective
system must be designed in accordance with
1928 652. (A) When vertical loads imposed on cross
braces exceed a 100 Pound gravity load
distributed on a one foot section of the canter
of the hydraulic cylinder. (B) When surcharge loads are present from
equipment weighing in excess of 20.000 pounds.
(C) When only the lower portion or a trench is shored and the remaining portion of
the trench is sloped or benched unless; The
sloped portion is sloped at an angle less steep than three horizor.tai to one vertical; cr the
members are selected from the tables for use
at a depth which is determined from the top of the overall trench, and not from the toe of the sloped portion.
plywood (per footnote (g)(7) to the D-l Table) should be used behind the shores. (See
Figures 2 & 3 for typical installations.) (4) Example 4: A trench is dug in previously
disturbed Type 3 soil, with characteristics of a Type C soil, and will require sheeting. The
trench is 18 feet deep and 12 feet wide. 8 foot horizontal spacing between cylinders is desired for working space. From Table D-1.3:
Find horizontal wale with a section modulus of 14.0 spaced at 4 feet o.c. vertically and 3 inch diameter cylinder spaced at 9 feet maximum o.c. horizontally. 3X12 timber
sheeting is required at close spacing
vertically. (See Figure 4 for typical installation.)
(5) Example 5; A trench is dug in Type C soil. 9 feet deep and 4 feet wide. Horizontal cylinder spacing in excess of 6 feet is desirod
for working space. From Table D-1.4: Find
horizontal wale with a section modulus of 7.0 and 2 inch diameter cylinders spaced at 6.5 feet o.c. horizontally. Or, find horizontal wale
data only for the particular soil type in which
(e) Use of Tables D-l.l, D-1.2, D-1.3 and
with a 14.0 section modulus and 3 inch
y
the excavation or portion of the excavation is D-1.4. The members of the shoring system made. Tables D--1.1 and D-1.2 are for vertical that are to be selected using this information
diameter cylinder spaced at 10 feet o.c. horizontally. Both wales are spaced 4 feet o.c.
shores in Types A and B soil. Tables D-1.3
are the hydraulic cylinders, and either the
vertically. 3x12 timber sheeting is required
and Dl.4 are for horizontal waler systems in vertical shores or the horizontal wales. When at close spacing vertically. (See Figure 4 for
Types B and C soil.
a waler system is used the vertical timber
typical installation.)
5/
(2) Information concerning the basis of the sheeting to be used is also selected from tabular data and the limitations of the data is these tables. The Tables D-l.l and D-1.2 for
(g) Footnotes, and general notes, far Tables D-l.l, D-1.2, D-1.3. and D-1.4.
presented in paragraph (d) of this appendix.
vertical shores are used in Type A and B soils
(1) For applications other than those listed
(3) Information explaining the use of the tabular data is presented in paragraph (e) of
that do not require sheeting. Type B soils that in the tables, refer to 9 1926-S52(c)(Z) for use
may require sheeting, and Type C soils that
of manufacturer's tabulated data. For trench
this apoendix.
always require sheeting are found in the
depths in excess of 20 feet, refer to
(4) Information illustrating the use of the tabular data is presented in paragraph (.0 of this appendix.
(5) Miscellaneous notations (footnotes) regarding Table D-l.l through D-1.4 are presented in paragraph (g) of this appendix.
(6) Figures, illustrating typical installations
of hydraulic shoring, are included just prior to
the Tables. The illustrations page is entitled "Aluminum Hydraulic Shoring; Typical Installations."
(d) Basis and limitations of the data. (I) Vertical shore rails and horizontal wales are those that meet the Section-- ' Modulus requirements in the D-l Tables. Aluminum material is 8061-T6 or material of equivalent strength and properties.
[2} Hydraulic cylinders specifications, (i) 2inch cylinders shall be a minimum 2-inch inside diameter with a minimum safe working capacity of no less than 18.000 pounds axial compressive load at maximum extension.
