UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 5 77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604 DATE: SUBJECT: See Date of Section Chief Signature Below CLEAN AIR ACT INSPECTION REPORT FROM: THRU: TO: Karyn DeFranco, Inspector AECAB (MN/OH) Brian Dickens, Section Chief AECAB (MN/OH) File BASIC INFORMATION Facility Name: Central Steel and Wire Co Facility Location: 300 W 51st St., Chicago, IL 60632 Date of Inspection: 08/10/2021 EPA Inspector(s): 1. Karyn DeFranco, Inspector 2. Karina Kuc, Inspector Other Attendees: 1. Paula Santiago, Safety Manager, Central Steel and Wire Co. 2. Daniel Orozco, General Manager of Operations, Central Steel and Wire Co. 3. Kenneth Stack, Production Shift Supervisor, Central Steel and Wire Co. Contact Email Address: paula_santiago@centralsteel.com Purpose of Inspection: To investigate compliance with the Clean Air Act and investigate HAP and VOC emissions. Facility Type: Metal Service Center facility Regulations Central to Inspection: Illinois SIP HAP and VOC emission limits. Arrival Time: August 10th, 2021, 11:26 AM Departure Time: August 10th, 2021, 1:36 PM Inspection Type: Unannounced Inspection Announced Inspection OPENING CONFERENCE Presented Credentials Stated authority and purpose of inspection Provided Small Business Resource Information Sheet Small Business Resource Information Sheet not provided. Reason: Provided CBI warning to facility The following information was obtained verbally from Central Steel and Wire Co. unless otherwise noted. Company Ownership: Ryerson acquired Central Steel and Wire Co. (Central Steel) approximately 3 years ago. Process Description: Steel, carbon and aluminum products such as tubes, bars, sheets, coils, etc. are brought to the facility via truck or rail and entered into Central Steel's internal database and then processed according to order specifications. Product processing includes sawing, shearing, burning, blasting, and coil processing, such as slitting and cutting. The finished products are stored onsite before being shipped to customers. Staff Interview: Central Steel currently has approximately 322 employees and typically operates 24 hours, 5 days per week. Central Steel estimates processing approximately 200,000-300,000 lbs/day of product. Central Steel has four burning machines to heat steel products with an open flame. The steel is placed on top of metal grates with water underneath and then exposed to the open flame from the burning machines. The first and second burning machines are used to process mild steel and use natural gas to fuel the flame. The third burning machine is used to process mild steel as well and is an oxyburner that uses natural gas and oxygen to fuel the flame. The burner in Bay 5, "Burner 5," is a plasma burner and is used to process stainless steel and uses a combination of three gases, including nitrogen, to fuel the flame. Central Steel changes the grates to burner 5 every ~6-7 months to minimize smoke. Page 2 of 5 All burning machines except for burner 5 are vented to atmosphere. Burner 5 runs batch processes for ~40 hours per week. Burner 5 is vented to a baghouse, Machine No. 3845, which is manually turned on when burner 5 is running. Central Steel has a new dip tank, installed ~3 months prior to the inspection, to remove rust from parts. The dip tank vents directly to the room. Central Steel also has a shop blaster that vents to a baghouse, Machine No. 3821. The baghouse for the shop blaster is on when the shop blaster is on and pressure is ideally maintained between 0-4 psig. Central Steel was unfamiliar with any baghouse maintenance on either baghouse. TOUR INFORMATION EPA Tour of the Facility: Yes Data Collected and Observations: EPA toured the facility. EPA inspected process areas, emission vents from units, and the two baghouses. The burner 5 machine was not operating at the time of the inspection and the associated baghouse, Machine No. 3845, was also not operating. EPA saw that the control panel for baghouse Machine No. 3845 was flashing green and read "maintenance required." Photos and/or Videos: were taken during the inspection. Field Measurements: were not taken during this inspection. CLOSING CONFERENCE Provided U.S. EPA point of contact to the facility Requested documents: Current Air Permit; 2020 Records for both baghouses including: o Preventative maintenance (PM); o Maintenance and procedures; o Pressure readings; o Cleanouts/replacements/repair; Air emissions reporting (AER) and calculations spreadsheet for 2019 and 2020; SDS sheets and 2020 throughput of: o Degreasers; o Preventative rust spray; o Preventative rust dip used in the dip tank; and o Coolant(s) used at the facility including, but not limited to, coolants for the bandsaw and the KASTO saw systems; Page 3 of 5 Concerns: EPA discussed concerns about baghouse maintenance and the control panel on baghouse Machine No. 3845. DIGITAL SIGNATURES KARYN Digitally signed by KARYN DEFRANCO Report Author: D__E__F_R__A_N__C_O______D-_0a5_t'e0_:02'_02_1_.0_9._08_1_3:_54_:1_4___ Brian Dickens Digitally signed by Brian Dickens Date: 2021.09.09 07:07:21 Section Chief: __________________-0_5_'00_' _____________ Page 4 of 5 Facility Name: Central Steel and Wire Co. Facility Location: 500 W 51st St., Chicago, 60632 Date of Inspection: August 10, 2021 APPENDICES AND ATTACHMENTS 1. Appendix A: Digital Image Log Page 5 of 5 Contains Items Claimed as CBI - Non-Releasable Facility Name: Central Steel and Wire Co. Facility Location: 500 W 51st St., Chicago, 60632 Date of Inspection: August 10, 2021 CONFIDENTIAL BUSINESS INFORMATION ATTACHMENT NONE CBI Page 1 of 1 Facility Name: Facility Name Facility Location: Facility Address Date of Inspection: Select date by clicking on the arrow APPENDIX A: DIGITAL IMAGE LOG 1. Inspector Name: Karina Kuc 2. Archival Record Location: C:\Users\kdefranc\OneDrive - Environmental Protection Agency (EPA)\Community Group\SE Chicago 2021\081021 Inspections\Central Wire and Steel\081021 Inspection Photos Image Number 1 2 3 File Name IMG_0001.JPG IMG_0002.JPG IMG_0003.JPG Date and Time (incl. Time zone and DST) 2021:08:10 13:51:32 2021:08:10 14:01:03 2021:08:10 14:14:41 Description of Image Baghouse Control Box (Machine No 3845). Baghouse for burner in Bay 5. Pressure Gage Baghouse (Machine No. 3821) for Shop Blaster; Shop Blaster was not operating at the time. Baghouse (Machine No. 3845) for burner in Bay 5. Appendices Page 1 of 1