Maximum extension is to include full range of cylinder extensions as recommended by product manufaturer.
horizontal wale Tables D-1.3 and D-1.4. The soil type must first be determined in accordance with the soil classification
system described in appendix A to subpart P of part 1926. Using the appropriate tabie. the selection of the size and spacing of the
members is made. The selection is based on
the depth and width of the trench where the members are to be installed. In these tables the vertical spacing is held constant at four
feet on center. The tables show the maximum
horizontal spacing of cylinders allowed for each size of wale in the waler system tables, and in the vertical shore tables, the hydraulic
cylinder horizontal spacing is the same as the vertical shore spacing.
(f) Example to Illustrate the Use of the Tables:
(1) Example 1: A trench dug in Type A soil is 6 feet deep and 3 feet wide. From Table D-l.l: Find
vertical shores and 2 inch diameter cylinders
spaced 8 feet on center (o.c.) horizontally and 4 feet on center (o.c.) vertically. (See Figures 1 4 3 for typical installations.)
9 1926.652(c)(2) and 9 1926.652(c)(3). (2) 2 inch diameter cylinders, at this width.
shal1 have structural steel tube (3.5 x 3.5 x 0.1875) oversleeves, or structural oversleeves of manufacturer's specification, extending the full, collapsed length.
(3) Hydraulic cylinders capacities, (i) 2 inch cylinders shall be a minimum 2-inch inside diameter with a safe working capacity of not le9s than 18.000 pounds axial compressive load at maximum extension. Maximum extension is to include full range of cylinder extensions as recommended by product
manufacturer. (ii) 3-inch cylinders shall be a minimum 3-
inch inside diameter with a safe work capacity of not less than 30.000 pounds axial
compressive load at maximum extension. Maximum extension is to include full range of cylinder extensions as recommended by
product manufacturer. (4) All spacing indicated is measured
center to center. (5) Vertical shoring rails shall have a
(ii) 3-inch cylinders shall be a minimum 3-
(2) Example 2:
minimum section modulus of 0.40 inch.
inch inside diameter with a safe working
A trench is dug in Type B soil that does not
(6) When vertical shores are used, there
capacity of not less than 30.000 pounds axial require sheeting. 13 feet deep and 5 feet wide. must be a minimum of three shores spaced
compressive load at extensions as
From Table D-1.2: Find vertical shores and 2 equally, horizontally, in a group.
recommended by product manufacturer.
inch diameter cylinders spaced 6.5 feet o.c.
(7) Plywood shall be 1.125 in. thick
(3] Limitation of application.
horizontally and 4 feet o.c. vertically. (See
softwood or 0.75 inch, thick. 14 ply, arctic
(i) It is not intended that the aluminum
Figures 1 & 3 for typical installations.]
white birch (Finland form). Please note that
hydraulic specification apply to every
(3) A trench is dug in Type B soil that does plywood is not intended as a structural
situation that may be experienced in the
not require sheeting, but does experience
member, but only for prevention of local
field. These data were developed to apply to some minor raveling of the trench face. The
raveling (sloughing of the trench face)
the situations that are most commonly
trench is 18 feet deep and 9 feet wide. From
between shores.
I
vvv ooooioaoa
v? : i;
Federal Register / VoL 54, No. 209 / Tuesday, October 31, 1989 / Rules and Regulations
(8) See appendix C for timber specifications.
(9} Wales are calculated for simple span conditions.
(10) See appendix D. item (d). for basis and limitations of the data.
BILLING COOE 4S10-2S-W
459C1
VVV 000010809
453C2
Federal Register / VoL 54, No. 209 / Tuesday, October 31, 1339 / Rules and Regulations
ALUMINUM HYDRAULIC SHORING TYPICAL INSTALLATIONS
FIGURE NO. 3
VERTICAL ALUUMUM
FIGURE NO. 4
VVV 000010810
Federal Register / Vol. 54, No. 209 / Tuesday, October 3 1 .19S9 / Rules and Regulations
VVV 000010811
< j ' jii'iliMtiMMiii
DEPTH OF
TRENCH
(FEET) OVER
5 UP TO
10 OVER
10 UP TO
15 OVER
15 UP TO
20
OVER 20
^ *c? %* &ft",
MAXIMUM HORIZONTAL
SPACING
(FEET)
TABLED - 1.1 ALUMINUM HYDRAULIC SHORING
VERTICAL SHORES FOR SOIL TYPE A
HYDRAULIC CYLINDERS
MAXIMUM VERTICAL SPACING
(FEET)
WIDTH OF TRENCH (FEET)
UP TO 8
\
OVER 8 UP TO 12
OVER 12 UP TO 15
8
84 7
NOTE(l)
2 INCH DIAMETER
2 INCH DIAMETER
NOTE (2)
3 INCH DIAMETER
Footnotes to tables, and general notes on hydraulic shoring, are found in Appendix D, Item (g) 1 Note (1): See Appendix D, Item (g) (I)
Note (2): See Appendix D, Item (g) (2)
DEPTH OF
TRENCH
(FEET)
OVER 5
UP TO 10
OVER 10
UP TO 15
OVER 15
UP TO 20
OVER 20
MAXIMUM HORIZONTAL
SPACING
(FEET)
TABLED * 1.2 ALUMINUM HYDRAULIC SHORING
VERTICAL SHORES FOR SOIL TYPE B
HYDRAULIC CYLINDERS
MAXIMUM , VERTICAL
SPACING
(FEET) ;
WIDTH OF TRENCH (FEET)
UP TO 8
OVER 8 UP TO 12
OVER 12 UP TO 15
8
6.5 4 5.5
NOTE (I)
2 INCH DIAMETER
2 INCH DIAMETER
NOTE (2)
3 INCH DIAMETER
218010000
Footnotes to tables, and general notes on hydraulic shoring, arc found in Appendix D, Item (g) Note (1): See Appendix D, Item (g) (1) Note (2): See Appendix D, Item (g) (2)
II
Federal Register / Vol. 54, No. 209 / Tuesday, October 31,1939 } Rules and Regulations
DEPTH OF
TRENCH
(FEET)
OVER 5
UP TO 10
OVER 10
UP TO 15
OVER 15
UP TO 20
OVER 20
TABLED -1.3 ALUMINUM HYDRAULIC SHORING
WALER SYSTEMS FOR SOIL TYPED
WALES
HYDRAULIC CYLINDERS WIDTH OF TRENCH (FEET)
TIMBER UPRIGHTS
MAX.HORIZ,SPACING (ON CENTER)
VERTICAL SECTION SPACING MODULUS
(FEET) (IN1)
3.5 4 7.0
UP TO 8 HORIZ. CYLINDER SPACING DIAMETER
8.0 2 IN
. 9.0 2 IN
OVER 8 UP TO 12 OVER 12UPT015 SOLID 2 FT.
HORIZ. CYLINDER HORIZ. CYLINDER SHEET SPACING DIAMETER SPACING DIAMETER
2 IN 8.0 NOTE(2) 8.0
2 IN 9.0 NOTE(2) 9.0
3 IN 3 IN
- -----------
3 FT. 3x12
14.0 12.0 3.5 6.0 7.0 8.0
3 IN 2 IN 3 IN
12.0 3 IN 12.0 2 IN
6.0 NOTE(2)
8.0 3 IN 8.0
3 IN -- 3x12
3 IN
14.0 10.0 3.5 5.5
3 IN 10.0
3 IN 10.0
2 IN 2 IN 5.5 NOTE(2) 5.5
3 IN 3 IN
4
7.0 6.0 3 IN
6.0 3 IN
6.0 3 IN 3x12 --
14.0 9.0 3 IN 9.0 3 IN 9.0 3 IN NOTE (I)
Footnotes to tables, and general notes on hydraulic shoring, are found in Appendix D, Item (g) Notes (I): Sec Appendix D, item (g) (1) Notes (2): See Appendix D, Item (g) (2)
* Consult product manufacturer and/or qualified engineer for Section Modulus of available wales.
w v 000010813
4395
i
45986
/Federal Register Vol. 54, No. 209 / Tuesday, October 31,1989 / Rules and Regulations
DEPTH OF
TRENCH
(FEET)
OVER 5
UP TO 10
OVER 10
UP TO 15
OVER 15
UP TO . 20
OVER 20
TABLED - 1.4 ALUMINUM HYDRAULIC SHORING
WALER SYSTEMS FOR SOIL TYPEC
WALES
HYDRAULIC CYLINDERS WIDTH OF TRENCH (FEET)
TIMBER UPRIGHTS
MAX.HORIZ SPACING (ON CENTER)
VERTICAL SECTION SPACING MODULUS
UP TO 8
OVER 8 UP TO 12 OVER 12 UP TO 15 SOLID 2 FT.
UORIZ. CYLINDER UORIZ. CYLINDER HORIZ. CYLINDER SHEET
(FEET)
(IN') SPACING DIAMETER SPACING DIAMETER SPACING DIAMETER
2 IN ^ 3.5 6.0 2 IN 6.0 NOTE(2) 6.0 3 IN
4
' 2 IN 7.0 6.5 2 IN 6.5 NOTE(2) 6.5 3 IN 3x12 ~
3 FT.
14,0 10.0 3.5 4.0
3 IN 10.0
3 IN 10.0
2 IN 2 IN 4.0 NOTE(2) 4.0
3 IN 3 IN
4
7.0
5.5
3 IN
5.5
3 IN
5.5
3x12 -- 3 IN
14.0 8.0 3 IN 8.0 3 IN 8.0 3 IN
2 IN
3.5
3.5
2 IN
3.5 NOTE(2) 3.5
3 IN
4 7.0 5.0 3 IN 5.0 3 IN 5.0 3 IN 3x12 --
14.0 6.0 3 IN 6.0 3 IN 6.0 3 IN NOTE (1)
Footnotes to tables, and general notes on hydraulic shoring, are found in Appendix D, Item (g) Notes (1): See Appendix D, item (g) (1) Notes (2): See Appendix D, Item (g) (2) * Consult product manufacturer and/or qualified engineer for Section Modulus of available wales.
BILUMO CODE 4510-26-C
VVV 0 0 0 0 1 0 8 1 4
Federal Register / VoK 54. No. 209 / Tuesday, October 31, 1989 / Rules and Regulations Appendix E to Subpart P--Alternatives to Timber Shoring
Figure 1. Aluminum Hydraulic Shoring
45087
Figure 2. Pneumatic/hydraulic Shoring
BILLING CODE 4S10-2B-4I
Fk.,
7s -M
A
1)0 0 0 0 1
-------------- --> u
000010815
45988
Federal Register / Vol. 54, No. 209 / Tuesday, October 31,1989 / Rules and Regulations
Figure 3. Trench Jacks (Screw Jacks)
b
VVV 000010516
Federal Register / Vol. 54. No. 209 / Tuesday, October 31, 1989 / Rules and Regulations 45S89 Appendix F to Subpart P--Selection of Protective Systems
The foliowing figures are a graphic summary of the requirements contained in subpart P for excavations 20 feet or less in depth. Protective systemsfor use in excavations more than 20 feet in depth must be designed by a registered professional engineer in accordance with i 1926.652 fb) and (c).
FIGURE 1 - PRELIMINARY DECISIONS
BILUNG COOE 4S1S-26-H
vvv 000010817
45390
Federal Register / Vol. 54. No. 209 / Tuesday. October 31,1989 / Rules and Regulations
vvv ooooiosie
Federal Register / Voi. 54, No. 209 / Tuesday, October 31,1039 / Rules and Regulations
45391
Shoring or shielding selected as the method of protection.
Soil classification is required when shoring or shielding is used. The excavation must comply with.one of the following four options:
Option 1 ,^1926.652 (c)(1) which requires
Appendices A and C to be followed (e.g. timber shoring).
Option 2 1926.652 (c)(2) which requires
manufacturers data to be followed (e.g. hydraulic shoring,trench jacks, air shores, shields).
Option 3 51926.652 (c)(3) which requires
tabulated data (see definition) to be followed (e.g. any system as per the tabulated data).
Option 4 ,1926.652 (c)(4) which requires
the excavation to be designed by a registered professional engineer (e.g. any designed system).
FIGURE 3 - SHORING AND SHIELDING OPTIONS
IFR Doc. 89-25217 Filed 10-30-89; 8:45 am]